<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"><channel><title>Every Line Item</title><description>California ADU line-item cost breakdowns: every phase priced so you can see where the money goes. 400 vs 800 sq ft, garage conversion, soft costs, ROI.</description><link>https://everylineitem.com/</link><item><title>Oxnard ADU Fees 2026: Ventura County&apos;s Coastal Fee Profile</title><link>https://everylineitem.com/posts/oxnard-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/oxnard-adu-cost/</guid><description>An 800 sq ft detached ADU in Oxnard priced phase by phase — $308,000 floor. Ventura County&apos;s coastal HCD #19 city keeps the standard 750 sq ft cliff in ordinance Sec. 15-183, runs permits on a valuation schedule it won&apos;t price out per square foot, and splits its $4,136 school fee across two districts.</description><pubDate>Thu, 12 Nov 2026 01:00:00 GMT</pubDate></item><item><title>San Diego County ADU Fees Compared: $308K to $344K in 30 Miles</title><link>https://everylineitem.com/posts/san-diego-county-adu-fees-compared/</link><guid isPermaLink="true">https://everylineitem.com/posts/san-diego-county-adu-fees-compared/</guid><description>The same 800 sq ft ADU, three San Diego County fee philosophies: Chula Vista $308,000 (flat $3,951 permit, 12 pre-approved plans), Oceanside $313,000 (ordinance DIF $0 — but a city draft study disagrees), and the City of San Diego $344,000 (a ~$16,500 permit bill). A $36,000 spread inside one county — and the December-vs-January SB 1117 question.</description><pubDate>Wed, 11 Nov 2026 01:00:00 GMT</pubDate></item><item><title>How to Read Your City&apos;s Fee Schedule (Without Calling the Permit Counter)</title><link>https://everylineitem.com/posts/how-to-read-city-fee-schedule/</link><guid isPermaLink="true">https://everylineitem.com/posts/how-to-read-city-fee-schedule/</guid><description>Every number on this site comes from a city fee schedule — a PDF most homeowners never open. A practical walkthrough of where fee schedules live, how valuation tables and flat fees work, which line items actually apply to ADUs, and why the declared valuation is the number that matters most.</description><pubDate>Tue, 10 Nov 2026 01:00:00 GMT</pubDate></item><item><title>Downey ADU Fees 2026: $0 Impact Fees Under 750 Sq Ft — $4,972 Permits Above It</title><link>https://everylineitem.com/posts/downey-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/downey-adu-cost/</guid><description>An 800 sq ft detached ADU in Downey priced phase by phase — $311,000. The series study in split personality: Ordinance 23-1507 waives impact fees under 750 sq ft, but valuation-based permits reach ~$4,972 on an assumed $150,000 valuation. The pre-approved plan program exists in name only — zero plans registered as of July 2026.</description><pubDate>Sun, 08 Nov 2026 10:30:00 GMT</pubDate></item><item><title>ADU Financing Compared: HELOC vs Construction Loan vs Cash-Out Refi</title><link>https://everylineitem.com/posts/adu-financing-compared-heloc-construction-loan/</link><guid isPermaLink="true">https://everylineitem.com/posts/adu-financing-compared-heloc-construction-loan/</guid><description>Four ways to fund a $320,000 ADU — HELOC, construction-to-permanent, cash-out refinance, and home equity loan — plus the CalHFA grant that used to cover pre-development. Rate ranges, timelines, and the decision math, with no invented numbers.</description><pubDate>Sun, 08 Nov 2026 01:00:00 GMT</pubDate></item><item><title>Chico ADU Cost 2026: $308,000 Floor — A $5.38 School Fee and a Valuation-Based Seismic Surcharge</title><link>https://everylineitem.com/posts/chico-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/chico-adu-cost/</guid><description>An 800 sq ft detached ADU in Chico priced phase by phase — $308,000 floor. The school fee is the $5.38 state maximum from Chico Unified, the ADU permit is a flat $1,460, and a seismic surcharge of 0.013% of valuation adds $41.60. The building permit fee and impact fees are not yet verified, so this total is a floor.</description><pubDate>Sun, 08 Nov 2026 00:00:00 GMT</pubDate></item><item><title>Grover Beach ADU Cost 2026: $305,000 Floor — A $2,984 Permit and a $0 Water Connection</title><link>https://everylineitem.com/posts/grover-beach-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/grover-beach-adu-cost/</guid><description>An 800 sq ft detached ADU in Grover Beach priced phase by phase — $305,000 floor. The building permit and plan check come as one flat $2,984 R3 line, the water and sewer connection is $0 on a shared existing service, and the Quimby fee is $0 because it applies only at subdivision. The school fee is not yet verified, so this total is a floor.</description><pubDate>Sun, 08 Nov 2026 00:00:00 GMT</pubDate></item><item><title>San Mateo County ADU Cost 2026: $314,637 Floor, Unincorporated Permit Stack</title><link>https://everylineitem.com/posts/san-mateo-county-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/san-mateo-county-adu-cost/</guid><description>800 sq ft detached ADU in unincorporated San Mateo County: $314,637 floor built from a full county permit stack, a fire review fee, and a $4,304 school fee. Percentage surcharges are quantified but not counted pending the county&apos;s combined-fee worksheet.</description><pubDate>Sun, 08 Nov 2026 00:00:00 GMT</pubDate></item><item><title>Vallejo ADU Cost 2026: $307,000 Floor — The Sewer District Sets the Price</title><link>https://everylineitem.com/posts/vallejo-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/vallejo-adu-cost/</guid><description>An 800 sq ft detached ADU in Vallejo priced phase by phase — $307,000 floor. The Vallejo Flood &amp; Wastewater District sets the price: a $2,865 sanitary sewer capacity charge for a detached ADU of 800–899 sq ft on the Mainland, plus $580 plan review, $400 inspection, and $61.94 processing. The school fee and the building permit fee are not yet verified, so this total is a floor.