The only public record of when California ADU fees actually move. Every entry below is a verification event — new line items read in the source document, or a rate our researchers re-confirmed. "Re-verified, unchanged" counts too: silence from other sites isn't evidence.
Published: 21 Nov 2026
Westminster ADU: $306,802* floor — a $4,000 park-fee cap and a fee schedule nobody can read
Westminster ADU cost post published (verified 21 Nov 2026): 800 sq ft detached ADU $306,802* floor ($384/sq ft) — a floor, not a total, because the building permit and school fee could not be verified. Confirmed: park DIF capped at $4,000 flat on the proportional calculation ($17,179 per dwelling, ADUs 750 sq ft or larger; under 750 exempt) and an ADU-specific sewer capacity fee of $801.60 ($1,002 per 1,000 sq ft, Midway City Sanitary District). The city's new fee schedule took effect September 1, 2025 but its contents are not verifiable online, so the permit line and the current school district rate are marked 'verify with city' and excluded. Six free pre-approved plans (Plan 1 nets 748 sq ft). Homepage Videos updated to the two latest published Shorts (setbacks, Santa Ana). Verified rows sitewide unchanged at 659.
Westminster
Published: 20 Nov 2026
What SB 1117 actually says, in plain English — the 750 sq ft cliff becomes a staircase on Jan 1, 2027
What SB 1117 actually says, in plain English, published (verified 9 Oct 2026; full leginfo text still pending, full-text verification queued for the December 1 quarterly re-verification): Chapter 809, Statutes of 2026, signed September 29, 2026, effective January 1, 2027, amends Government Code section 66311.5 — impact fees on the first two ADUs on a lot may be imposed only on livable square footage above 750 sq ft, so an 800 sq ft ADU is assessed on 50 sq ft, not 800. Illustrative savings for an 800 sq ft ADU from current (2026) rate schedules: Encinitas ~$20,663 ($22,040 to $1,378 at the adopted $27.55/sq ft program rate), Ontario ~$17,623, Palo Alto up to ~$18,750; Salinas and Oakland $0 (no city DIF / no impact fees on ADUs). School fees, building permit and plan-check fees, utility connection charges, and permits pulled in 2026 are untouched. Homepage Videos already the two latest published Shorts (Santa Ana, permit-fee ranking). Verified rows sitewide unchanged at 659.
Published: 19 Nov 2026
ADU setbacks and lot coverage guide published — the 4-foot cap, the 800 sq ft floor, and the two fee cliffs
ADU setbacks and lot-coverage guide published (verified 19 Nov 2026): California caps ADU side and rear setbacks at 4 feet (Gov. Code §66321(b)(3)); conversions need no setback; lot coverage, FAR, and open space still apply — but the state floor requires cities to allow at least an 800 sq ft, 16-foot-tall ADU with 4-foot setbacks (§66314(d)(7)). Pre-publication correction in the same run: the draft said ADUs of 750 sq ft or less are exempt from both impact fees and school fees — the 750 sq ft line covers impact fees only; school fees follow a separate under-500-sq-ft line (§66311.5(c)(3), SB 543), so a 749 sq ft ADU still pays school fees on its full area at up to $5.38/sq ft. Homepage Videos updated to the two latest published Shorts (Santa Ana, permit-fee ranking). Verified rows sitewide unchanged at 659.
Published: 18 Nov 2026
Santa Ana ADU cost post published — $308,000 floor for an 800 sq ft detached ADU
Santa Ana ADU cost post published (verified 9 Oct 2026): the series study in fee opacity — the city's official FAQ answers 'how much does a permit cost' with the Permit Counter phone number, (714) 647-5800; no valuation table is published. Counted: ADU planning review $1,865 (standard tier; $571 over-the-counter, $504 pre-approved plan) and school fee $4,304 (SAUSD $5.38/sq ft, series-maximum tier). Excluded pending confirmation: the building permit, the per-square-foot DIF structure (transportation $1.80/sq ft; parks $1.81–$5.53/sq ft by zone, labeled for 5+ unit projects), and sewer/water capacity charges (city $53 per fixture unit; OC San $1,710 per 1,000 sq ft ADU rate). Total $308,000 floor ($385/sq ft). Homepage Videos updated to the two latest published Shorts (permit-fee ranking, SB 1117 countdown). Verified rows sitewide unchanged at 659.
Santa Ana
Published: 17 Nov 2026
ADU permit fees ranked: $1,006 to $19,200 for the same 800 sq ft — plus Encinitas and Los Altos school-fee corrections
ADU permit-fee ranking published (verified 13 Nov 2026): sixteen cities ranked for an 800 sq ft detached ADU, Riverside $1,006 to Oakland $12,800–$19,200 — a 19x spread; nine of sixteen figures carry an asterisk (partial, estimated, or modeled). Lancaster has no permit figure: the city does not publish its building permit rate table, so the ranking leaves it out. Santa Ana had no city breakdown published yet, so it is not in the ranking. Corrections in the same run: Encinitas school fee $3,832 → $4,304 (EUSD $2.55 + SDUHSD $2.83 = $5.38 cap; total stays ~$322,000); Los Altos MVLA high-school share FI-223 $1.72 → $1.79/sq ft (Resolution No. 26/27-6, effective 2026-11-13; draft post total $303,712 → $303,768). Fee Index link added to every /fees/ jurisdiction page. Homepage Videos updated to the two latest published Shorts (SB 1117 countdown, solar Title 24). Verified rows sitewide unchanged at 659 (rate corrections, no new rows).
Encinitas · Los Altos
Published: 16 Nov 2026
ADU solar (Title 24) explainer published — when new detached ADUs need PV, the 1.8 kW floor and the battery-ready rule
ADU solar explainer published (verified 9 Oct 2026): Title 24 photovoltaics are required only for new-construction detached ADUs; the 1.8 kW sizing floor, the 80 sq ft solar-access exit, panels may go anywhere on the property or through community solar, and the §150.0(s) battery-ready rule applies to new detached ADUs over 125 amps. 2026 published pricing $2.30–$4.00/W implies roughly $4,100–$14,000 for a 1.8–3.5 kW ADU system before incentives; the federal 30% tax credit is gone as of late 2025. Pre-publication corrections to three scheduled ranking posts after the Lancaster fee confirmation (13 Nov 2026): Lancaster paper cost ~$3,000 → ~$7,907 floor (school $4,256 both districts + DIF $3,651 prorated) in the soft-costs ranking (now 8th; Santa Maria cheapest at ~$4,000 floor); Lancaster school fee $3,184 → $4,256 (16th) in the school-fee ranking; permit-fee ranking notes Lancaster's permit table is unpublished.
Lancaster
Published: 15 Nov 2026
Lancaster ADU cost post published — $310,000 floor for an 800 sq ft detached ADU
Lancaster ADU cost post published (verified 13 Nov 2026): school fees confirmed for both districts — Lancaster SD $3.98 + AVUHSD $1.34 = $5.32/sq ft ($4,256 at 800 sq ft) — and the current DIF schedule (eff. 10/1/2025) $7,297 per dwelling unit, prorated to $3,651 at 800 sq ft against the 1,600 sq ft default primary. Total $305,000 → $310,000. Building permit fee remains unpublished; sewer/water capacity charges unverified and excluded.
Lancaster
Published: 15 Nov 2026
Covina: city development impact fees verified — $25,358 per-dwelling base (prorated for ADUs 750+ sq ft); city reaches 2 verified rows
Covina: city development impact fees verified — FY26-27 DIF Schedule (eff. 7/1/2026; Res. CC 2024-057) per-dwelling base $25,358 for the >1,200-1,900 sq ft primary tier (park land $4,517 + park improvements $3,011 + community/rec centers $1,161 + library $1,585 + general government $1,420 + police $422 + fire $384 + streets $11,392 + traffic signals $1,315 + 0.6% admin $151; components re-summed and match the printed total exactly). ADUs of 750+ sq ft pay (ADU sq ft / primary sq ft) x base per Res. CC 2024-057 Sec. 8; ADUs under 750 sq ft pay $0. 800 sq ft ADU at the 1,600 sq ft default primary = $12,679. Covina verified rows 1 → 2, so the /fees/covina/ page reaches the 2-verified-rows threshold and its noindex lifts. Verified rows sitewide 658 → 659.
