Monrovia ADU Impact Fees: Before and After SB 1117

From January 1, 2027, SB 1117 charges impact fees on a homeowner's first two ADUs only for the square footage above 750. Here is what that does to Monrovia's verified impact-fee lines — permit in 2026 vs permit in 2027.

Verified rows only; every line links to its official source. Last verified 19 Oct 2026. How we price →

Impact fees by ADU size

ADU sizePermit in 2026Permit in 2027Difference
750 sq ft$0$0exempt either way
800 sq ft$0$0$0
1,000 sq ft$0$0$0
1,200 sq ft$0$0$0

Dwelling-base flat fees are prorated (ADU ÷ primary) and converted assuming a 1,600 sq ft primary dwelling — an assumption, not a verified figure. The calculator lets you enter your actual primary size for an exact figure.

Line by line at 1,000 sq ft

1,000 sq ft puts 250 sq ft above the 750 line — the 2027 column charges only that excess.

Impact fee20262027Source
Transportation Impact Fee (Chapter 3.22)$0not publishedofficial doc ↗verified 19 Oct 2026

What SB 1117 does not change

School developer fees, building permit and plan-check fees, and water/sewer connection or capacity charges stay the same. SB 1117 covers a homeowner's first two ADUs. This is a fee comparison, not advice to wait: delay, construction-price movement and financing have costs of their own.

Common questions

How much does SB 1117 save on ADU fees in Monrovia?

At 800 sq ft, Monrovia's verified impact fees do not change under SB 1117. At 1,000 sq ft, Monrovia's verified impact fees do not change under SB 1117. Only impact fees change; school fees, permit fees and utility connection or capacity charges stay the same.

Should I wait until January 2027 to pull an ADU permit in Monrovia?

This page compares fees only. In Monrovia we found no verified impact-fee difference at the sizes shown. Waiting also has costs — schedule changes, construction-price movement, financing — and SB 1117 applies to a homeowner's first two ADUs. Weigh both before deciding.

Does SB 1117 change anything for ADUs of 750 sq ft or less?

No. ADUs of 750 sq ft or less already owe $0 in impact fees under Gov. Code §66311.5. SB 1117 changes what happens above 750 sq ft: impact fees apply only to the square footage over 750 instead of the whole unit.

Run your exact size → All Monrovia ADU fees → SB 1117 savings, every city →

Background: SB 1117 in plain English · Wait or permit now? · The 750 sq ft cliff