</description><pubDate>Sun, 08 Nov 2026 00:00:00 GMT</pubDate></item><item><title>Watsonville ADU Cost 2026: $308,000 Floor — Three $0 Impact Fees, Each with Its Own Threshold</title><link>https://everylineitem.com/posts/watsonville-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/watsonville-adu-cost/</guid><description>An 800 sq ft detached ADU in Watsonville priced phase by phase — $308,000 floor. Three impact fees are $0, each for its own reason: Public Facilities (detached structures of 1,000 sq ft or less), Affordable Housing In-Lieu (ADUs), and Public Art (under 2,000 sq ft of new floor area or $500,000 valuation). The building permit is $3,655 and plan check $2,448.85. The school fee is not yet verified, so this total is a floor.</description><pubDate>Sun, 08 Nov 2026 00:00:00 GMT</pubDate></item><item><title>Burlingame ADU Cost 2026: $309,000–$310,000 Floor — Water and Sewer Capacity Priced per Square Foot, Basis Unclear</title><link>https://everylineitem.com/posts/burlingame-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/burlingame-adu-cost/</guid><description>An 800 sq ft detached ADU in Burlingame priced phase by phase — $309,000–$310,000 floor. Water and sewer capacity charges are priced per square foot over 150 sq ft, but the assessable basis is ambiguous, so the total is a range. The school fee and the general building permit are not yet verified, so this total is a floor.</description><pubDate>Sat, 07 Nov 2026 08:00:00 GMT</pubDate></item><item><title>Concord ADU Cost 2026: $313,000–$316,000 Floor — Flat-Band Impact Fees and Six Free Pre-Approved Plans</title><link>https://everylineitem.com/posts/concord-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/concord-adu-cost/</guid><description>An 800 sq ft detached ADU in Concord priced phase by phase — $313,000–$316,000 floor. Two impact fees are flat amounts in a 750–1,200 sq ft band, and the tier depends on whether the ADU exceeds 40% of the primary dwelling — so the total is a range. The building permit fee is not yet verified, so this total is a floor. Concord offers six free pre-approved plans with plan-check fees waived.</description><pubDate>Sat, 07 Nov 2026 08:00:00 GMT</pubDate></item><item><title>Corona ADU Cost 2026: $305,000 Floor — Every Impact Fee Is $0</title><link>https://everylineitem.com/posts/corona-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/corona-adu-cost/</guid><description>An 800 sq ft detached ADU in Corona priced phase by phase — $305,000 floor, the lowest floor in this series so far. Every impact fee is $0: the DIF Update 2026 leaves the ADU column blank, the county TUMF exempts ADUs program-wide, and Quimby is collected at subdivision. The only fee line is a $3,096 sewer capacity charge. School and permit fees are not yet verified, so this total is a floor.</description><pubDate>Sat, 07 Nov 2026 08:00:00 GMT</pubDate></item><item><title>Moreno Valley ADU Cost 2026: $310,000 — Seven Free Pre-Approved Plans and a $0 TUMF</title><link>https://everylineitem.com/posts/moreno-valley-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/moreno-valley-adu-cost/</guid><description>An 800 sq ft detached ADU in Moreno Valley priced phase by phase — $310,000. TUMF is $0 for an ADU (exempt), the permit package is $3,746 all-in (plan check, inspection, filing), the school fee is $4,304, and the city offers seven free pre-approved plans. The schedule&apos;s other impact-fee lines are proportional at 750+ sq ft and not in the total. Water and sewer connection charges are not yet verified.</description><pubDate>Sat, 07 Nov 2026 08:00:00 GMT</pubDate></item><item><title>Napa ADU Cost 2026: $325,000 — A $10,033 Sewer Capacity Charge Tops the Ledger</title><link>https://everylineitem.com/posts/napa-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/napa-adu-cost/</guid><description>An 800 sq ft detached ADU in Napa priced phase by phase — $325,000, the highest total in this series so far. The NapaSan sewer capacity charge is $10,032.80 — the largest single verified ADU fee we have published — plus a $2,125 flat building permit, a $4,304 school fee and $6,093 in impact fees. SB 1117 saves $3,562 on the per-square-foot line.</description><pubDate>Sat, 07 Nov 2026 08:00:00 GMT</pubDate></item><item><title>Beverly Hills ADU Cost 2026: $305,000 Floor — $0 Water, $0 Wastewater, and a $1,416 Covenant</title><link>https://everylineitem.com/posts/beverly-hills-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/beverly-hills-adu-cost/</guid><description>An 800 sq ft detached ADU in Beverly Hills priced phase by phase — $305,000 floor. The most expensive city in this series charges $0 for water capacity, $0 for wastewater capacity and $0 for planning on a building-permit-only ADU — but a $1,416 covenant recordation fee. The school fee is not yet verified, so this total is a floor.</description><pubDate>Sat, 07 Nov 2026 01:00:00 GMT</pubDate></item><item><title>Inland Empire ADU Fees Compared: Riverside vs Fontana vs San Bernardino</title><link>https://everylineitem.com/posts/inland-empire-adu-cost-compared/</link><guid isPermaLink="true">https://everylineitem.com/posts/inland-empire-adu-cost-compared/</guid><description>Three Inland Empire cities, three fee philosophies, 30 miles apart. Riverside&apos;s $1,006 permit, Fontana&apos;s $20,563 impact fee, San Bernardino&apos;s plain-language cliff — the region&apos;s ADU math side by side.</description><pubDate>Sat, 07 Nov 2026 01:00:00 GMT</pubDate></item><item><title>Los Altos Hills ADU Cost 2026: $308,000 — Three Impact Fees at $0</title><link>https://everylineitem.com/posts/los-altos-hills-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/los-altos-hills-adu-cost/</guid><description>An 800 sq ft detached ADU in Los Altos Hills priced phase by phase — $308,000. The town&apos;s pathway, recreation in-lieu and storm drainage impact fees are all $0 for an ADU, the school fee is a combined $5.38 from two districts, and the permit column is $1,555.</description><pubDate>Sat, 07 Nov 2026 01:00:00 GMT</pubDate></item><item><title>Redlands ADU Cost 2026: $309,000 Floor — Eight Per-Square-Foot Impact Fees From One Ordinance</title><link>https://everylineitem.com/posts/redlands-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/redlands-adu-cost/</guid><description>An 800 sq ft detached ADU in Redlands priced phase by phase — $309,000 floor. Every impact fee is a per-square-foot line from a single ordinance (Ord. 2968), so the 750 sq ft cliff is clean and the SB 1117 saving is exactly $4,080. School and permit fees are not yet verified, so this total is a floor.