Where every ADU dollar actually goes.
Line-item cost breakdowns for real California builds. Six phases, every fee, every city — so you can check a contractor's number before you sign.
Browse fees by region: Bay Area · Central Coast · NorCal · SoCal · All cities →
163 jurisdictions · every figure links to its official source · last verified 11 Nov 2026 · no email needed. How we price →
Every number on this page has a source document.
No estimated fees, no "typical ranges" from a sales brochure. Every fee here traces to an official source — a city fee schedule, a school district resolution, a utility tariff — and the whole dataset is re-verified on a published schedule. Every Line Item is an independent publication: no builder, modular company, or lender has paid for, reviewed, or influenced any figure here.
Cities and counties with verified ADU fee data, growing batch by batch.
Each fee checked against the document it came from — no fee modeled, no fee guessed. Construction costs are modeled separately and labeled as such on the quote checker.
Fees change every fiscal year. We re-check every line on a schedule we publish in advance.
The calculator, the index, and the dataset are open. No signup stands between you and a number.
Who runs this site, how to reach us, and how we fix mistakes: About → Contact → Corrections policy →
Questions or a correction? Email corrections@everylineitem.com — we read every message and reply when a response is needed.
What changed
The fee change log — every verification event, newest first. Full log →
2026-11-12
Oxnard ADU cost post published — $308,000 floor; hub meta descriptions shortened
Oxnard ADU cost post published — an 800 sq ft detached ADU at $308,000 floor ($385/sq ft), Ventura County's coastal control case: standard 750 sq ft cliff in Municipal Code Sec. 15-183, valuation-based building permit schedule (FY 2026-27 Master Fee Schedule, Exhibit A, IX C1) that cannot be priced per square foot so the permit figure is excluded, school fee $4,136 on 800 sq ft ($5.17/sq ft split across Oxnard SD $3.41 K-8 and Oxnard Union HSD ~$1.76), proportional impact fees above 750 sq ft with unpublished base amounts excluded, pre-approved plans accepted from Ventura and San Diego County programs. Last verified 9 Oct 2026. Also: hub meta descriptions shortened to 160 characters or less (fee-index, compare, changes, fees hub, bid-scanner title, SB 1117 hub). No new fee rows in this run.
2026-11-11
Los Angeles: Building permit fees verified — Table 1-A, combined 165%, plan check 90% + surcharges
City of Los Angeles building permit fees verified — the first permit-fee rows for LA-CITY (3 verified rows → 13). Table 1-A (LAMC §91.113, Ord. 185,587): $100,001-$500,000 band $395.00 + $3.50 per $1,000 of TOTAL valuation, with the full 7-band table in the row notes; combined building-mechanical permit 165% of the Table 1-A fee (Table 1-A.1; ADUs use the combined permit per §91.107.2.2); plan check 90% of the permit fee (§91.107.3.1.1); energy-code increase 10% (Table 1-A footnote 2); Systems Development Surcharge 6% (§98.0418(a)); General Plan Maintenance Surcharge 7% (§98.0418(b)); Development Services Center Surcharge 3% (§98.0410, Ord. 184548 — temporary BuildLA rate, reverts to 2% when the $21.76M cost is recovered); Fire Hydrant Fee 0.22% of valuation at $50,000+ (§91.107.4.4); SMIP 0.013% residential, $0.50 minimum (PRC §2705(a); CA Geological Survey fee schedule); Building Standards fee $1 per $25,000, minimum $1 (HSC §18931.6(a); CBSC Bulletin 20-04). All read live November 11, 2026. Rates render on the fee page with amount “—”: LADBS determines project valuation and no confirmed $/sq ft ADU valuation basis exists, so no 800 sq ft total. Resolved in this batch: the General Plan surcharge is 7%, not 10% (the 10% figure is LAMC §19.16 Chapter I planning fees, not the §98.0418(b) building-permit surcharge); the LADBS full-cost fee proposal (CF 26-0163) is not yet adopted, so the codified Table 1-A amounts are current; the minimum permit fee is $180 (double the §98.0412(a) $90 minimum inspection fee), not $130 as secondary sources claim. leginfo was unreachable (bot check) for the two state statutes — rates corroborated by the CGS fee schedule, the CBSC bulletin, and CA Attorney General Opinion No. 09-903. LA-CITY now has 13 rows, all verified; verified rows sitewide 528 → 538.
