CA ADU Costs

California ADU Fee Index

Where every ADU dollar actually goes.

Line-item cost breakdowns for real California builds. Six phases, every fee, every city — so you can check a contractor's number before you sign.

Browse fees by region: Bay Area · Central Coast · NorCal · SoCal · All cities →

163 jurisdictions · every figure links to its official source · Fees last verified: 16 Nov 2026 · no email needed. How we price →

RSS Feed

Every number on this page has a source document.

No fee estimated by us, no "typical ranges" from a sales brochure. Every fee rate here traces to an official source — a city fee schedule, a school district resolution, a utility tariff — and the whole dataset is re-verified on a published schedule. Where a city publishes a rate instead of a pre-computed ADU total, we apply that rate to our standard 800 sq ft ADU and show the assumption. Every Line Item is an independent publication: no builder, modular company, or lender has paid for, reviewed, or influenced any figure here.

163
Jurisdictions tracked

Cities and counties with verified ADU fee data, growing batch by batch.

659
Verified fee line items

Each fee rate is checked against the document that set it. Dollar totals are computed from those verified rates for our standard 800 sq ft ADU, with the assumption shown; charges we cannot verify are left out. Construction costs are modeled separately and labeled as such on the quote checker.

Dec 2026
Next full re-verification

Fees change every fiscal year. We re-check every line on a schedule we publish in advance.

0
Email gates

The calculator, the index, and the dataset are open. No signup stands between you and a number.

Who runs this site, how to reach us, and how we fix mistakes: About → Contact → Corrections policy →

Questions or a correction? Email corrections@everylineitem.com — we read every message and reply when a response is needed.

What changed

The fee change log — every verification event, newest first. Full log →

  • Published: 2026-11-21

    Westminster ADU: $306,802* floor — a $4,000 park-fee cap and a fee schedule nobody can read

    Westminster ADU cost post published (verified 21 Nov 2026): 800 sq ft detached ADU $306,802* floor ($384/sq ft) — a floor, not a total, because the building permit and school fee could not be verified. Confirmed: park DIF capped at $4,000 flat on the proportional calculation ($17,179 per dwelling, ADUs 750 sq ft or larger; under 750 exempt) and an ADU-specific sewer capacity fee of $801.60 ($1,002 per 1,000 sq ft, Midway City Sanitary District). The city's new fee schedule took effect September 1, 2025 but its contents are not verifiable online, so the permit line and the current school district rate are marked 'verify with city' and excluded. Six free pre-approved plans (Plan 1 nets 748 sq ft). Homepage Videos updated to the two latest published Shorts (setbacks, Santa Ana). Verified rows sitewide unchanged at 659.

  • Published: 2026-11-20

    What SB 1117 actually says, in plain English — the 750 sq ft cliff becomes a staircase on Jan 1, 2027

    What SB 1117 actually says, in plain English, published (verified 9 Oct 2026; full leginfo text still pending, full-text verification queued for the December 1 quarterly re-verification): Chapter 809, Statutes of 2026, signed September 29, 2026, effective January 1, 2027, amends Government Code section 66311.5 — impact fees on the first two ADUs on a lot may be imposed only on livable square footage above 750 sq ft, so an 800 sq ft ADU is assessed on 50 sq ft, not 800. Illustrative savings for an 800 sq ft ADU from current (2026) rate schedules: Encinitas ~$20,663 ($22,040 to $1,378 at the adopted $27.55/sq ft program rate), Ontario ~$17,623, Palo Alto up to ~$18,750; Salinas and Oakland $0 (no city DIF / no impact fees on ADUs). School fees, building permit and plan-check fees, utility connection charges, and permits pulled in 2026 are untouched. Homepage Videos already the two latest published Shorts (Santa Ana, permit-fee ranking). Verified rows sitewide unchanged at 659.

  • Published: 2026-11-19

    ADU setbacks and lot coverage guide published — the 4-foot cap, the 800 sq ft floor, and the two fee cliffs

    ADU setbacks and lot-coverage guide published (verified 19 Nov 2026): California caps ADU side and rear setbacks at 4 feet (Gov. Code §66321(b)(3)); conversions need no setback; lot coverage, FAR, and open space still apply — but the state floor requires cities to allow at least an 800 sq ft, 16-foot-tall ADU with 4-foot setbacks (§66314(d)(7)). Pre-publication correction in the same run: the draft said ADUs of 750 sq ft or less are exempt from both impact fees and school fees — the 750 sq ft line covers impact fees only; school fees follow a separate under-500-sq-ft line (§66311.5(c)(3), SB 543), so a 749 sq ft ADU still pays school fees on its full area at up to $5.38/sq ft. Homepage Videos updated to the two latest published Shorts (Santa Ana, permit-fee ranking). Verified rows sitewide unchanged at 659.

Get an email when your city's fees change

We re-verify every jurisdiction on a rolling basis. When your city's numbers move, you'll get the diff — no newsletter, no sales, unsubscribe anytime.

One square foot can cost you $3,379.

In Hayward, a 750 sq ft ADU pays $0 in park impact fees. At 751 sq ft, the city's worksheet rate of $3,379 kicks in — for one square foot. State law draws the line at 750; every city decides what sits on either side of it. This is the rule through December 31, 2026. From January 1, 2027, SB 1117 limits impact fees to the square footage above 750 for a homeowner's first two ADUs — how Hayward converts its flat $3,379 to that basis is not yet published.