</description><pubDate>Sat, 07 Nov 2026 01:00:00 GMT</pubDate></item><item><title>Santa Clara ADU Cost 2026: $313,000 — A Fully Itemised Permit Schedule and $0 Water and Electric</title><link>https://everylineitem.com/posts/santa-clara-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/santa-clara-adu-cost/</guid><description>An 800 sq ft detached ADU in Santa Clara priced phase by phase — $313,000. A fully itemised scaled permit schedule ($2,488.80 plan review, $2,309.70 inspection), water and electric connection and capacity at $0 for an ADU, and no impact-fee lines at all.</description><pubDate>Sat, 07 Nov 2026 01:00:00 GMT</pubDate></item><item><title>Upland ADU Cost 2026: $308,000 Floor — A Parks-Heavy DIF Schedule</title><link>https://everylineitem.com/posts/upland-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/upland-adu-cost/</guid><description>An 800 sq ft detached ADU in Upland priced phase by phase — $308,000 floor. The Parks DIF at $4.80 per square foot is 61% of all per-square-foot lines, the cliff is published on the city&apos;s own ADU page, and the SB 1117 saving at 1,000 sq ft is $5,235. School and permit fees are not yet verified, so this total is a floor.</description><pubDate>Sat, 07 Nov 2026 01:00:00 GMT</pubDate></item><item><title>Which California Cities Waived ADU Fees in 2026</title><link>https://everylineitem.com/posts/california-cities-waived-adu-fees-2026/</link><guid isPermaLink="true">https://everylineitem.com/posts/california-cities-waived-adu-fees-2026/</guid><description>Salinas zeroed out development impact fees. Oakland exempts ADUs from impact fees entirely. Oceanside&apos;s waiver could not be confirmed on the city&apos;s current page. The waiver trend, city by city — and what it means for your 2027 build.</description><pubDate>Fri, 06 Nov 2026 01:00:00 GMT</pubDate></item><item><title>Do You Need Separate Insurance for Your ADU?</title><link>https://everylineitem.com/posts/do-you-need-separate-insurance-adu/</link><guid isPermaLink="true">https://everylineitem.com/posts/do-you-need-separate-insurance-adu/</guid><description>Homeowner endorsement, landlord policy, or builder&apos;s risk — which insurance your ADU actually needs, when, and what it costs. The coverage questions to ask before the first tenant moves in.</description><pubDate>Thu, 05 Nov 2026 01:00:00 GMT</pubDate></item><item><title>Riverside County ADU Permit Cost: $6,472 Deposit, $0 County Impact Fees</title><link>https://everylineitem.com/posts/riverside-county-adu-permit-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/riverside-county-adu-permit-cost/</guid><description>Unincorporated Riverside County ADU permits: a $6,472.45 deposit (not the final cost), $0 county impact fees by exemption, school fees up to $4,304, and four free pre-approved plans. Incorporated cities have their own schedules.</description><pubDate>Wed, 04 Nov 2026 16:00:00 GMT</pubDate></item><item><title>Palo Alto ADU Fees 2026: The $18,090 Question Mark at 750 Sq Ft</title><link>https://everylineitem.com/posts/palo-alto-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/palo-alto-adu-cost/</guid><description>An 800 sq ft detached ADU in Palo Alto priced phase by phase — about $313,000, level with the lowest published total in the series. The steepest per-square-foot 750 cliff we&apos;ve documented, the most dramatic SB 1117 effect, and an honest correction of our own earlier numbers.</description><pubDate>Wed, 04 Nov 2026 01:00:00 GMT</pubDate></item><item><title>The $12,000 Spread: Ranking 10 California Cities by Total ADU Cost</title><link>https://everylineitem.com/posts/california-adu-cost-ranked-10-cities/</link><guid isPermaLink="true">https://everylineitem.com/posts/california-adu-cost-ranked-10-cities/</guid><description>Same 800 sq ft ADU, ten California cities, $12,000 apart. The master ranking table for the series — Long Beach ($313,000) to San Francisco ($325,000) — and what the spread actually tells you about where fees bite.</description><pubDate>Tue, 03 Nov 2026 01:00:00 GMT</pubDate></item><item><title>Campbell ADU Fees 2026: Two Districts, One $5.38 School Fee</title><link>https://everylineitem.com/posts/campbell-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/campbell-adu-cost/</guid><description>An 800 sq ft detached ADU in Campbell priced phase by phase — about $310,000 at schedule caps. The $5.38/sq ft school fee at the Level I cap (two districts, one parcel), valuation-based permits, and West Valley Sanitation&apos;s per-fixture-unit sewer math.</description><pubDate>Mon, 02 Nov 2026 18:00:00 GMT</pubDate></item><item><title>The ADU Permit Clocks: 15 Days, 60 Days, and the Fine Print</title><link>https://everylineitem.com/posts/adu-permit-clocks-15-60-days/</link><guid isPermaLink="true">https://everylineitem.com/posts/adu-permit-clocks-15-60-days/</guid><description>Two clocks govern California ADU permits: 15 business days for completeness, 60 days for a decision. The fine print on cure lists, tolling, and the JADU gap.</description><pubDate>Sun, 01 Nov 2026 16:00:00 GMT</pubDate></item><item><title>ADU Solar&apos;s Property-Tax Exclusion Ends January 1, 2027</title><link>https://everylineitem.com/posts/adu-solar-property-tax-exclusion-ends-2027/</link><guid isPermaLink="true">https://everylineitem.com/posts/adu-solar-property-tax-exclusion-ends-2027/</guid><description>California&apos;s solar property-tax exclusion ends January 1, 2027. What counts, what survives a sale, and the 2026 completion trap for ADU solar.</description><pubDate>Sun, 01 Nov 2026 16:00:00 GMT</pubDate></item><item><title>SB 1117: Should You Wait Until January to Permit Your ADU?</title><link>https://everylineitem.com/posts/sb-1117-wait-or-permit-now/</link><guid isPermaLink="true">https://everylineitem.com/posts/sb-1117-wait-or-permit-now/</guid><description>From January 1, 2027, impact fees on the first two ADUs on a lot apply only to the area above 750 sq ft. The 800 sq ft savings, city by city, and why flat fees are still unknown.</description><pubDate>Sun, 01 Nov 2026 16:00:00 GMT</pubDate></item><item><title>Sewer, Water, Power: ADU Utility Bills</title><link>https://everylineitem.com/posts/adu-utility-bills-sewer-water-power/</link><guid isPermaLink="true">https://everylineitem.com/posts/adu-utility-bills-sewer-water-power/</guid><description>Capacity charges, connection fees, panel upgrades — the $0 to $10,000 range nobody puts in the quote. Why sewer is the most volatile ADU line.