Skip to content
Every Line Item

Los Angeles County · SB 1117 · 42 days until Jan 1, 2027

Lancaster ADU Impact Fees: Before and After SB 1117

From January 1, 2027, SB 1117 charges impact fees on a homeowner's first two ADUs only for the square footage above 750. Here is what that does to Lancaster's verified impact-fee lines — permit in 2026 vs permit in 2027.

Verified rows only; every line links to its official source. Last verified 13 Nov 2026. How we price →

Impact fees by ADU size

ADU sizePermit in 2026Permit in 2027Difference
750 sq ft$0$0exempt either way
800 sq ft$3,651$229−$3,422
1,000 sq ft$4,561$1,141−$3,420
1,200 sq ft$5,472$2,052−$3,420

Dwelling-base flat fees are prorated (ADU ÷ primary) and converted assuming a 1,600 sq ft primary dwelling — an assumption, not a verified figure. The calculator lets you enter your actual primary size for an exact figure.

Line by line at 1,000 sq ft

1,000 sq ft puts 250 sq ft above the 750 line — the 2027 column charges only that excess.

Impact fee20262027Source
Traffic signal impact fee - Residential Zones (per-dwelling base)$874$219official doc ↗verified 13 Nov 2026
Traffic impact fee - Single-family dwellings (per-dwelling base)$1,392$348official doc ↗verified 13 Nov 2026
Park development fee (per-dwelling base)$1,971$493official doc ↗verified 13 Nov 2026
Administrative offices fee - Residential (per-dwelling base)$47$12official doc ↗verified 13 Nov 2026
Corporate yard fee - Residential (per-dwelling base)$44$11official doc ↗verified 13 Nov 2026
Open space fee - Single-family dwellings (per-dwelling base)$233$58official doc ↗verified 13 Nov 2026

What SB 1117 does not change

School developer fees, building permit and plan-check fees, and water/sewer connection or capacity charges stay the same. SB 1117 covers a homeowner's first two ADUs. This is a fee comparison, not advice to wait: delay, construction-price movement and financing have costs of their own.

Common questions

How much does SB 1117 save on ADU fees in Lancaster?

For an 800 sq ft ADU, verified impact fees go from $3,651 to $229 — about $3,422 less. For a 1,000 sq ft ADU, verified impact fees go from $4,561 to $1,141 — about $3,420 less. Only impact fees change; school fees, permit fees and utility connection or capacity charges stay the same.

Should I wait until January 2027 to pull an ADU permit in Lancaster?

This page compares fees only. In Lancaster the verified impact-fee difference is up to $3,422 at the sizes shown. Waiting also has costs — schedule changes, construction-price movement, financing — and SB 1117 applies to a homeowner's first two ADUs. Weigh both before deciding.

Does SB 1117 change anything for ADUs of 750 sq ft or less?

No. ADUs of 750 sq ft or less already owe $0 in impact fees under Gov. Code §66311.5. SB 1117 changes what happens above 750 sq ft: impact fees apply only to the square footage over 750 instead of the whole unit.

Run your exact size → All Lancaster ADU fees → SB 1117 savings, every city →

Background: SB 1117 in plain English · Wait or permit now? · The 750 sq ft cliff

Keep reading

Estimate the added property tax →

Get an email when Lancaster's fees change →