Skip to content
Every Line Item

CA ADU Costs

California ADU Fee Index

Where every ADU dollar actually goes.

Line-item cost breakdowns for real California builds. Six phases, every fee, every city — so you can check a contractor's number before you sign.

Browse fees by region: Bay Area · Central Coast · NorCal · SoCal · All cities →

163 jurisdictions · every figure links to its official source · last verified 11 Nov 2026 · no email needed. How we price →

RSS Feed

Every number on this page has a source document.

No estimated fees, no "typical ranges" from a sales brochure. Every fee here traces to an official source — a city fee schedule, a school district resolution, a utility tariff — and the whole dataset is re-verified on a published schedule. Every Line Item is an independent publication: no builder, modular company, or lender has paid for, reviewed, or influenced any figure here.

163
Jurisdictions tracked

Cities and counties with verified ADU fee data, growing batch by batch.

538
Verified fee line items

Each fee checked against the document it came from — no fee modeled, no fee guessed. Construction costs are modeled separately and labeled as such on the quote checker.

Dec 2026
Next full re-verification

Fees change every fiscal year. We re-check every line on a schedule we publish in advance.

0
Email gates

The calculator, the index, and the dataset are open. No signup stands between you and a number.

Who runs this site, how to reach us, and how we fix mistakes: About → Contact → Corrections policy →

Questions or a correction? Email corrections@everylineitem.com — we read every message and reply when a response is needed.

What changed

The fee change log — every verification event, newest first. Full log →

  • 2026-11-12

    Oxnard ADU cost post published — $308,000 floor; hub meta descriptions shortened

    Oxnard ADU cost post published — an 800 sq ft detached ADU at $308,000 floor ($385/sq ft), Ventura County's coastal control case: standard 750 sq ft cliff in Municipal Code Sec. 15-183, valuation-based building permit schedule (FY 2026-27 Master Fee Schedule, Exhibit A, IX C1) that cannot be priced per square foot so the permit figure is excluded, school fee $4,136 on 800 sq ft ($5.17/sq ft split across Oxnard SD $3.41 K-8 and Oxnard Union HSD ~$1.76), proportional impact fees above 750 sq ft with unpublished base amounts excluded, pre-approved plans accepted from Ventura and San Diego County programs. Last verified 9 Oct 2026. Also: hub meta descriptions shortened to 160 characters or less (fee-index, compare, changes, fees hub, bid-scanner title, SB 1117 hub). No new fee rows in this run.

  • 2026-11-11

    Los Angeles: Building permit fees verified — Table 1-A, combined 165%, plan check 90% + surcharges

    City of Los Angeles building permit fees verified — the first permit-fee rows for LA-CITY (3 verified rows → 13). Table 1-A (LAMC §91.113, Ord. 185,587): $100,001-$500,000 band $395.00 + $3.50 per $1,000 of TOTAL valuation, with the full 7-band table in the row notes; combined building-mechanical permit 165% of the Table 1-A fee (Table 1-A.1; ADUs use the combined permit per §91.107.2.2); plan check 90% of the permit fee (§91.107.3.1.1); energy-code increase 10% (Table 1-A footnote 2); Systems Development Surcharge 6% (§98.0418(a)); General Plan Maintenance Surcharge 7% (§98.0418(b)); Development Services Center Surcharge 3% (§98.0410, Ord. 184548 — temporary BuildLA rate, reverts to 2% when the $21.76M cost is recovered); Fire Hydrant Fee 0.22% of valuation at $50,000+ (§91.107.4.4); SMIP 0.013% residential, $0.50 minimum (PRC §2705(a); CA Geological Survey fee schedule); Building Standards fee $1 per $25,000, minimum $1 (HSC §18931.6(a); CBSC Bulletin 20-04). All read live November 11, 2026. Rates render on the fee page with amount “—”: LADBS determines project valuation and no confirmed $/sq ft ADU valuation basis exists, so no 800 sq ft total. Resolved in this batch: the General Plan surcharge is 7%, not 10% (the 10% figure is LAMC §19.16 Chapter I planning fees, not the §98.0418(b) building-permit surcharge); the LADBS full-cost fee proposal (CF 26-0163) is not yet adopted, so the codified Table 1-A amounts are current; the minimum permit fee is $180 (double the §98.0412(a) $90 minimum inspection fee), not $130 as secondary sources claim. leginfo was unreachable (bot check) for the two state statutes — rates corroborated by the CGS fee schedule, the CBSC bulletin, and CA Attorney General Opinion No. 09-903. LA-CITY now has 13 rows, all verified; verified rows sitewide 528 → 538.