</description><pubDate>Sun, 01 Nov 2026 01:00:00 GMT</pubDate></item><item><title>The 499 Sq Ft Line: One Foot Costs $2,690</title><link>https://everylineitem.com/posts/499-sq-ft-line-school-fee-cliff/</link><guid isPermaLink="true">https://everylineitem.com/posts/499-sq-ft-line-school-fee-cliff/</guid><description>School fees turn on one sentence: units under 500 sq ft of interior livable space are exempt. At the 2026 cap of $5.38/sq ft, the 500th foot triggers $2,690.</description><pubDate>Sat, 31 Oct 2026 18:03:29 GMT</pubDate></item><item><title>10 Lines Missing From Every ADU Quote</title><link>https://everylineitem.com/posts/10-lines-missing-from-every-adu-quote/</link><guid isPermaLink="true">https://everylineitem.com/posts/10-lines-missing-from-every-adu-quote/</guid><description>A contractor&apos;s &apos;all-in&apos; quote rarely includes government, tax, or reserve lines. Ten lines after signing, with ranges from verified California fee ledgers.</description><pubDate>Sat, 31 Oct 2026 10:17:00 GMT</pubDate></item><item><title>Cities Can Be Sued for ADU Permit Delays: What the Palos Verdes Ruling Means</title><link>https://everylineitem.com/posts/cities-sued-adu-permit-delays-palos-verdes-ruling/</link><guid isPermaLink="true">https://everylineitem.com/posts/cities-sued-adu-permit-delays-palos-verdes-ruling/</guid><description>On 23 October 2026, a California appeals court revived a homeowner&apos;s damages claim over a three-year ADU permit delay. The ruling, the 60-day ministerial rule behind it, and the paper trail applicants should keep — plus what the court did not decide.</description><pubDate>Sat, 31 Oct 2026 01:00:00 GMT</pubDate></item><item><title>Pasadena ADU Fees 2026: $2.24 School Fees and City-Designed Free Plans</title><link>https://everylineitem.com/posts/pasadena-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/pasadena-adu-cost/</guid><description>An 800 sq ft detached ADU in Pasadena priced phase by phase — about $310,000. The series-low $2.24/sq ft school fee, a proportional impact fee tied to your main house, and a city-run pre-approved plan program with published permit estimates.</description><pubDate>Sat, 31 Oct 2026 01:00:00 GMT</pubDate></item><item><title>Will an ADU Raise My Property Tax? (Prop 13, Explained)</title><link>https://everylineitem.com/posts/will-an-adu-raise-my-property-tax-california/</link><guid isPermaLink="true">https://everylineitem.com/posts/will-an-adu-raise-my-property-tax-california/</guid><description>Building an ADU triggers a property tax reassessment — but only on the new construction, not your whole house. How Prop 13&apos;s new-construction rule works, what the assessor actually adds, and why your original tax basis stays protected.</description><pubDate>Fri, 30 Oct 2026 01:00:00 GMT</pubDate></item><item><title>3 ADU Laws Taking Effect Jan 1, 2027 (and What Changes on Your Block)</title><link>https://everylineitem.com/posts/3-adu-laws-january-2027/</link><guid isPermaLink="true">https://everylineitem.com/posts/3-adu-laws-january-2027/</guid><description>SB 1117 kills the 750 sq ft impact-fee cliff, SB 1196 forces utility connection deadlines, and AB 956 allows two detached ADUs per lot. All signed Sep 29, 2026 — all effective Jan 1, 2027. What each one changes for your project.</description><pubDate>Thu, 29 Oct 2026 01:00:00 GMT</pubDate></item><item><title>California ADU Laws Changing January 1, 2027: Two Rewrite Your Fees, One Rewrites Your Power Hookup</title><link>https://everylineitem.com/posts/california-adu-laws-january-2027/</link><guid isPermaLink="true">https://everylineitem.com/posts/california-adu-laws-january-2027/</guid><description>AB 956 doubles detached ADUs, SB 1117 collapses impact fees to a 50 sq ft basis, and SB 1196 targets utility energization delays. What each law actually does.</description><pubDate>Wed, 28 Oct 2026 01:00:00 GMT</pubDate></item><item><title>San Bernardino ADU Fees 2026: The Clearest 750 Sq Ft Cliff in California Code</title><link>https://everylineitem.com/posts/san-bernardino-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/san-bernardino-adu-cost/</guid><description>An 800 sq ft detached ADU in San Bernardino priced phase by phase — $316,000 floor. The city with the clearest 750 sq ft cliff in California code: §19.04.030 spells out the pro-rata impact-fee formula in plain ordinance language. School fees confirmed at $4,304; the building permit schedule and water/sewer dollar figures are not published.</description><pubDate>Wed, 28 Oct 2026 01:00:00 GMT</pubDate></item><item><title>JADU vs ADU vs Garage Conversion: The Cheapest Way to Add a Unit</title><link>https://everylineitem.com/posts/jadu-vs-adu-vs-garage-conversion/</link><guid isPermaLink="true">https://everylineitem.com/posts/jadu-vs-adu-vs-garage-conversion/</guid><description>Three ways to add a housing unit in California, compared side by side: detached ADU ($320,000), garage conversion ($190,000), and JADU (no published total — but nearly every fee is $0). Cost, timeline, rental income, and constraints in one decision table.</description><pubDate>Tue, 27 Oct 2026 01:00:00 GMT</pubDate></item><item><title>400 sq ft ADU Cost in California: Why Smaller Is Not Cheaper (2026)</title><link>https://everylineitem.com/posts/400-sq-ft-adu-cost-california/</link><guid isPermaLink="true">https://everylineitem.com/posts/400-sq-ft-adu-cost-california/</guid><description>We modeled a 400 sq ft detached ADU in Los Angeles County. Total: $215,000 — or $538 per square foot. Here is every phase, why fixed costs dominate, and when 400 still makes sense.</description><pubDate>Mon, 26 Oct 2026 01:00:00 GMT</pubDate></item><item><title>The 750 Sq Ft Cliff, Explained: Why 50 Square Feet Can Cost $10,000</title><link>https://everylineitem.com/posts/750-sq-ft-cliff-explained/</link><guid isPermaLink="true">https://everylineitem.com/posts/750-sq-ft-cliff-explained/</guid><description>California&apos;s most expensive 50 square feet: build an ADU at 749 sq ft and pay $0 in impact fees; build at 800 and owe thousands. How the 750 sq ft cliff works, with real numbers from Glendale, Sacramento, Torrance, Palo Alto, and Fontana — and what SB 1117 changes on Jan 1, 2027.