Covina
Published: 15 Nov 2026
Coachella: CVWD sanitation capacity charge verified — $0 for a standard ADU sharing existing connections; city reaches 2 verified rows
Coachella: sanitation capacity charge verified at $0 for a standard ADU (COACHELLA-NEW-01). CVWD Regulations Governing Sanitation Service (Ord. 1427.7 Sec. 5-1, 2025) charge no sanitation capacity charge when an ADU uses the home's existing street sewer lateral and/or water meter connections; a separate connection triggers a proportionate charge against the $4,533 one-time Sanitation Capacity Charge (CVWD Sewer Service Rates, eff. July 1, 2025) -- e.g. an 800 sq ft ADU with a 1,600 sq ft primary home pays $2,266.50. Applies only to parcels in CVWD's service area (south of Avenue 56); the City of Coachella Sanitary District serves parcels north of Avenue 56. Coachella verified rows 1 → 2, so the /fees/coachella/ page reaches the 2-verified-rows threshold and its noindex lifts. Verified rows sitewide 657 → 658.
Coachella
Published: 15 Nov 2026
Claremont: ADU permit verified — $1,030 flat; city reaches 2 verified rows
Claremont: Accessory Second Unit (ADU) Permit verified at $1,030 flat (CLAREMONT-NEW-01) — Citywide User Fee Schedule adopted June 23, 2026, effective July 1, 2026, Community Development - Planning, Land Use Review item 73: 'Accessory Second Unit Permit $1,030.00 Fixed.' 'Accessory Second Unit' is the schedule's term for the ADU permit required by Claremont Municipal Code §16.333.050(A); the City's Planning Permits page lists the Accessory Dwelling Unit Permit Application. Fixed fee, no valuation or per-sq-ft component. Claremont verified rows 1 → 2, so the /fees/claremont/ page reaches the 2-verified-rows threshold and its noindex lifts. Verified rows sitewide 656 → 657.
Claremont
Published: 15 Nov 2026
Chino: city ADU development impact fees verified — $8.20/sq ft (was 1 verified row); city reaches 2 verified rows
Chino: city development impact fees for ADUs verified at $8.20/sq ft (CHINO-NEW-01) — Res. No. 2025-030, FY 2025-26 DIF, §10 Accessory Dwelling Units, 'Total Cost per Square Foot for ADUs (751–1,200 SF)' $8.20 (Law Enforcement $0.25 + Fire Protection $0.56 + Circulation $1.83 + Storm Drainage $0.96 + Water Distribution $1.10 + Sewer Collection $0.23 + General Facilities $0.07 + Public Use $2.02 + Parks $1.17; printed components sum to $8.19, the resolution's published total is $8.20). $6,560 on an 800 sq ft ADU; $0 at 750 sq ft or less under Gov. Code §66311.5. Citywide schedule (outside The Preserve); The Preserve has a separate ADU DIF schedule ($16.30/sq ft). A 3% DIF administrative fee applies to the non-park portion and is not included in the $8.20 rate. Adopted 17 Jun 2025, effective 16 Aug 2025 (60 days after adoption, Gov. Code §66017). No FY 2026-27 DIF adjustment resolution was located. Chino verified rows 1 → 2, so the /fees/chino/ page reaches the 2-verified-rows threshold and its noindex lifts. Verified rows sitewide 655 → 656.
Chino
Published: 15 Nov 2026
Calexico: fire facilities impact fee verified — $712 per dwelling unit; city reaches 2 verified rows
Calexico: Fire facilities development impact fee verified at $712 per dwelling unit (CALEXICO-NEW-01, per-dwelling base; an ADU pays proportionally per Gov. Code §66311.5 — $356 at the 1,600 sq ft default primary for an 800 sq ft ADU; $0 at 750 sq ft or less). Source: City of Calexico 6th Cycle Housing Element Update, Section 3, Table 3-9 (Fire Facilities, Single Family Home per unit $712), corroborated by California State Auditor Report 2021-805 (Oct 2022, current fee charged $712). Confidence B: the underlying DIF schedule is 2021-vintage and its PDF could not be extracted; the Housing Element was revised in 2026 and still publishes $712, and the Apr 15, 2026 temporary fee schedule covered planning/building/encroachment fees only, not impact fees. Calexico verified rows 1 → 2, so the /fees/calexico/ page reaches the 2-verified-rows threshold and its noindex lifts. Verified rows sitewide 654 → 655.
Calexico
Published: 15 Nov 2026
Kern County: Kern High school-district share verified — $1.88/sq ft (was to_verify); county reaches 2 verified rows
Kern County (unincorporated): Kern High School District 35% share verified at $1.88/sq ft (KERN-NEW-02), computed as 35% of the $5.38 SAB Level I maximum (Jan 28, 2026). The Greenfield USD 2026 Fee Justification Study (Apr 28, 2026; Res. No. 26-15 adopted May 13, 2026) states the allocation agreement with KHSD -- Greenfield 65% = $3.50 of the maximum -- and covers unincorporated Kern County; the remaining 35% is KHSD's share by the same agreement. KHSD's FY 2024-25 annual report confirms the district levies the statutory maximum ($5.17/sq ft in effect then). 800 sq ft = $1,504; combined with KERN-NEW-01 (Greenfield $3.50) the school fee totals $5.38/sq ft, the Level I cap, for Greenfield-territory parcels. Confidence B: the $1.88 figure is computed, not stated directly by KHSD -- no KHSD-published $1.88 figure was located (KHSD's own rate page still posts no rate). Same computed basis as BAKERSFIELD-NEW-01, verified 2026-11-13. Kern County verified rows 1 → 2, so the /fees/kern-county/ page reaches the 2-verified-rows threshold and its noindex lifts. Verified rows sitewide 653 → 654.
Kern County (unincorporated)
Published: 14 Nov 2026
Buena Park: no fixed valuation $/sq ft — permit value is set per project
Buena Park building-permit valuation basis confirmed — there is no fixed $/sq ft rate. Res. No. 14482, Table A prices new residential permits 'Based on Building Valuation as Determined by the Building Official or Data Published by the International Code Council' (2019 CBC §109.3 — the applicant declares the permit value including materials and labor; the Building Official sets the final valuation). The city's February 2026 permit report confirms valuations are per-project: declared values on issued ADU permits were $130,000 for an 845 sq ft detached ADU, $150,000 for 1,000 sq ft, and $60,000 for 315 sq ft. The seven valuation-based rows (Table A permit fee, plan review 85%, electrical 10%, plumbing 6%, mechanical 6%, zoning, GPM 4%) therefore still carry no 800 sq ft dollar figure, and valuation_psf stays null — no number was invented. Verified rows sitewide unchanged at 653.
Buena Park
Published: 14 Nov 2026
Carlsbad: certificate of occupancy is a standalone change-of-use permit fee — $0 on a standard ADU (was $89 to_verify)
Carlsbad: the Certificate of Occupancy row (CARLSBAD-NEW-12) verified as $0 for a standard detached ADU — the published $89 is the fee for a standalone Certificate of Occupancy Permit (Master Fee Schedule FY 2026-27 #1012, per permit), issued for a change of use/occupancy under CMC 21.60.010, not a line on a new-construction building permit. The MFS lists 'Certificate of Occupancy' only once, among the standalone flat-fee Minor/Miscellaneous permits, and the valuation-based new-construction building section carries no CofO line. The city's Fee Guide REV. 12/23 Example 3 (800 SF detached ADU, total $8,220.58) lists a single Building permit fee of $1,330 and no CofO line — the listed lines sum exactly to $8,220.58 — and Example 1 (new detached single-family home) likewise lists no CofO line although a new home unquestionably receives a CofO. The city issues a 'Certificate of Occupancy Permit' for a change of use (PRE 2025-0032, July 21, 2025; Planning Commission Resolutions 7014 and 7100). The $89 is kept in the row notes as the standalone-permit reference amount. Verified rows sitewide 652 → 653.