2026-11-11
Clovis: Neighborhood Park Deposit verified — $6,127 per unit for Street Area 4 (Loma Vista)
City of Clovis Neighborhood Park Deposit ($6,127 per unit, Street Area 4 — Loma Vista Specific Plan) verified in the Master Development Fee Schedule 2024-2025 (effective July 21, 2025, p.2; rates effective August 12, 2024), re-read live November 11, 2026 — no newer schedule published. The city ADU Informational Handout (8-16-23) states ADUs under 750 sq ft pay no impact fee and ADUs over 750 sq ft are charged proportionately to the primary dwelling, and Gov. Code §66311.5 governs the same rule, so the row is verified with dwelling-base proration (800 sq ft ADU at the 1,600 sq ft default primary: $3,063.50; $0 at 750 sq ft and under; SB 1117 2027 basis: $191.47). Area scope resolved from the city’s Street & Undergrounding Boundaries map (May 28, 2024; fee schedule p.7, in the June 10, 2024 City Council agenda packet, Item 15): Street Area 4 runs Locan Ave to McCall Ave, Bullard/Shaw Aves to the Gould Canal — the Loma Vista Specific Plan boundary — so the deposit and the Area 4 Major Street Fee apply to the same parcels and the row is tagged area “Area 4” (mutually exclusive with Areas 1–5). Clovis now has 22 rows (6 verified in this branch; the Major Street Area 1–5 verifications are a separate unmerged branch).
Get an email when your city's fees change
We re-verify every jurisdiction on a rolling basis. When your city's numbers move, you'll get the diff — no newsletter, no sales, unsubscribe anytime.
One square foot can cost you $3,379.
In Hayward, a 750 sq ft ADU pays $0 in park impact fees. At 751 sq ft, the city's worksheet rate of $3,379 kicks in — for one square foot. State law draws the line at 750; every city decides what sits on either side of it. This is the rule through December 31, 2026. From January 1, 2027, SB 1117 limits impact fees to the square footage above 750 for a homeowner's first two ADUs — how Hayward converts its flat $3,379 to that basis is not yet published.
Contractors quote in lumps. We break it into six.
1
Soft costs
Design, permits, plan check — the only phase with a public, checkable answer.
2
Site work + foundation
Grading, trenching, the slab everything sits on.
3
Framing + structure
Walls, roof, the skeleton.
4
Building envelope
Windows, doors, roofing, waterproofing.
5
Systems + interior
Electrical, plumbing, HVAC, drywall, finishes.
6
Landscaping & hardscape
What the site looks like when the crew leaves.
Bids hide the most in phase 1. Learn to read a bid → Map yours →
The California ADU Fee Index — Q3 2026
The first public index of what governments charge your ADU.
163 jurisdictions, 538 verified line items. The same 800 sq ft ADU owes $1,640 in school fees in one city and $9,968 in another — and impact fees can swing five figures across a single square foot at the 750 line — in Ontario, $27,494.
Find your breakdown
All 91 posts →Latest
- Nov 11, 2026Oxnard ADU Fees 2026: Ventura County's Coastal Fee ProfileAn 800 sq ft detached ADU in Oxnard priced phase by phase — $308,000 floor. Ventura County's coastal HCD #19 city keeps the standard 750 sq ft cliff in ordinance Sec. 15-183, runs permits on a valuation schedule it won't price out per square foot, and splits its $4,136 school fee across two districts.$308,000*
- Nov 10, 2026San Diego County ADU Fees Compared: $308K to $344K in 30 MilesThe same 800 sq ft ADU, three San Diego County fee philosophies: Chula Vista $308,000 (flat $3,951 permit, 12 pre-approved plans), Oceanside $313,000 (ordinance DIF $0 — but a city draft study disagrees), and the City of San Diego $344,000 (a ~$16,500 permit bill). A $36,000 spread inside one county — and the December-vs-January SB 1117 question.
- Nov 9, 2026How to Read Your City's Fee Schedule (Without Calling the Permit Counter)Every number on this site comes from a city fee schedule — a PDF most homeowners never open. A practical walkthrough of where fee schedules live, how valuation tables and flat fees work, which line items actually apply to ADUs, and why the declared valuation is the number that matters most.
- Nov 8, 2026Downey ADU Fees 2026: $0 Impact Fees Under 750 Sq Ft — $4,972 Permits Above ItAn 800 sq ft detached ADU in Downey priced phase by phase — $311,000. The series study in split personality: Ordinance 23-1507 waives impact fees under 750 sq ft, but valuation-based permits reach ~$4,972 on an assumed $150,000 valuation. The pre-approved plan program exists in name only — zero plans registered as of July 2026.$311,000*