</description><pubDate>Mon, 26 Oct 2026 01:00:00 GMT</pubDate></item><item><title>800 sq ft ADU Cost in California: A Full 2026 Line-Item Breakdown</title><link>https://everylineitem.com/posts/800-sq-ft-adu-cost-california/</link><guid isPermaLink="true">https://everylineitem.com/posts/800-sq-ft-adu-cost-california/</guid><description>We modeled an 800 sq ft detached ADU in Los Angeles County and priced every phase. Total: $320,000. Here is where each dollar goes and why smaller is not cheaper.</description><pubDate>Mon, 26 Oct 2026 01:00:00 GMT</pubDate></item><item><title>ADU All-In Cost in California: Contingency, Loan Interest, Tax, and Vacancy (2026)</title><link>https://everylineitem.com/posts/adu-all-in-cost-california/</link><guid isPermaLink="true">https://everylineitem.com/posts/adu-all-in-cost-california/</guid><description>The $320,000 and $215,000 construction models are not what you actually spend. Add 12% contingency, construction loan interest, Prop 13 ADU-only tax, vacancy, and optional management — here are clear year-one all-in tables.</description><pubDate>Mon, 26 Oct 2026 01:00:00 GMT</pubDate></item><item><title>The $32,000 Line Item Nobody Quotes: ADU Contingency</title><link>https://everylineitem.com/posts/adu-contingency-guide/</link><guid isPermaLink="true">https://everylineitem.com/posts/adu-contingency-guide/</guid><description>Contractor bids never include contingency — but 10–15% ($32,000–$48,000 on a $320,000 ADU) is the industry standard reserve held by the owner. What it covers, what it doesn&apos;t, and how to size it.</description><pubDate>Mon, 26 Oct 2026 01:00:00 GMT</pubDate></item><item><title>ADU Cost Per Square Foot in California: Why the Number Misleads (and When It Helps)</title><link>https://everylineitem.com/posts/adu-cost-per-square-foot-california/</link><guid isPermaLink="true">https://everylineitem.com/posts/adu-cost-per-square-foot-california/</guid><description>An 800 sq ft ADU at $400 per foot looks cheaper than a 400 sq ft ADU at $538 — until you see which costs don&apos;t scale. How per-square-foot math works, where it breaks, and the fee lines actually priced per foot.</description><pubDate>Mon, 26 Oct 2026 01:00:00 GMT</pubDate></item><item><title>How Long Does an ADU Permit Take? The Timeline Nobody Puts in the Quote</title><link>https://everylineitem.com/posts/adu-permit-timeline/</link><guid isPermaLink="true">https://everylineitem.com/posts/adu-permit-timeline/</guid><description>State law says 60 days. Reality says plan for more. The ADU permit timeline phase by phase — completeness review, plan check rounds, corrections, inspections — with the statutory clocks (60-day approval, 15-day completeness, 30-day pre-approved review) and why &apos;6-month build&apos; quotes hide 3–4 months of paper.</description><pubDate>Mon, 26 Oct 2026 01:00:00 GMT</pubDate></item><item><title>ADU School Fees, Explained: Level 1, Level 2, and the 500 Sq Ft Exemption</title><link>https://everylineitem.com/posts/adu-school-fees-explained/</link><guid isPermaLink="true">https://everylineitem.com/posts/adu-school-fees-explained/</guid><description>Why school district fees on the same 800 sq ft ADU range from $1,792 to $4,304 across California — who sets the rate, what Level 1 vs Level 2 means, why 500 sq ft is the magic number, and the 13-city data from our fee series.</description><pubDate>Mon, 26 Oct 2026 01:00:00 GMT</pubDate></item><item><title>ADU Soft Costs in California: Permits, Design, and Plan Check Line Items (2026)</title><link>https://everylineitem.com/posts/adu-soft-costs-permits-california/</link><guid isPermaLink="true">https://everylineitem.com/posts/adu-soft-costs-permits-california/</guid><description>Soft costs on California ADUs typically land around $28,000–$40,000 before construction starts. Here is every design, engineering, plan check, and fee line — with ranges by jurisdiction type.</description><pubDate>Mon, 26 Oct 2026 01:00:00 GMT</pubDate></item><item><title>Bay Area ADU Fees Ranked: Oakland vs San Francisco vs Palo Alto vs San Jose</title><link>https://everylineitem.com/posts/bay-area-adu-fees-ranked/</link><guid isPermaLink="true">https://everylineitem.com/posts/bay-area-adu-fees-ranked/</guid><description>The same 800 sq ft ADU, four Bay Area fee philosophies: Palo Alto ~$303,000 (corrected), Oakland $322,000, San Francisco $325,000, San Jose ~$400,000. Why the &apos;expensive Bay Area&apos; assumption falls apart once you read the fee schedules — and where the 750 sq ft cliff bites hardest.</description><pubDate>Mon, 26 Oct 2026 01:00:00 GMT</pubDate></item><item><title>California ADU Impact Fees, Explained: What They Are, Which Cities Charge Them, and the 750 Sq Ft Rule</title><link>https://everylineitem.com/posts/california-adu-impact-fees-explained/</link><guid isPermaLink="true">https://everylineitem.com/posts/california-adu-impact-fees-explained/</guid><description>Impact fees are the most misunderstood ADU line: $0 at 750 sq ft or less, prorated above it, and narrowed to the area above 750 for a homeowner&apos;s first two ADUs in 2027. What counts, what doesn&apos;t, and what real cities charge.</description><pubDate>Mon, 26 Oct 2026 01:00:00 GMT</pubDate></item><item><title>Free ADU Plans: 7 California Cities That Hand You the Drawings</title><link>https://everylineitem.com/posts/free-adu-plans-california/</link><guid isPermaLink="true">https://everylineitem.com/posts/free-adu-plans-california/</guid><description>Seven California cities offer pre-approved ADU plans — from Chula Vista&apos;s 12 SnapADU designs to Pasadena&apos;s free city-drawn prototypes. What &apos;free&apos; actually saves you ($1,000–$3,000 in plan check) and what it doesn&apos;t.</description><pubDate>Mon, 26 Oct 2026 01:00:00 GMT</pubDate></item><item><title>Garage Conversion ADU Cost in California: Full 2026 Line-Item Breakdown</title><link>https://everylineitem.com/posts/garage-conversion-adu-cost-california/</link><guid isPermaLink="true">https://everylineitem.com/posts/garage-conversion-adu-cost-california/</guid><description>We modeled a typical 2-car garage conversion ADU in Los Angeles County (~450 sq ft living). Total: $190,000. See which phases shrink vs a new detached build — and which grow.