Santa Clara County · SB 1117 · 42 days until Jan 1, 2027
Santa Clara County (unincorporated) ADU Impact Fees: Before and After SB 1117
From January 1, 2027, SB 1117 charges impact fees on a homeowner's first two ADUs only for the square footage above 750. Here is what that does to Santa Clara County (unincorporated)'s verified impact-fee lines — permit in 2026 vs permit in 2027.
Verified rows only; every line links to its official source. Last verified 11 Nov 2026. How we price →
Impact fees by ADU size
Santa Clara County (unincorporated) has separate area schedules (Alum Rock Union ESD / East Side Union HSD, Cambrian SD / Campbell Union HSD, Campbell Union ESD / Campbell Union HSD, Cupertino Union ESD / Fremont Union HSD, Gilroy USD, Loma Prieta Joint Union ESD / Los Gatos-Saratoga HSD, Los Altos ESD / Mountain View-Los Altos HSD, Los Gatos Union ESD / Los Gatos-Saratoga HSD, Luther Burbank ESD / Campbell Union HSD, Mountain View Whisman / Mountain View-Los Altos HSD, San José USD, Union ESD / Campbell Union HSD). A parcel pays one area's fees, so figures are ranges across areas, never a sum.
| ADU size | Permit in 2026 | Permit in 2027 | Difference |
|---|---|---|---|
| 750 sq ft | $0 | $0 | exempt either way |
| 800 sq ft | $0 | $0 | $0 |
| 1,000 sq ft | $0 | $0 | $0 |
| 1,200 sq ft | $0 | $0 | $0 |
Dwelling-base flat fees are prorated (ADU ÷ primary) and converted assuming a 1,600 sq ft primary dwelling — an assumption, not a verified figure. The calculator lets you enter your actual primary size for an exact figure.
Line by line at 1,000 sq ft
1,000 sq ft puts 250 sq ft above the 750 line — the 2027 column charges only that excess. Shown for the Alum Rock Union ESD / East Side Union HSD schedule.
| Impact fee | 2026 | 2027 | Source |
|---|---|---|---|
| General county DIF (none levied) | $0 | not published | official doc ↗verified 10 Nov 2026 |
What SB 1117 does not change
School developer fees, building permit and plan-check fees, and water/sewer connection or capacity charges stay the same. SB 1117 covers a homeowner's first two ADUs. This is a fee comparison, not advice to wait: delay, construction-price movement and financing have costs of their own.
Common questions
How much does SB 1117 save on ADU fees in Santa Clara County (unincorporated)?
At 800 sq ft, Santa Clara County (unincorporated)'s verified impact fees do not change under SB 1117. At 1,000 sq ft, Santa Clara County (unincorporated)'s verified impact fees do not change under SB 1117. Only impact fees change; school fees, permit fees and utility connection or capacity charges stay the same.
Should I wait until January 2027 to pull an ADU permit in Santa Clara County (unincorporated)?
This page compares fees only. In Santa Clara County (unincorporated) we found no verified impact-fee difference at the sizes shown. Waiting also has costs — schedule changes, construction-price movement, financing — and SB 1117 applies to a homeowner's first two ADUs. Weigh both before deciding.
Does SB 1117 change anything for ADUs of 750 sq ft or less?
No. ADUs of 750 sq ft or less already owe $0 in impact fees under Gov. Code §66311.5. SB 1117 changes what happens above 750 sq ft: impact fees apply only to the square footage over 750 instead of the whole unit.
Background: SB 1117 in plain English · Wait or permit now? · The 750 sq ft cliff
Keep reading
Estimate the added property tax →
Get an email when Santa Clara County (unincorporated)'s fees change →