Carlsbad
Published: 14 Nov 2026
Carlsbad: water connection and capacity charges do not apply to a standard ADU — $0 (was $5,865–$13,197 to_verify, 6 rows)
Carlsbad: six water connection/capacity rows (CARLSBAD-NEW-06..11) verified as $0 for a standard detached ADU — the published rates are new-service charges that a standard ADU does not trigger: Potable Water Connection Fee 5/8 in $5,865 (#594) / 1 in $13,197 (#596); SDCWA System Capacity Charge 5/8 in $6,501 (#610) / 1 in $10,402 (#612); Water Treatment Capacity Charge 5/8 in $182 (#624) / 1 in $291 (#626), all from Master Fee Schedule FY 2026-27. A detached ADU on an existing lot shares the lot's single water service — 'Only one water and sewer service allowed for existing lot' (city PRE 2025-0004, Apr 4, 2025) and 'Having a separate water, sewer or power connection from the existing primary residence is not required' (IB-111, Aug 2026) — so no new connection fee applies. If the existing meter is undersized, an upgrade may be required and the charge is only the incremental difference (CMWD Rules Ch. 2.12 credits the existing meter on exchange); where a 1 in meter is required only by a fire-sprinkler requirement, fees are based on the water-use meter size (CMWD Ord. 45). The six published rates are kept in the row notes as non-ADU reference amounts. Verified rows sitewide 646 → 652.
Carlsbad
Published: 14 Nov 2026
Carlsbad: Affordable Housing Impact Fee does not apply to ADUs — $0 (was $2,925 to_verify)
Carlsbad: Affordable Housing Impact Fee (CARLSBAD-NEW-03) verified as $0 for a standalone ADU — the $2,925 per-unit figure in Master Fee Schedule FY 2026-27 #1140 is the CMC 21.85.060 Inclusionary Housing Impact Fee, which applies only to residential projects whose discretionary-approval application was deemed complete before May 21, 1993, so a 2026 ADU cannot be charged it. City staff state 'The inclusionary housing ordinance does not apply to ADUs' (Planning Commission staff report, Lopez Residence ADU, June 18, 2025), and ADUs may instead satisfy inclusionary requirements (CMC 21.85.070.B; IB-157, Sept 2025). The $2,925 figure is kept in the row notes as the non-ADU reference amount. Verified rows sitewide 645 → 646.
Carlsbad
Published: 14 Nov 2026
Carlsbad: sewer General Capacity Fee verified — $1,294 (1 EDU per ADU)
Carlsbad: Sewer General Capacity Fee verified — $1,294 for a new detached ADU (CARLSBAD-NEW-02). The EDU question is settled from published sources: CMC Table 13.10.020(c)(4) (Ord. CS-207, adopted 26 Mar 2013) assigns 1.00 EDU to a housing accommodation designed for occupancy by a single person or one family, and an ADU meets that definition (Gov. Code §65852.2(j)(1)), so one ADU is 1 EDU at the Master Fee Schedule FY 2026-27 rate of $1,294 per EDU (eff. Sept 1, 2026). State law allows a proportionate capacity charge for a new detached ADU (§65852.2(f)(5)); no new-connection charge applies to an ADU within existing space (§65852.2(f)(4)). Sewer benefit-area fees stay parcel-specific and unencoded. Verified rows sitewide 644 → 645.
Carlsbad
Published: 14 Nov 2026
Carlsbad: waste management plan fee verified — $45 per permit
Carlsbad: Waste Management Plan (C&D) fee verified — $45 per permit (CARLSBAD-NEW-14). Master Fee Schedule FY 2026-27, Section 2 (eff. Sept 1, 2026): 'Waste Management Plan (C&D) fee, per permit $45'. The plan applies to a new ADU: the city's Construction & Demolition Waste Diversion & Recycling Guide states the C&D requirement covers 'all demolitions and new construction, additions and alterations' and that CALGreen requires a waste management plan before construction starts (city B-59 form, before permit approval). Verified rows sitewide 643 → 644.
Carlsbad
Published: 14 Nov 2026
Buena Park: Anaheim Union HSD share verified for Savanna-area parcels — $2.69/sq ft (FI-549)
AUHSD Resolution No. 2025/26-F-08 (adopted 7 May 2026) and its 2026 Fee Justification Study confirm the $2.69/sq ft high-school share for Savanna-area parcels: the study's fee-sharing section names Savanna School District among the five feeder elementary districts in the Ed. Code 17623(a) allocation agreement, with AUHSD collecting 50% of the $5.38 cap. New verified row FI-549 pairs with FI-547 (Savanna ESD $2.585) for a combined $5.275/sq ft ($4,220 on 800 sq ft). The Buena Park draft post's southern school-fee passages were corrected to match (Centralia/Cypress areas $5.38, Savanna $5.275; Magnolia ESD still unverified). Verified rows sitewide 642 -> 643.
Buena Park
Published: 14 Nov 2026
Oxnard: Oxnard SD school fee rises to $3.55/sq ft (Res. 26-05); OUHSD share $1.76 verified (FI-548)
Oxnard School District adopted Resolution No. 26-05 on Aug 5, 2026 (public hearing, agenda item B.2; vote 5-0 per meeting video roll call -- the agenda-packet copy is an unsigned draft with blank vote lines, and no signed resolution or approved Aug 5 minutes were located). Section 14 levies $3.55/sq ft residential (66% of the $5.38 SAB cap); Section 23 makes it effective 60 days from adoption, Oct 4, 2026. FI-325 updated $3.41 -> $3.55. Oxnard Union HSD's 2026 adoption was not found (no 2026 study or resolution in Granicus or general search), so its share stays $1.76 (FI-548, new verified row; 34% of the $5.17 cap). Combined Oxnard school fee is now $5.31/sq ft ($4,248 on 800 sq ft, was $4,136); the Oxnard post and the school-fee ranking were corrected to match. Post total $308,000 unchanged ($112 inside $1,000 rounding). Verified rows sitewide 641 -> 642.
Oxnard
Published: 14 Nov 2026
Thin fee pages removed from search index — 34 pages now noindex (fewer than 2 verified rows)
Work 3 (AdSense 'low value content' response): /fees/ pages with fewer than 2 verified fee rows are now noindex and excluded from the sitemap — 34 pages (Bellflower, Calexico, Chino, Claremont, Coachella, Covina, Davis, El Centro, Encinitas, Garden Grove, Glendora, Inglewood, Kern County, La Mesa, Los Altos, Los Gatos, Lynwood, Montebello, Monterey Park, Moorpark, Mountain View, Pico Rivera, Redwood City, Rosemead, Sacramento County, San Bernardino, San Fernando, Santa Cruz County, San Diego County, Temple City, Thousand Oaks, Tracy, Walnut, Whittier). LA-BASE has no page. The condition lifts itself when a page reaches 2 verified rows; no fee data changed. Verified rows sitewide unchanged at 641.
Bellflower · Calexico · Chino · Claremont · Coachella · Covina · Davis · El Centro · Encinitas · Garden Grove · Glendora · Inglewood · Kern County (unincorporated) · La Mesa · Los Altos · Los Gatos · Lynwood · Montebello · Monterey Park · Moorpark · Mountain View · Pico Rivera · Redwood City · Rosemead · Sacramento County (unincorporated) · San Bernardino · San Fernando · Santa Cruz County (unincorporated) · San Diego County (unincorporated) · Temple City · Thousand Oaks · Tracy · Walnut · Whittier
Published: 14 Nov 2026
SB 1117 countdown published — 48 days out; Sacramento cliff corrected to $5,347
SB 1117 countdown published — 48 days to January 1, 2027, when the 750 sq ft cliff becomes marginal math for a homeowner's first two ADUs. The savings table uses the corrected Sacramento cliff $5,347 (CDD-0419 rev. 2026-07-12: STA $1,154.64 + Park $2,617.50 + SAFCA $1,575), ~$5,013 saved on 800 sq ft; the stale $5,728 is corrected in five posts and logged in /corrections/ (14 Nov 2026). No new fee rows in this run.
Sacramento
Published: 14 Nov 2026
Buena Park: Savanna school fee verified — $2.585/sq ft
Buena Park school fee verified — Savanna ESD residential developer fee $2.585/sq ft (FI-547), confirmed by the district's Annual Developer Fee Report for the fiscal year ending June 30, 2026 (presented to the board 8 Sep 2026, agenda item 13-g); same rate as FY2024-25, and no 2026 board action changed it (all 2026 meetings Mar-Nov checked, no developer-fee item). Fund arithmetic cross-checked: $269,070.14 opening + $59,943.58 received + $7,441.48 interest - $63.08 treasurer fees - $283,971.42 construction = $52,420.70 ending balance, exact. Elementary share alone is $2,068 on 800 sq ft; the Anaheim Union HSD share for Savanna-area parcels is still unconfirmed, so no combined total is shown. Verified rows sitewide 538 → 539.