</description><pubDate>Mon, 26 Oct 2026 01:00:00 GMT</pubDate></item><item><title>On Jan 1, 2027, California Kills the 750 Sq Ft Cliff — Here&apos;s What You&apos;d Save</title><link>https://everylineitem.com/posts/sb-1117-kills-750-sq-ft-cliff/</link><guid isPermaLink="true">https://everylineitem.com/posts/sb-1117-kills-750-sq-ft-cliff/</guid><description>SB 1117, signed Sept 29, 2026, rewrites the ADU impact-fee rule: from Jan 1, 2027, cities may charge fees only on square footage above 750 — not the whole unit. City-by-city savings table: Palo Alto ~$18,090 → ~$1,130; Anaheim ~$10,411 → a fraction. What changes, what doesn&apos;t, and the December-vs-January permit question.</description><pubDate>Mon, 26 Oct 2026 01:00:00 GMT</pubDate></item><item><title>The $2,512 School Fee Gap: Pasadena ($2.24) vs Campbell ($5.38)</title><link>https://everylineitem.com/posts/school-fee-gap-pasadena-campbell/</link><guid isPermaLink="true">https://everylineitem.com/posts/school-fee-gap-pasadena-campbell/</guid><description>Same 800 sq ft ADU, $2,512 difference in school fees — from school district boundaries alone. Pasadena Unified charges $2.24/sq ft; Campbell&apos;s two districts total $5.38/sq ft. Why the rate varies and who sets it.</description><pubDate>Mon, 26 Oct 2026 01:00:00 GMT</pubDate></item><item><title>The $59,854 Square Foot: 5 American Cities Where ADU Fees Break the Chart</title><link>https://everylineitem.com/posts/us-adu-fee-shockers/</link><guid isPermaLink="true">https://everylineitem.com/posts/us-adu-fee-shockers/</guid><description>From a $59,854 one-square-foot fee cliff in Maryland to a $60 building permit in Wyoming — the five wildest ADU government-fee findings from our 148-city national dataset. Every figure from an official source.</description><pubDate>Mon, 26 Oct 2026 01:00:00 GMT</pubDate></item><item><title>Chula Vista ADU Fees 2026: The Flat-Rate Permit Experiment</title><link>https://everylineitem.com/posts/chula-vista-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/chula-vista-adu-cost/</guid><description>An 800 sq ft detached ADU in Chula Vista priced phase by phase — $308,000 floor. The series standout for permit pricing transparency: a flat $3,951 ADU permit (no valuation math), 12 pre-approved SnapADU plans, and a DIF that scales proportionally to the primary residence. The school-fee split is half confirmed.</description><pubDate>Sun, 25 Oct 2026 01:00:00 GMT</pubDate></item><item><title>Oceanside ADU Fees 2026: The $0 Exemption, Unconfirmed</title><link>https://everylineitem.com/posts/oceanside-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/oceanside-adu-cost/</guid><description>An 800 sq ft detached ADU in Oceanside priced phase by phase — about $313,000. The zoning ordinance says the city &apos;shall not impose any impact fees upon the development of an ADU or JADU,&apos; but the city&apos;s ADU page no longer states the waiver and the exemption is unconfirmed as of 6 Nov 2026. Five items are awaiting confirmation from the city.</description><pubDate>Thu, 22 Oct 2026 01:00:00 GMT</pubDate></item><item><title>Valuation vs Flat vs Per-Sq-Ft: How Cities Actually Price Your ADU Permit</title><link>https://everylineitem.com/posts/permit-pricing-models/</link><guid isPermaLink="true">https://everylineitem.com/posts/permit-pricing-models/</guid><description>Three permit pricing models across California cities — valuation-based (Pasadena, Campbell), flat-fee (Fontana $3,195, Chula Vista $3,951), and per-square-foot (Oceanside ~$7,541). How to read any fee schedule before you apply.</description><pubDate>Tue, 20 Oct 2026 01:00:00 GMT</pubDate></item><item><title>Lakewood ADU Fees 2026: Your School Fee Depends on Your Street</title><link>https://everylineitem.com/posts/lakewood-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/lakewood-adu-cost/</guid><description>Lakewood spans four school districts: the same 800 sq ft ADU owes $2,376, $3,832, or $4,304 in school fees by parcel. Full phase-by-phase cost breakdown.</description><pubDate>Mon, 19 Oct 2026 01:00:00 GMT</pubDate></item><item><title>Your ADU Is Built. Now Wait a Year: SB 1196 and the Utility Connection Backlog</title><link>https://everylineitem.com/posts/sb-1196-utility-hookup-backlog/</link><guid isPermaLink="true">https://everylineitem.com/posts/sb-1196-utility-hookup-backlog/</guid><description>California ADU owners wait up to 9–12 months after construction for the utility hookup — a finished apartment with no power. SB 1196, signed Sept 2026 and effective Jan 1, 2027, orders the CPUC to set hard deadlines with penalties, and lets you file the hookup request alongside the building permit.</description><pubDate>Sun, 18 Oct 2026 01:00:00 GMT</pubDate></item><item><title>Salinas ADU Fees 2026: The First City With Zero Impact Fees</title><link>https://everylineitem.com/posts/salinas-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/salinas-adu-cost/</guid><description>Salinas charges $0 in development and traffic impact fees on ADUs — at any size. The 750 sq ft cliff doesn&apos;t apply because there&apos;s no cliff to fall off. An 800 sq ft detached ADU priced phase by phase, with the valuation-based $6,226 permit and four pre-approved plan sets drawn just under 750.</description><pubDate>Fri, 16 Oct 2026 01:00:00 GMT</pubDate></item><item><title>AB 956 Is Signed: Two Detached ADUs Per Single-Family Lot From Jan 1, 2027</title><link>https://everylineitem.com/posts/ab-956-two-adus-one-lot/</link><guid isPermaLink="true">https://everylineitem.com/posts/ab-956-two-adus-one-lot/</guid><description>Governor Newsom signed AB 956 (Chapter 791) on Sep 29, 2026 — effective Jan 1, 2027, cities must ministerially approve up to two detached new-construction ADUs on a single-family lot, up from one. Each unit: up to 800 sq ft, 4-ft side and rear setbacks, 16-ft height (18 ft near major transit). The JADU tradeoff, the HOA rule change, and the fee math with SB 1117. Verified against the official leginfo chaptered text.</description><pubDate>Thu, 15 Oct 2026 22:34:25 GMT</pubDate></item><item><title>Santa Rosa ADU Cost 2026: $320,000, Fire-Era Discount</title><link>https://everylineitem.com/posts/santa-rosa-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/santa-rosa-adu-cost/</guid><description>800 sq ft ADU in Santa Rosa: ~$320,000. 