  • 2026-11-11

    Clovis: Neighborhood Park Deposit verified — $6,127 per unit for Street Area 4 (Loma Vista)

    City of Clovis Neighborhood Park Deposit ($6,127 per unit, Street Area 4 — Loma Vista Specific Plan) verified in the Master Development Fee Schedule 2024-2025 (effective July 21, 2025, p.2; rates effective August 12, 2024), re-read live November 11, 2026 — no newer schedule published. The city ADU Informational Handout (8-16-23) states ADUs under 750 sq ft pay no impact fee and ADUs over 750 sq ft are charged proportionately to the primary dwelling, and Gov. Code §66311.5 governs the same rule, so the row is verified with dwelling-base proration (800 sq ft ADU at the 1,600 sq ft default primary: $3,063.50; $0 at 750 sq ft and under; SB 1117 2027 basis: $191.47). Area scope resolved from the city’s Street & Undergrounding Boundaries map (May 28, 2024; fee schedule p.7, in the June 10, 2024 City Council agenda packet, Item 15): Street Area 4 runs Locan Ave to McCall Ave, Bullard/Shaw Aves to the Gould Canal — the Loma Vista Specific Plan boundary — so the deposit and the Area 4 Major Street Fee apply to the same parcels and the row is tagged area “Area 4” (mutually exclusive with Areas 1–5). Clovis now has 22 rows (6 verified in this branch; the Major Street Area 1–5 verifications are a separate unmerged branch).

Get an email when your city's fees change

We re-verify every jurisdiction on a rolling basis. When your city's numbers move, you'll get the diff — no newsletter, no sales, unsubscribe anytime.

One square foot can cost you $3,379.

In Hayward, a 750 sq ft ADU pays $0 in park impact fees. At 751 sq ft, the city's worksheet rate of $3,379 kicks in — for one square foot. State law draws the line at 750; every city decides what sits on either side of it. This is the rule through December 31, 2026. From January 1, 2027, SB 1117 limits impact fees to the square footage above 750 for a homeowner's first two ADUs — how Hayward converts its flat $3,379 to that basis is not yet published.

Find your city's cliff →

Contractors quote in lumps. We break it into six.

1

Soft costs

Design, permits, plan check — the only phase with a public, checkable answer.

2

Site work + foundation

Grading, trenching, the slab everything sits on.

3

Framing + structure

Walls, roof, the skeleton.

4

Building envelope

Windows, doors, roofing, waterproofing.

5

Systems + interior

Electrical, plumbing, HVAC, drywall, finishes.

6

Landscaping & hardscape

What the site looks like when the crew leaves.

Bids hide the most in phase 1. Learn to read a bid → Map yours →

The California ADU Fee Index — Q3 2026

The first public index of what governments charge your ADU.

163 jurisdictions, 538 verified line items. The same 800 sq ft ADU owes $1,640 in school fees in one city and $9,968 in another — and impact fees can swing five figures across a single square foot at the 750 line — in Ontario, $27,494.

Read the Fee Index →Download the data (CSV, free) →

Find your breakdown

All 91 posts →

Latest

Videos

2026 ADU benchmark sheet

Quarterly cost ranges for every build on this site, in one CSV. Free download, no email needed. Use it to sanity-check a bid: compare your quote's phase totals to the inland/coastal ranges. Medians are published figures; the low/high ends are modeled — see Methodology for what's inside.

Download the benchmark CSV →

Verify a contractor quote →