Buena Park
Published: 13 Nov 2026
El Monte: development impact fees re-verified - $10,217.26 base unchanged
El Monte development impact fees re-verified - $10,217.26 SFR base unchanged. The FY 2026-27 Building Permit Fee Schedule (DocumentCenter View/7825, effective 7/1/2026) contains no development impact fee table - it refers DIF to the Public Works/Engineering Division only. The FY 2025-26 Public Works Engineering Fees schedule (View/7398) remains the city's current published DIF source (still linked from the city Permits page, checked 13 Nov 2026); its SFR components re-sum exactly: sewer $1,652.38 + storm drain $985.03 + street $868.83 + park $6,430.44 + traffic $72.39 = $10,009.07 + 2.08% tech $208.19 = $10,217.26 base, unchanged. No FY 2026-27 Public Works schedule found. FI-156 last verified 13 Nov 2026. No new fee rows in this run.
El Monte
Published: 13 Nov 2026
FI-245 source corrected to BCSD June 2024 report — $3.50/sq ft unchanged
FI-245 source corrected (Bakersfield school fee, BCSD $3.50/sq ft — rate unchanged): the cited source URL pointed to Greenfield Union SD's Apr 28, 2026 Fee Justification Study, a different district's document. No BCSD 2026 study was located, so the source now cites BCSD's June 2024 School Facility Fee Justification Report, whose Executive Summary states the 65% BCSD / 35% Kern High split; $3.50 = 65% x the $5.38 SAB Level I cap (Jan 28, 2026). Last verified 13 Nov 2026.
Bakersfield
Published: 13 Nov 2026
El Monte fee-schedule link updated to FY 2026-27
El Monte fee-schedule link updated from the FY 2025-26 schedule to the FY 2026/2027 Building Permit Fee Schedule (effective 2026-07-01, Resolution No. 10313; permit issuance $51.69 and school fees $3.36-$3.43/sq ft confirmed in the new document). No fee amounts changed in this run; FI-156 city development impact fees still cite the FY 2025-26 schedule and need re-checking against the FY 2026-27 document.
El Monte
Published: 13 Nov 2026
Buena Park southern school fees verified (Centralia, Cypress, AUHSD)
Southern Buena Park school fees verified from the districts' own 2026 documents: Centralia ESD $2.69/sq ft (Res. #1794, adopted 11 Mar 2026, effective 10 May 2026; 2026 Fee Justification Study, Koppel & Gruber, 30 Jan 2026), Cypress SD $2.69/sq ft (Res. 25/26-17, adopted 9 Apr 2026, effective 8 Jun 2026; 2026 Fee Justification Study, 20 Mar 2026), and Anaheim Union HSD $2.69/sq ft (Res. 2025/26-F-08, adopted 7 May 2026, effective 6 Jul 2026; 2026 Fee Justification Study, Koppel & Gruber, 13 Apr 2026). Each elementary + AUHSD pair sums to the $5.38 SAB Level I cap ($4,304 on 800 sq ft) under the Ed. Code 17623 50/50 allocation agreement, encoded as two mutually exclusive area schedules (Centralia/AUHSD, Cypress/AUHSD) so they never sum with the northern BPSD/FJUHSD row. Verified rows sitewide 538 to 542. Magnolia and Savanna elementary shares still unconfirmed.
Buena Park
Published: 13 Nov 2026
OC San capacity charge corrected to $1,710 flat — Anaheim, La Habra, Orange County
OC San sewer capacity charge (CFCC) corrected to the FY 2026-27 Table A one-block reading — $1,710 flat on an 800 sq ft ADU. Anaheim FI-121: per-sq-ft $1.71 ($1,368 at 800 sq ft) → flat $1,710; Table A footnote 1 ('on a 1,000 square foot, or portion thereof, basis') resolves the rounding question the Oct 7 city reply left open, and the Anaheim post's fee table, key facts, and FAQ now read $1,710 with three unconfirmed assumptions remaining. La Habra FI-202 and Orange County FI-351: FY 2025-26 $1,695 → FY 2026-27 $1,710. The utility-bills post's Anaheim row and the Torrance post's passing mention are corrected to $1,710. Verified rows sitewide unchanged at 538 (corrections to existing verified rows, no new rows); Anaheim post total unchanged at $320,000.
Anaheim · La Habra · Orange County
Published: 13 Nov 2026
Buena Park: Building permit fee schedule verified - Res. 14482 Table A + ADU Review $605
City of Buena Park building permit fee schedule verified - Resolution No. 14482 (adopted Apr 12, 2022, eff. Jul 1, 2022), Attachment B, read visually from the 15-page scanned-image PDF via a live browser session on Nov 13, 2026 (the fee-table pages carry no text layer; Table A bands cross-checked 7/7: each band base equals the fee at the previous band's top). Nine new verified rows: Table A building permit fee $100,001-$500,000 band ($1,145 + $5.50 per $1,000 over $100,000, valuation_step, full 8-band table in the row notes); Permit Issuance Fee $25 flat; Building Plan Review 85% of the permit fee ($82 minimum); Electrical 10%, Plumbing 6%, Mechanical 6% of the base permit fee; ADU Review $605 per application (Planning item 41 - upgrades the 2022-vintage PARTIAL: no newer schedule found, all 49 Building Division Forms and Handouts entries checked); Zoning Compliance Plan Check $1.40 per $1,000 of valuation up to $250,000; General Plan Maintenance surcharge 4% of building fees. No 800 sq ft total: valuation is set by the Building Official or ICC data and no confirmed $/sq ft ADU valuation basis exists, so the valuation rows render with amount — until a basis is confirmed. Buena Park now has 10 rows, all verified; verified rows sitewide 538 → 547 in this branch. The draft post's 'no current schedule located' text is now stale and needs a post-correction follow-up (deferred to avoid clashing with the pending school-fee branch).
Buena Park
Published: 13 Nov 2026
Buena Park school fee verified ($5.38/sq ft, BPSD + FJUHSD)
Buena Park school fee verified: combined $5.38/sq ft (Buena Park SD $3.59 K-8 + Fullerton Joint Union HSD $1.79, grades 9-12) from the FJUHSD 2026 Fee Justification Study (Apr 21, 2026; public hearing May 12, 2026) - $4,304 on an 800 sq ft ADU, most of the city; southern Buena Park (Centralia ESD / Anaheim Union HSD) not covered, rates unverified. Buena Park verified rows 1 -> 2; draft post total $304,000 -> $308,000 floor ($385/sq ft).
Buena Park
Published: 13 Nov 2026
OC San ADU charge standard confirmed: $1,710 per block; Costa Mesa FI-204 corrected $1,368 to $1,710
OC San interpretation standard confirmed from the district's own Table A/B 2026-27 (eff. July 1, 2026): ADUs pay the average-demand rate of $1,710 per 1,000 sq ft, and footnote 1 states all calculations are on a 1,000-sq-ft, or portion thereof, basis — so an 800 sq ft ADU is one full block at $1,710, not a pro-rata 0.8 x $1,710 = $1,368. Costa Mesa FI-204 corrected $1,368 to $1,710 (same per-block reading already used for Buena Park FI-432 and Newport Beach; the Batch 19-28 re-verification had corrected those two but missed Costa Mesa). Costa Mesa 800 sq ft verified fee total $5,846 unchanged — the Costa Mesa post already used $1,710; only the fee-database row and the post's stale pro-rata flag were corrected. Remaining OC San follow-ups: Anaheim FI-121 still encodes $1.71/sq ft (post uses a $1,368-$1,710 range) and La Habra FI-202 / Orange County FI-351 still carry the FY 2025-26 $1,695 rate — vintage check pending.