25% impact-fee cut; water/sewer $8,230 exceeds DIF.</description><pubDate>Wed, 14 Oct 2026 01:00:00 GMT</pubDate></item><item><title>Fontana ADU Fees 2026: $20,563 in Impact Fees — and a 738 Sq Ft Loophole</title><link>https://everylineitem.com/posts/fontana-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/fontana-adu-cost/</guid><description>Fontana charges $20,563 per new single-family home in development impact fees — among the heaviest in our series — but its own free 738 sq ft ADU plan slips under the 750 sq ft cliff and pays $0. An 800 sq ft detached ADU priced phase by phase, with the city&apos;s flat $3,195 permit and the state&apos;s maximum $5.38 school fee.</description><pubDate>Tue, 13 Oct 2026 01:00:00 GMT</pubDate></item><item><title>Laguna Beach ADU Cost 2026: $314,000, No Coastal Premium</title><link>https://everylineitem.com/posts/laguna-beach-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/laguna-beach-adu-cost/</guid><description>800 sq ft ADU in Laguna Beach: ~$314,000. No impact fees, $215/100 sq ft sewer, $2.05 school fee.</description><pubDate>Tue, 13 Oct 2026 01:00:00 GMT</pubDate></item><item><title>Santa Barbara ADU Cost 2026: $327,000, Priciest Permit</title><link>https://everylineitem.com/posts/santa-barbara-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/santa-barbara-adu-cost/</guid><description>800 sq ft detached ADU in Santa Barbara: ~$327,000 total. Permit + plan check ~$22,566 — the series high. No city impact fees. Phase-by-phase breakdown.</description><pubDate>Mon, 12 Oct 2026 01:00:00 GMT</pubDate></item><item><title>Encinitas ADU Cost 2026: $322,000 and a $20,663 Cliff</title><link>https://everylineitem.com/posts/encinitas-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/encinitas-adu-cost/</guid><description>800 sq ft detached ADU in Encinitas: ~$322,000 total. A 749 sq ft ADU pays $0 DIF; a 750 sq ft ADU pays $20,663. Phase-by-phase breakdown.</description><pubDate>Sun, 11 Oct 2026 01:00:00 GMT</pubDate></item><item><title>Riverside ADU Cost 2026: $309,000, Cheapest Permit</title><link>https://everylineitem.com/posts/riverside-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/riverside-adu-cost/</guid><description>800 sq ft detached ADU in Riverside: $309,000 total, $1,006 permit (series low). Phase-by-phase breakdown.</description><pubDate>Sat, 10 Oct 2026 01:00:00 GMT</pubDate></item><item><title>Prefab ADU Brands Compared 2026: Two Publish Prices, Three Don&apos;t</title><link>https://everylineitem.com/posts/prefab-adu-brands-compared-california/</link><guid isPermaLink="true">https://everylineitem.com/posts/prefab-adu-brands-compared-california/</guid><description>Five prefab ADU brands, one 800 sq ft question. Abodu and Villa Homes publish real numbers ($424,800 and from $261,000–$282,000 all-in); Boxabl, Dvele, and Mighty Buildings don&apos;t. What the price you can see actually covers — and what it doesn&apos;t.</description><pubDate>Thu, 08 Oct 2026 23:50:00 GMT</pubDate></item><item><title>Orange County ADU Cost Compared 2026: Three Cities, Three Fee Philosophies</title><link>https://everylineitem.com/posts/orange-county-adu-cost-compared/</link><guid isPermaLink="true">https://everylineitem.com/posts/orange-county-adu-cost-compared/</guid><description>The same 800 sq ft detached ADU priced in Anaheim, Fullerton, and Garden Grove — $318,000 to $320,000. Anaheim charges the series&apos; highest impact fees, Fullerton charges the series&apos; cheapest permit, and Garden Grove hands out free plans. Same county, three different answers to what an ADU should cost the city.</description><pubDate>Thu, 08 Oct 2026 04:00:00 GMT</pubDate></item><item><title>LA County ADU Cost Compared 2026: Four Cities, One 800 Sq Ft Unit, Four Price Tags</title><link>https://everylineitem.com/posts/la-county-adu-cost-compared/</link><guid isPermaLink="true">https://everylineitem.com/posts/la-county-adu-cost-compared/</guid><description>The same 800 sq ft detached ADU priced in Long Beach, Glendale, Burbank, and Torrance — $313,000 to $320,000. Same county, same state law, wildly different fee structures: flat-rate impact fees, pro-rata cliffs, ADU-specific permit lines, and a sewer cliff that exists in exactly one city.</description><pubDate>Thu, 08 Oct 2026 01:00:00 GMT</pubDate></item><item><title>Torrance ADU Cost 2026: $317,000 With the Series&apos; First Flat-Rate ADU Impact Fee</title><link>https://everylineitem.com/posts/torrance-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/torrance-adu-cost/</guid><description>An 800 sq ft detached ADU in Torrance priced phase by phase — $317,000. The first city in this series with a flat-rate ADU impact fee ($2,243.47, no pro-rata math against the house), top-tier school fees, and no ADU sewer capacity charge. Seven items are awaiting confirmation from the city.</description><pubDate>Thu, 08 Oct 2026 00:20:00 GMT</pubDate></item><item><title>Burbank ADU Fees 2026: The $3,692 Permit and a Sewer Cliff</title><link>https://everylineitem.com/posts/burbank-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/burbank-adu-cost/</guid><description>Burbank ADU fees: a $3,692 permit (series high) and a 750 sq ft cliff on the sewer bill.</description><pubDate>Wed, 07 Oct 2026 00:20:00 GMT</pubDate></item><item><title>Anaheim ADU Fees 2026: The Series&apos; Highest Impact Fees</title><link>https://everylineitem.com/posts/anaheim-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/anaheim-adu-cost/</guid><description>Anaheim ADU fees: the steepest impact fees in the series, plus the only combined permit-plus-plan-check fee.</description><pubDate>Tue, 06 Oct 2026 18:36:00 GMT</pubDate></item><item><title>Fullerton ADU Fees 2026: The $1,223 Permit and a Two-District School Fee</title><link>https://everylineitem.com/posts/fullerton-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/fullerton-adu-cost/</guid><description>Fullerton ADU fees: the cheapest permit in the series ($1,223) and a two-district school fee.</description><pubDate>Tue, 06 Oct 2026 17:05:00 GMT</pubDate></item><item><title>Garden Grove ADU Fees 2026: Two Cliffs (500 &amp; 750) and Free Plans</title><link>https://everylineitem.com/posts/garden-grove-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/garden-grove-adu-cost/</guid><description>Garden Grove ADU fees: two cliffs (500 sq ft schools, 750 sq ft impact fees) and four free plans.