Find your city's cliff →

Contractors quote in lumps. We break it into six.

1

Soft costs

Design, permits, plan check — the only phase with a public, checkable answer.

2

Site work + foundation

Grading, trenching, the slab everything sits on.

3

Framing + structure

Walls, roof, the skeleton.

4

Building envelope

Windows, doors, roofing, waterproofing.

5

Systems + interior

Electrical, plumbing, HVAC, drywall, finishes.

6

Landscaping & hardscape

What the site looks like when the crew leaves.

Bids hide the most in phase 1. Learn to read a bid → Map yours →

The California ADU Fee Index — Q3 2026

The first public index of what governments charge your ADU.

163 jurisdictions, 659 verified line items. The same 800 sq ft ADU owes $1,640 in school fees in one city and $9,968 in another — and impact fees can swing five figures across a single square foot at the 750 line — in Ontario, $27,494.

Read the Fee Index →Download the data (CSV, free) →Browse all tools →

Ranked: the same ADU, city by city

One unit, every city — ranked by a single line item, so the spread is the city's, not the model's.

How much does an ADU cost in California?

Across the 44 city breakdowns published on this site, an 800 sq ft detached backyard home runs $299,000–$328,000 all-in, with a median of $312,500. The build itself is modeled — $288,000 across the six phases plus $14,000 in design — while the government charges are verified line items for that city: school district assessments, impact levies, permit and utility charges, each traced to the official document that set it. Every total is a floor: charges we cannot verify are left out, never estimated by us.

Use the range to sanity-check a bid before you sign: if a quote lands far outside it, ask which phase or which charge explains the gap — then check that charge against the official schedule. Price your city → Check a contractor's quote →

What the numbers say

The spread above is not a range in our model; it is what the districts actually adopted. The 2026 Level I cap is $5.38 per square foot, and 50 of the 137 school districts we have verified charge exactly that. Below the cap, districts set their own rates — Laguna Beach charges $2.05 per square foot, the lowest combined rate in the index. Above it, only a Level II fee can go further: Calexico charges $12.46.

One square foot can switch impact fees on. State law exempts ADUs of 750 sq ft or less from impact fees; above that line, fees are prorated against the primary dwelling. From 1 January 2027, SB 1117 narrows the cliff further: for the first two ADUs on a parcel, only the area above 750 sq ft is taxed. See what SB 1117 saves in your city →

Every fee figure links to the official document it came from — a city fee schedule, a school district resolution, a utility's charges — with the date we last checked it. Figures we cannot verify from an official source are marked "verify with city" and left out of every total, never estimated by us. 659 verified line items across 163 jurisdictions, last checked 16 Nov 2026. How we verify →

Questions, answered from the data

How much does an ADU cost in California?

Across the 44 city breakdowns published here, an 800 sq ft detached backyard home runs $299,000–$328,000 all-in, median $312,500. Construction is modeled; the government charges are verified line items. Price your city →

What does the city charge for an ADU?

Three kinds of government charges: school district assessments, impact levies for parks and traffic, and permit plus water and sewer connection charges. Every figure on this site traces to the official schedule or resolution that set it. Browse the Fee Index →

Do I pay school fees on a small ADU?

Not under 500 sq ft — state law deems the fee $0 below that size. Between 500 and 750 sq ft you owe the school assessment but no impact fees. Above 750 sq ft, both apply. Why school fees vary →

What changes on January 1, 2027?

SB 1117 taxes only the area above 750 sq ft for a homeowner's first two ADUs on a parcel. At 1,000 sq ft the largest verified saving is $27,457 in Ontario. School fees and connection charges are untouched. See your city's saving →

What will an ADU add to my property tax?

Only the new construction is reassessed — the existing home's assessed value does not change. The added value depends on your county's rate and your build's value, not its cost. Estimate your tax →

Why do ADU fees vary so much between cities?

The same 800 sq ft ADU owes $1,006 for a building permit in Riverside and $12,800–$19,200 in Oakland — a 19× spread on the identical unit — because most cities price permits from an assumed construction valuation, not a flat schedule. School fees vary the same way: $1,792 in Pasadena against $4,304 in Campbell, set by school district boundaries rather than city limits. See the permit ranking →

What if my city's fee isn't listed?

We leave it blank and mark it "verify with city" rather than estimate — a fee we cannot verify from an official source is not a number we publish. The index covers 163 jurisdictions and grows batch by batch as new fee schedules are checked. A missing schedule or a correction can be sent to corrections@everylineitem.com. Browse the Fee Index →

How often is the data updated?

Every fee line is re-checked against its official source on a published quarterly schedule, and the next full re-verification is December 2026. Changes are logged in the public change log, newest first, with the date each figure was last checked. See what changed →

Find your breakdown

All 108 posts →

Latest

Videos

2026 ADU benchmark sheet

Quarterly cost ranges for every build on this site, in one CSV. Free download, no email needed. Use it to sanity-check a bid: compare your quote's phase totals to the inland/coastal ranges. Medians are published figures; the low/high ends are modeled — see Methodology for what's inside.

Download the benchmark CSV →

Verify a contractor quote →