Costa Mesa
Published: 13 Nov 2026
Arcadia: 11 fee rows verified - permit, park and fire impact fees, water connection (1 verified row to 12)
Arcadia verified rows 1 to 12: building permit issuing fee $63 and solid waste fee $7 per permit (Res. No. 7558, eff. July 1, 2024); plan check 65%, energy review 20%, CalGreen review 10% of plan check, and technology fee 5.5% of permit and plan check fees - all percentages of the valuation-based permit fee, so they render as '—' with no dollar amount until the city pins down an ADU valuation basis (dwellings VA $164.40 / VB $154.24 per sq ft); ADU Permit $775 (Planning Fees, Res. No. 7684, eff. July 1, 2026) for the ADU-permit track only - a detached ADU of 800 sq ft or less needs only a building permit under ADC §9102.01.080(D)(1)(B), so it does not apply at 800 sq ft; Park Facilities Impact Fee $2.85/sq ft (Res. No. 6602) and Fire Protection Facilities Impact Fee $0.35/sq ft (Res. No. 7492), both applied to ADUs by the city's proportional rule (ADC §9102.01.080(G)(1)(B)) - 800 sq ft pays $2,280 + $280, $0 at 750 sq ft or less; water meter installation $159 and backflow test $287 for a new separate water connection (2026 Utility Rates & Service Charges). Not encoded, with reasons: the valuation-table building permit fee itself (band-1 per-$100 rate unreadable in the published PDF and no ADU construction type stated); Transportation Impact Fee $1,983 per PM peak-hour trip (Res. No. 7151 - no published ADU trip count); Zoning Clearance $383 (general clearance, not ADU-specific) and Covenant Preparation $420 (JADU deed restriction); bacteriological test $128 plus lab costs (total indeterminate); monthly meter and sewer charges (recurring bills, not one-time fees). AUSD $5.38 school fee adoption resolution (Feb 24, 2026 board meeting) not located in public search - FI-231 unchanged. Arcadia 800 sq ft verified fee total $4,304 to $7,380 (feeCalc verified).
Arcadia
Published: 13 Nov 2026
El Monte: school fee $3.36-$3.43/sq ft and $51.69 permit issuance verified
El Monte: school developer fee and building permit issuance fee verified in the City of El Monte Building Permit Fee Schedule FY 2026/2027 (eff. 7/1/2026), read live November 13, 2026. Residential school fee $3.36-$3.43 per sq ft for projects over 500 sq ft (combined elementary + high-school total, paid at El Monte Union HSD; exact rate varies by elementary district per the schedule's justification-study note, so the range is encoded as one row with no area split); 800 sq ft ADU $2,688-$2,744, $0 under 500 sq ft per SB 543. Building permit issuance $51.69 flat per permit. The valuation-table permit fee and 85% plan check fee are not encoded: the schedule's Square Foot Construction Costs table did not extract as text, so no ADU valuation basis was confirmed. El Monte now has 3 rows, all verified; verified rows sitewide 538 to 540.
El Monte
Published: 13 Nov 2026
Santa Maria: Traffic Improvement Fee verified — $3.87/sq ft, $3,096 on an 800 sq ft ADU
Santa Maria Traffic Improvement Fee verified — $3.87 per sq ft for Single Family (also listed for Single Family Additions) in the City of Santa Maria 2025/2026 Public Works Fee Schedule (July 1, 2025-June 30, 2026), Traffic Improvement Fee Program table Rev. 07/01/2024, read live November 13, 2026. $3,096 on an 800 sq ft ADU; $0 at or below 750 sq ft under Gov. Code §66311.5(c). Santa Maria now has 2 rows (2 verified). Verified rows sitewide rise from 538 to 539. Not verified in this round: building permit fees (no adopted Santa Maria permit-fee table located; the June 2, 2026 council-adopted comprehensive user-fee schedule was not retrieved in verifiable form), the $4,281 single-family sewer connection fee (an ADU is not a new residential use for connection-fee purposes under Gov. Code §66324(b) unless built with a new single-family dwelling, and a new detached ADU's proportionate charge basis is not stated in the schedule), water connection fees (water service is Golden State Water; CPUC Resolution W-5262 removed connection fees and capacity charges for existing customers building ADUs), and the proposed development impact fee increase (2025 nexus-study draft, not adopted).
Santa Maria
Published: 13 Nov 2026
Palmdale: AVUHSD school share $1.34 + building permit fees verified - 1 to 8 verified rows
Palmdale verified rows 1 to 8 (7 new). School: AVUHSD high-school share $1.34/sq ft (Resolution No. 2024-25-16, adopted Nov 21, 2024, effective Jan 20, 2025; 26% of the $5.17 SAB maximum) pairs with PSD elementary share FI-243 ($3.83); 800 sq ft school total $4,136. PSD's 2026 Fee Justification Study (Sep 21, 2026) implies a ~26% AVUHSD share (~$1.40 of the $5.38 cap), but no AVUHSD 2026 document states $1.40, so the adopted $1.34 is used. The $1.25 rate in the FY 2023-24 Annual and Five-Year Report was the superseded pre-increase rate. Building permit (City of Palmdale Master Schedule of Fees & Penalties FY 2026-27, effective Aug 4, 2026): R-3 application fee $75 flat, permit issuance fee $37 flat; Table 1-A building permit fee with all 8 bands in the row notes (per-$1,000 rate applies to the amount in excess of the band floor; no confirmed $/sq ft ADU valuation basis, so no 800 sq ft total); plan check 85% of the Table 1-A fee; SMIP 0.013% of valuation (Group R, $13 per $100,000); Building Standards fee $1 per $25,000 (HSC Sec. 18931.6). The valuation-based rows render with amount '-' and carry no total (LA-CITY Table 1-A precedent). 800 sq ft flat-fee total from the new rows: $112 application + issuance; 800 sq ft total $4,248 (school $4,136 + flats $112). Not encoded: Palmdale park/fire/traffic/public-facility DIFs and the sewer capacity fee - the schedule states per-unit rates for new dwellings but no ADU row, so ADU applicability and the over-750 sq ft proportional amount are unverified; the 1.43 Group R-3/U combination-permit factor is likewise unconfirmed for ADU permits. Verified rows sitewide 538 to 545.
Palmdale
Published: 13 Nov 2026
Lancaster: AVUHSD school fee and current DIF verified - 1 verified row to 8
Antelope Valley Union High School District (9-12) school developer fee verified at $1.34/sq ft (Resolution No. 2024-25-16, adopted Nov 21, 2024, effective Jan 20, 2025) - the district's 26% share of the Level 1 maximum; with Lancaster SD's $3.98 (FI-317) the combined school fee is $5.32/sq ft, within the 2026 Level 1 cap of $5.38. No 2026 AVUHSD increase resolution was found, so $1.34 stands as the operative adopted rate. The 2024 news figure of $4.08 for AVUHSD was wrong - it was never the district's share. Six current development impact fees verified from the Citywide Fee Schedule effective October 1, 2025, Section 3 (superseding the stale 2021 Appendix B): traffic signal $1,399, traffic $2,227, park development $3,153, administrative offices $75, corporate yard $71, open space $372 per dwelling unit - all encoded with dwelling-base proration (800 sq ft ADU at the 1,600 sq ft default primary: $3,648.50; $0 at 750 sq ft and under). Not encoded, with reasons: drainage fee is now $0.48 per sq ft of lot (lot-size dependent, no ADU rule published); park in-lieu fee is bedroom-dependent ($591/$887/$1,184); biological fee is $770 per gross acre; LA County traffic fee ($1,578.17 per p.m. peak-hour trip, Appendix B) is not encoded — whether it applies to ADUs is unstated. The building permit valuation table is still not in the city's public fee schedule - the room-addition plan check band ($1,034 for 501-1,000 sq ft) is for additions, not new detached ADUs, so no permit row was added. Lancaster now has 8 fee rows, all verified; verified rows sitewide 538 to 545.
Lancaster
Published: 13 Nov 2026
Bakersfield: Kern High School District share verified — $1.88/sq ft
Bakersfield school fee completed — Kern High School District 35% share verified at $1.88/sq ft (BAKERSFIELD-NEW-01), computed as 35% of the $5.38 SAB Level I maximum (Jan 28, 2026). BCSD's June 2024 School Facility Fee Justification Report states the split explicitly: 65% ($3.36 at the $5.17 cap) to Bakersfield City SD, remaining 35% ($1.81) to Kern High School District; the $5.38 cap is corroborated by Greenfield Union SD's 2026 Fee Justification Study (Apr 28, 2026), which also confirms the 65% elementary share. 800 sq ft = $1,504; combined with FI-245 (BCSD $3.50) the Bakersfield school fee totals $5.38/sq ft, the Level I cap. Confidence B: the $1.88 figure is computed, not stated directly by KHSD — KHSD's FY2024-25 annual report states only the total Level 1 fee. Bakersfield verified rows 1 → 2. City building permit fees not added: the FY2026-27 Master Fee Schedule PDF sits behind CivicPlus asset links with no direct public URL, and third-party summaries are not official sources.