</description><pubDate>Tue, 06 Oct 2026 16:58:00 GMT</pubDate></item><item><title>Santa Maria ADU Fees 2026: The Least Transparent Schedule</title><link>https://everylineitem.com/posts/santa-maria-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/santa-maria-adu-cost/</guid><description>Santa Maria ADU fees: the boom town with the least transparent fee schedule in the series.</description><pubDate>Tue, 06 Oct 2026 04:38:00 GMT</pubDate></item><item><title>Glendale ADU Fees 2026: The 50 Sq Ft Cliff</title><link>https://everylineitem.com/posts/glendale-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/glendale-adu-cost/</guid><description>Glendale ADU fees: the 50 sq ft cliff — the largest legal ADU always pays impact fees.</description><pubDate>Tue, 06 Oct 2026 03:03:04 GMT</pubDate></item><item><title>Long Beach ADU Fees 2026: The Third Way on Impact Fees</title><link>https://everylineitem.com/posts/long-beach-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/long-beach-adu-cost/</guid><description>Long Beach ADU fees: ADU-specific reduced rates — neither a cliff nor an exemption.</description><pubDate>Tue, 06 Oct 2026 02:12:00 GMT</pubDate></item><item><title>Sacramento ADU Fees 2026: Crossing 750 Costs $5,728</title><link>https://everylineitem.com/posts/sacramento-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/sacramento-adu-cost/</guid><description>Sacramento ADU fees: crossing 750 sq ft costs $5,728 in impact fees.</description><pubDate>Tue, 06 Oct 2026 01:00:00 GMT</pubDate></item><item><title>Oakland ADU Fees 2026: Zero Impact Fees</title><link>https://everylineitem.com/posts/oakland-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/oakland-adu-cost/</guid><description>Oakland ADU fees: zero impact fees on ADUs, plus the $4,136 school fee and 4–6% permit rule.</description><pubDate>Mon, 05 Oct 2026 17:00:00 GMT</pubDate></item><item><title>How to Read an ADU Bid: Four Buckets, One Honest Number</title><link>https://everylineitem.com/posts/how-to-read-adu-bid/</link><guid isPermaLink="true">https://everylineitem.com/posts/how-to-read-adu-bid/</guid><description>Three ADU bids, three different numbers, none of them comparable — until you sort every line into four buckets: Included, Allowance, Excluded, Owner-paid. The checklist that turns quotes into a decision.</description><pubDate>Mon, 05 Oct 2026 14:30:00 GMT</pubDate></item><item><title>JADU Cost in California 2026: The ADU With No Fees</title><link>https://everylineitem.com/posts/jadu-cost-california/</link><guid isPermaLink="true">https://everylineitem.com/posts/jadu-cost-california/</guid><description>A Junior ADU is California&apos;s only housing type with no impact fees, no school fees, no utility connection charges, and no parking requirement. How the six-phase ledger collapses when the unit lives inside a house that already exists.</description><pubDate>Mon, 05 Oct 2026 14:00:00 GMT</pubDate></item><item><title>San Francisco ADU Fees 2026: No 750 Sq Ft Cliff</title><link>https://everylineitem.com/posts/san-francisco-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/san-francisco-adu-cost/</guid><description>San Francisco ADU fees: why the 750 sq ft impact-fee cliff barely exists here.</description><pubDate>Mon, 05 Oct 2026 10:30:00 GMT</pubDate></item><item><title>San Jose ADU Fees 2026: Bay Area Fees, Line by Line</title><link>https://everylineitem.com/posts/san-jose-bay-area-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/san-jose-bay-area-adu-cost/</guid><description>San Jose ADU fees line by line, plus four other Bay Area jurisdictions.</description><pubDate>Sat, 03 Oct 2026 14:45:00 GMT</pubDate></item><item><title>San Diego ADU Fees 2026: Four Cities, Four Prices</title><link>https://everylineitem.com/posts/san-diego-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/san-diego-adu-cost/</guid><description>San Diego ADU fees across four cities — the same build costs $17,400 more by street.</description><pubDate>Sat, 03 Oct 2026 04:15:00 GMT</pubDate></item><item><title>Los Angeles County ADU Fees 2026: City vs Unincorporated Paths</title><link>https://everylineitem.com/posts/los-angeles-county-adu-cost/</link><guid isPermaLink="true">https://everylineitem.com/posts/los-angeles-county-adu-cost/</guid><description>LA County ADU fees: City of LA vs unincorporated paths, soft costs, and the 750 sq ft cliff.</description><pubDate>Fri, 18 Sep 2026 00:00:00 GMT</pubDate></item><item><title>ADU Rent Payback in California: Line-Item ROI on an 800 sq ft Build (2026)</title><link>https://everylineitem.com/posts/adu-rent-payback-roi-california/</link><guid isPermaLink="true">https://everylineitem.com/posts/adu-rent-payback-roi-california/</guid><description>Take the $320,000 construction model (and ~$381,000 all-in year-one) against realistic LA County ADU rents. Simple payback, cash-on-cash, and what breaks the model — with a hard not-financial-advice disclaimer.</description><pubDate>Sun, 06 Sep 2026 00:00:00 GMT</pubDate></item><item><title>Coastal vs Inland ADU Cost in Southern California: Same Plan, Different Bill (2026)</title><link>https://everylineitem.com/posts/coastal-vs-inland-adu-cost-california/</link><guid isPermaLink="true">https://everylineitem.com/posts/coastal-vs-inland-adu-cost-california/</guid><description>Same 800 sq ft ADU plan priced two ways: LA coastal band near $380,000 ($475/sq ft) vs Inland Empire near $300,000 ($375/sq ft). Six phases, same drawings — labor, fees, coastal review, and access drive the swing.</description><pubDate>Sun, 06 Sep 2026 00:00:00 GMT</pubDate></item><item><title>Modular vs Site-Built ADU Cost in California: 2026 Line-Item Comparison</title><link>https://everylineitem.com/posts/modular-vs-site-built-adu-cost-california/</link><guid isPermaLink="true">https://everylineitem.com/posts/modular-vs-site-built-adu-cost-california/</guid><description>Same 800 sq ft detached ADU, two delivery methods. Site-built baseline $320,000. Modular lands near $288,000 after crane and transport — here is where each phase saves or grows.</description><pubDate>Sun, 06 Sep 2026 00:00:00 GMT</pubDate></item></channel></rss>