Bakersfield
Published: 13 Nov 2026
Downey: permit issuance, planning plan check, and valuation-band permit fee verified - 1 to 4 verified rows
Downey permit fees verified in the City of Downey Proposed City User Fee Schedule FY 2026-2027 (read Nov 13, 2026; adopted-fees column, effective July 1, 2026): building permit issuance $60.01 flat per permit (Section 6, item 3); Planning Division building plan check $330.46 per application for residential single-family new construction or expansions (Section 5, item 64; added by Council Resolution No. 25-8325, Nov 2025); building permit fee $100,001-$500,000 valuation band $2,171.42 + $10.32 per $1,000 over $100,000 (Section 6, item 11; full 11-band table in the row notes; at the post's assumed $150,000 valuation the permit fee is $2,687.42). The valuation-band row carries no 800 sq ft total: Downey publishes no per-sq-ft ADU valuation and the Building Official sets project valuation. Downey now has 4 rows (4 verified); verified rows sitewide 538 to 541. Jurisdiction fee_schedule_url updated from the FY 19-20 amended schedule to the FY 2026-27 schedule. Not found: Downey Unified's adopted 2026 school developer fee rate - the State Allocation Board raised the Level 1 maximum to $5.38/sq ft on Jan 28, 2026, but no DUSD board resolution or district page adopting $5.38 was found (last district-cited rate is $5.17/sq ft in the city's Aug 2024 schedule, now stale), so no school row was added; and no published ADU water/sewer capacity charge - the FY 2026-27 schedule's meter fees ($5,235 for a new 1-inch meter, meter box and service line) apply only if a new separate meter is installed, not to a standard ADU on the existing service.
Downey
Published: 13 Nov 2026
Oceanside: building permit fees verified - $5,378.10 + surcharges at 800 sq ft
Oceanside building permit fees verified - the first priced permit rows for OCEANSIDE (1 verified row to 4). City of Oceanside Building Division Fee Schedule, FY 2026-2027 (Res. No. 18-R0079-1), read November 13, 2026: plan check + inspection for a new single-family dwelling, Custom or Model Homes, 1,000 sq ft row (plan check $1,862.70 + inspection $3,515.40) = $5,378.10 - the city's ADU page assesses detached ADUs as new single-family dwellings, and the schedule's smallest Single Family row is 1,000 sq ft, so the 800 sq ft detached ADU carries this row's total. Surcharges confirmed from the same schedule: General Plan Update 10% and Technology Update 2% of the building permit fee - both render as a dash (percent of permit fee, not valuation; no ADU valuation basis on file), same treatment as the Los Angeles surcharge rows. Together the three rows confirm the Oceanside post's permit math (2018/2021-vintage tables) against the current FY schedule: $5,378.10 base plus the 12% surcharge load. Not verified in this run: fire review (20%) and water review (15%) from the post's older tables - not in the FY 2026-27 schedule; the $0 city impact-fee waiver - the ADU page carried the waiver language in a September 5 snapshot but not on the live page as of November 6, 2026, so it stays unconfirmed; the adopted parks fee ($6.03/sq ft single-family, eff. Jan 20, 2026) and its ADU application. Post text update is a follow-up, not in this branch.
Oceanside
Published: 13 Nov 2026
Santa Monica: building plan review + permit verified - $3,669.00 at 800 sq ft
Santa Monica building permit fees verified - the first priced permit rows for SANTA-MONICA (1 verified row to 3). City of Santa Monica FY 2026-27 Fee Schedule, Exhibit B (Building and Safety), read November 13, 2026: formal plan review for new one- and two-family dwellings incl. accessory buildings, item 704.03 ($777.20 + $1.73/sq ft) = $2,161.20 at 800 sq ft; combination building permit, item 704.37 ($163.80 + $1.68/sq ft) = $1,507.80 at 800 sq ft; plan review + permit together $3,669.00. The Santa Monica post's permit line was 'not counted (verify with city)' because current rates were unpublished (latest table 7/1/19); the FY 2026-27 schedule is now published. Not verified in this run: the SMMUSD school fee adoption - the district's June 8, 2023 justification study proposes $4.21/sq ft ($3,368 on 800 sq ft) but board adoption minutes were not located, and no 2026 $5.38 adoption was found, so no school row was added; the Public Works impact-fee amounts above 750 sq ft; the $742.55 Title 24 energy-compliance review, $180.40 application processing, and 13% tech-enhancement fee (per-ADU application unconfirmed). Post text update is a follow-up, not in this branch.
Santa Monica
Published: 13 Nov 2026
Palo Alto FY27 impact fee FI-017 verified — $18,090 on 800 sq ft ADU
Palo Alto FY27 impact fee FI-017 verified — $18,090 on an 800 sq ft ADU, proportional to a 2,000 sq ft primary dwelling. Re-verified live 13 Nov 2026 against the City of Palo Alto FY27 Impact Fee Information Sheet (as of August 17, 2026): single-family Community Facilities rates Parks $18.75, Community Center $1.44, Libraries $0.86 per sq ft; Public Safety $1,383 and General Gov. $1,743 per unit. Primary-dwelling total (21.05 x 2,000 + 3,126) = $45,226; ADU share 800/2,000 x $45,226 = $18,090.40, rounded to $18,090. Sheet states 'ADUs under 750 sq. ft. are exempt from Development Impact Fees' and 'ADUs 750 sq. ft. and larger. Fee is proportional to the size of the primary unit.' The 2,000 sq ft primary is the site series assumption, not a figure printed on the sheet — the sheet states the proportionality principle without printing a formula, as the Palo Alto post already discloses. Traffic fees (Charleston/Arastradero $1,743 per residential unit; citywide TIF $10,099 per net new PM peak-hour trip) remain excluded. No new fee rows in this run; verified rows sitewide 538 -> 539.
Palo Alto
Published: 13 Nov 2026
Pasadena: building permit and plan check fees verified - FY2027 schedule, RIF and TR/TIF $0 for ADUs of 900 sq ft or less
Pasadena verified rows 1 -> 19 (20 new rows: 18 verified, 2 to_verify), read live November 13, 2026. FY2027 General Fee Schedule (Resolution No. 10194, adopted June 8, 2026, effective July 1, 2026): building permit fee $100,001+ band $1,738 + $6 per $1,000 of valuation (fees 334-335) and plan check fees $100,001+ band - Building $2,607 + $9 (fees 421-422), Fire Exiting $504 + $2 (432-433), Public Works $321 + $1 (443-444), Current Planning $197 + $1 (454-455), Design and Historic Preservation $39 + $1 (465-466) - with the full six-band tables in the row notes; the City's March 2025 ADU fee study sample for a 600 sq ft ADU corroborates the plan check bundle (Building $1,952, Fire $400, Public Works $240, Zoning $167, Design and Historic $72). Construction Tax 1.92% of valuation (PMC 4.32.020, FY2027 STFC), General Plan Maintenance Fee 0.50% and Technology Fee 0.50% of valuation (GFS fees 321-322), each reduced 25% for ADUs of 900 sq ft or less on single-family sites (City ADU page; reductions effective July 17, 2025 for the RIF and Construction Tax) - encoded at the ADU-effective rates 1.44% / 0.375% / 0.375% up to 900 sq ft, with standard-rate companion rows above 900 sq ft. Residential Impact Fee and Traffic Reduction and Transportation Improvement Fee are $0 for ADUs of 900 sq ft or less (FY2027 STFC notes 11 and 10; FY2027 RIF per-bedroom fees studio $24,530.43 to 5+ bedrooms $45,406.92, and TR/TIF single-family tiers $4,474-$5,722 per dwelling unit, in the row notes for larger ADUs). Flat verified rows: Building and Safety Application/Plan Review Processing Fee $83 (GFS fee 359) and C&D Administrative Review Fee $427 (GFS fee 1213); SMIP 0.013% and Building Standards fee $4 per $100,000 (EDTECH Table 4 sample + PRC 2705(a) / HSC 18931.6(a)). To_verify: AB 717 Training Fee 1% of permit fee (no ADU-specific confirmation; percent-of-fee basis, not valuation) and sewer facilities charge $1,900 on a 2-bedroom basis ($9.50/gal/day x 200 gal/day; bedroom count unpublished, ADU applicability unconfirmed). No valuation basis: the City prices permits on ICC Building Valuation Data and publishes no $/sq ft ADU valuation, so valuation-based rows render with amount '-' and carry no 800 sq ft total; verified rows sitewide 538 -> 556. Note: the published Pasadena post still describes a proportional RIF of about $11,173 for an 800 sq ft 2-bedroom ADU behind a 2,000 sq ft house; the City's current ADU page and the adopted FY2027 schedule exempt ADUs of 900 sq ft or less, so the fee page now shows $0 for an 800 sq ft ADU - post text correction is a separate item.
Pasadena
Published: 13 Nov 2026
Fremont: school $5.38, sewer $6.46/sq ft verified — 5 new rows
Fremont school, sewer, water, and permit-surcharge fees verified — the first new Fremont rows since FI-277 (Fremont grows from 1 row to 6, all verified). FUSD Level 1 school developer fee $5.38/sq ft (2026 Fee Justification Study, Table E-1; Board approved Mar 25, 2026; effective May 24, 2026): 800 sq ft = $4,304, superseding the $4.79 ($3,832) figure in the Fremont post. Union Sanitary District ADU sewer capacity charge $6.46/sq ft (Ordinance No. 35.24, Exhibit A; adopted Jul 27, 2026; effective Oct 1, 2026): 800 sq ft detached = $5,168, superseding the lapsed $5.09 ($4,072) rate; no charge for ADUs inside the living area or expanding the home by 150 sq ft or less. ACWD water capacity $0 for an ADU on an existing lot using the existing service (City Form 440F); the $9,350 comprehensive connection charge applies only to an ADU built with a new single-family home. Community Planning Fee 15% and Permitting Technology Fee 3% of plan review/inspection fees verified from the Building & Safety fee list — both render as '—' (percent of permit fees, not valuation; no ADU valuation basis on file). Not verified in this run: the current building permit valuation table (Master Fee Schedule PDF returns 403 from Fremont's site; the Nov 4, 2025 council agenda packet does not contain the schedule), the construction tax's ADU application ($3,037 per new single-family dwelling vs $0.76/sq ft in the ~2022 Housing Element), and the two planning deposits (Limited CPC-ADU/JADU $1,000; Limited Master PDU/ADU/JADU $2,000) — deposits against job-cost review, not fixed fees for every ADU. The Fremont post still shows the superseded $3,832 school and $4,072 sewer figures; post text update is a follow-up, not in this branch.
Fremont
Published: 13 Nov 2026
Sacramento: CDD-0419 re-verified against the July 2026 revision - 4 rows verified, school fee corrected to $5.38
City of Sacramento ADU fees re-verified against the live CDD-0419 worksheet, revised 2026-07-12 (the 2023-10-01 revision is superseded; valuation $165.67/sq ft is now $170.80/sq ft). 750 sq ft column, read live November 13, 2026 from the current cityofsacramento.gov PDF: building permit fee $1,242.60 to $1,268.71 (FI-130), building plan review fee $425.00 to $532.86 (FI-131), fire department fees $308.00 to $730.00 (FI-132; new structure is Administrative Fee $176 + Plan Review $260/hr + Inspection $294, $0.11/sq ft with a $294 minimum), city development impact fees $5,725.64 to $5,347.14 (FI-133; STA Mitigation Fee + 2% admin $1,154.64 + Park Development Impact Fee $2,617.50 + SAFCA Development Impact Fee $1,575). The full 750 sq ft column sums to the worksheet total $10,624.40 exactly. All four rows move from to_verify to verified. School developer fee FI-134 corrected $5.13 to $5.38/sq ft per CDD-0226 revised 2026-09-09 (SCUSD; other in-city districts in the row notes: Elk Grove USD $7.23, Twin Rivers USD $5.38, Natomas USD $5.17, San Juan USD $5.38); $5.38 x 800 sq ft = $4,304. Sacramento now has 5 of 5 rows verified; verified rows sitewide 538 to 542. Jurisdiction valuation basis updated to $170.80/sq ft and the fee schedule URL moved to the current cityofsacramento.gov PDF.
Sacramento
Published: 14 Nov 2026
San Diego: removed two unsourced to_verify rows (FI-003 duplicate, FI-004 refuted estimate)
San Diego: deleted FI-003 and FI-004 (both to_verify). FI-003 ($16,500 flat “Building permit fees, 800 sq ft worked total (IB-501)”) duplicated the verified SD-CITY-NEW-02 plan check ($8,085.26) + NEW-03 inspection ($8,401.90) = $16,487.16, rounded. FI-004 ($5,000-$8,000 “Impact fees newly triggered above 750 sq ft”) had no source and is refuted by SDMC section 142.0640(b)(1)(A): the first two ADUs on a premises are exempt from DIF regardless of size (verified as SD-CITY-NEW-01, $0).
City of San Diego
Published: 13 Nov 2026
San Diego: school fee $5.38/sq ft, water/sewer plan check $176.57, CWA capacity $0 (shared meter)
City of San Diego water, sewer and school fees verified - three new rows (verified 538 to 541 on this branch; the unmerged round-1 branch adds 8 more separately). School developer fee: San Diego Unified levies the SAB Level I residential rate of $5.38 per sq ft (Board resolution 2026-03-10; current rates effective May 2026); IB-146 exempts ADUs under 500 sq ft, so an 800 sq ft ADU pays $4,304. Water and sewer plan check (IB-501 Table 501D, Aug 2026): $176.57 for SDU/Duplex/Townhome with no water meter change - the standard shared-meter case. County Water Authority capacity charges: $0 when the ADU shares the existing meter (Ordinance 2025-02 charges only on a new meter or a capacity increase); a new meter under 1 inch would cost $6,683 in CY2026. Not verified in this run: City of San Diego water/sewer capacity charges (published $3,047 water and $5,154 sewer per EDU in the Schedule for Water and Sewer Fees) - the schedule states no ADU-specific rule, so no row was added; see the research note for detail. FI-003/FI-004 untouched.
City of San Diego
Published: 13 Nov 2026
South Pasadena: Growth + Park impact fees verified — $1.64 and $7.65 per sq ft
South Pasadena: Growth Management Fee ($1.64/sq ft, #185) and Park Impact Fee - Residential NEW ($7.65/sq ft, #187) verified in the Amended Schedule of Fees FY 2026-2027 (Res. 8000, eff. 2026-07-06, amended Res. 8037 2026-10-07), re-read live 2026-11-13. The Growth Fee applies to new residential construction (city permit conditions: 'required for new constructions and additions', SPMC Ch. 16A) and the Park Fee is due at permit issuance (Quimby Act / AB 1600, Fund 275); Gov. Code §66311.5 bars both at 750 sq ft or less. At 800 sq ft the calculator shows Growth $1,312 and Park $6,120 — with the standing caveat that the city's proportionality practice is unconfirmed (batch24 target #2, 12/1 re-verification): the true 2026 amount is (ADU sq ft / primary sq ft) x the full-sq-ft figure, and the SB 1117 2027 basis is the 50 sq ft excess only ($82.00 / $382.50). Six lines stay to_verify with rates re-confirmed from the same crawl: Park REMODEL #188 $7.65/sq ft (conversion-ADU variant — verifying it would double-count against #187 for detached ADUs), Sewer Construction #499 $859 and Sewer Connection/Inspection #495 $510 (alternatives depending on new vs existing lateral; ADU application unconfirmed), Water Service Installation #492 $9,147 and Water Meter #493 $1,200 (both under the schedule's 'Deposit-Based Fees' heading; separate-service case, Gov. Code §66324(d) may bar a separate connection), Public Works Plan Check #518 $1,160 (asterisk footnote not captured; ADU application unconfirmed). South Pasadena verified rows 0 to 2 in this branch; verified rows sitewide 538 to 540 in this branch. The /fees/south-pasadena/ page leaves the zero-row noindex state automatically when this merges (2 verified rows meets the 2-row AdSense bar).
South Pasadena
Published: 13 Nov 2026
Los Angeles: permit issuing fee $27 verified — LA-CITY 14 rows, 800 sq ft verified $4,331
City of Los Angeles phase 2: building permit issuing fee $27.00 verified (LAMC §98.0415(c), Ord. 181,758, eff. 8 Aug 2011) — flat $27 per building permit issued, no ADU or residential exception in the section; the §91.107.2.2 combined building-mechanical permit counts as one building permit. Read live November 13, 2026; currency corroborated by the Jul 2, 2026 City Clerk report (CF 25-0006-S57) quoting §98.0415(c) building permits $27.00. LA-CITY 800 sq ft verified total $4,304 → $4,331; verified rows sitewide 538 → 539. Not verified in this batch: LADWP water capacity — no published ADU rate; the only LADWP installation schedule found is FY2023/2024 and LADWP states charges are contingent on site-specific service requirements, so no row was created. LA Sanitation SFC (LA-CITY-NEW-14, $454–$619 to_verify in the cycle372 branch) re-checked live November 13, 2026: rates unchanged, still no ADU facility type in the BOE rates table — BOE selects the type at S-Permit application — so the row stays to_verify; no duplicate SFC row created.
City of Los Angeles
Published: 13 Nov 2026
ADU fire sprinkler rules post published; property tax calculator live
ADU fire sprinkler rules post published — the two-question test (CAL FIRE Information Bulletin 25-004; California Residential Code §R309.2 detached-ADU exception: no sprinklers when all four conditions hold — state ADU definition, unsprinklered primary home, 1,200 sq ft or smaller, same lot), plus published NFPA 13D cost ranges. Last verified 5 Nov 2026. Also live today: property tax calculator (/property-tax/, county-average rates from the State Board of Equalization 2024-25 annual report) and corrected meta descriptions for 36 scheduled posts. No new fee rows in this run.
Published: 12 Nov 2026
South Pasadena: ADU Review - Ministerial verified - $633 planning fee; first verified row for the city
South Pasadena: ADU Review - Ministerial ($633 flat, planning) verified in the Amended Schedule of Fees FY 2026-2027 (Res. 8000, eff. 2026-07-06, amended Res. 8037 2026-10-07), re-read live 2026-11-12. The line sits first in the Design Review section, ahead of Director Design Review #102 and Single Family Residence #104, with Multi Family #107-111 and Commercial #112-114 following - the section is a menu of design-review fees by project type, and #101 is the ADU's applicable line. Ministerial review is the standard ADU path (SPMC 36.350.200), so the fee applies to every ADU application. This corrects the batch24 finding that the planning fee appeared to be $0 (that finding rested on the April 2026 Willdan study, which contains neither #101 nor #168-171). Stacking with the Minor review line #171 ($222) is still unresolved - its section header is missing from the schedule extraction - so #171 stays to_verify and is not added to the total. The Technology Surcharge #183 (10% on planning permits) is not added; the $696.30 figure is recorded in the row notes for reference. South Pasadena now has its first verified row (0 to 1); verified rows sitewide 538 to 539 in this branch. The /fees/south-pasadena/ page leaves the zero-row noindex state automatically when this merges (1 verified row is still below the 2-row AdSense bar).
South Pasadena
Published: 12 Nov 2026
City of San Diego: 8 fee rows verified - DIF $0, building plan check + inspection $16,487.16
City of San Diego: 8 fee rows verified from the City's own documents, re-read live 2026-11-12. Development Impact Fee $0 for the standard case: SDMC section 142.0640(b)(1)(A) (Chapter 14, 7-2026 edition, Division 6) exempts the first two ADUs on a premises from DIF regardless of size, with the 143.1305(c)(1) urban-lot-split exception and the 3rd-or-later-ADU rule at 750 sq ft or more, corroborated by the City Public Spaces FAQ and Planning Commission Report PC-25-016 (2025-04-24). This refutes the unsourced FI-004 estimate of $5,000-$8,000 for impact fees above 750 sq ft. Building fees from IB-501 (Fee Schedule for Construction Permits-Structures, Aug 2026), Table 501A Res-SDU/DUP: plan check $8,085.26 and inspection $8,401.90 (base covers the first 3,000 sq ft; $4.10/$4.21 per sq ft above), together $16,487.16, confirming FI-003's $16,500 as the rounded combined total. Also verified: General Plan Maintenance Fee $737 (II.1), Mapping Fee $12.16 (II.2), SMIP 0.013% of valuation (III.5, PRC 2705), Building Standards Fee $1 per $25,000 (HSC 18931.6), and Fee Collection - Other Agencies $17.11 (V). SMIP and CBSC render as amount dash: no confirmed $/sq ft ADU valuation basis exists for SD-CITY. Verified total for an 800 sq ft ADU: $17,253.43. FI-003 and FI-004 are annotated superseded/refuted in this branch, not deleted (deletion is the daily routine's call). City of San Diego now has 8 verified rows (0 to 8); verified rows sitewide 538 to 546 in this branch. The /fees/san-diego/ page leaves the zero-row noindex state automatically when this merges.
City of San Diego
Published: 12 Nov 2026
San Gabriel: 4 permit fees verified - plan review, electrical, issuance, CofO ($875 at 800 sq ft)
San Gabriel: 4 permit fees verified from the FY26-27 Master Fee Schedule PDF (city DocumentCenter View/25252), re-read live 2026-11-12 (359,463 bytes, SHA256 5fdb26970a5931d5ce37ccfb820443878008573d000118163b1ed0f9b3e18579, byte-identical to the cycle358/359/369 fetches the same day). Plan Review first 2 hours $397 (over-2-hours work is staff FBR plus outside costs and is not encoded; the $397 is the plan-review floor and the label states the 2-hour scope); Electrical new residential $0.35/sq ft for buildings under 2 units (800 sq ft = $280.00; the $450 SFR state limit does not bind at 800 sq ft); Combination permit issuance $62 (single issuance $43 is not the ADU case); Certificate of Occupancy $136 (temporary CofO $422 is not the standard case). Verified total at 800 sq ft: $875. These are permit fees, so the SGMC 153.047(U) proportionate rule for impact fees does not apply to them. The five impact-fee rows SG-NEW-01..05 stay to_verify: the schedule publishes no ADU-specific line or proration rule for them and the flat-vs-proportionate question can only be settled by city inquiry. San Gabriel now has 4 verified rows (0 to 4, above the 2-row AdSense bar); verified rows sitewide 538 to 542 in this branch. The /fees/san-gabriel/ page leaves the zero-row noindex state automatically when this merges.
San Gabriel
Published: 12 Nov 2026
Oxnard ADU cost post published — $308,000 floor; hub meta descriptions shortened
Oxnard ADU cost post published — an 800 sq ft detached ADU at $308,000 floor ($385/sq ft), Ventura County's coastal control case: standard 750 sq ft cliff in Municipal Code Sec. 15-183, valuation-based building permit schedule (FY 2026-27 Master Fee Schedule, Exhibit A, IX C1) that cannot be priced per square foot so the permit figure is excluded, school fee $4,136 on 800 sq ft ($5.17/sq ft split across Oxnard SD $3.41 K-8 and Oxnard Union HSD ~$1.76), proportional impact fees above 750 sq ft with unpublished base amounts excluded, pre-approved plans accepted from Ventura and San Diego County programs. Last verified 9 Oct 2026. Also: hub meta descriptions shortened to 160 characters or less (fee-index, compare, changes, fees hub, bid-scanner title, SB 1117 hub). No new fee rows in this run.
Oxnard
Published: 11 Nov 2026
Los Angeles: Building permit fees verified — Table 1-A, combined 165%, plan check 90% + surcharges
City of Los Angeles building permit fees verified — the first permit-fee rows for LA-CITY (3 verified rows → 13). Table 1-A (LAMC §91.113, Ord. 185,587): $100,001-$500,000 band $395.00 + $3.50 per $1,000 of TOTAL valuation, with the full 7-band table in the row notes; combined building-mechanical permit 165% of the Table 1-A fee (Table 1-A.1; ADUs use the combined permit per §91.107.2.2); plan check 90% of the permit fee (§91.107.3.1.1); energy-code increase 10% (Table 1-A footnote 2); Systems Development Surcharge 6% (§98.0418(a)); General Plan Maintenance Surcharge 7% (§98.0418(b)); Development Services Center Surcharge 3% (§98.0410, Ord. 184548 — temporary BuildLA rate, reverts to 2% when the $21.76M cost is recovered); Fire Hydrant Fee 0.22% of valuation at $50,000+ (§91.107.4.4); SMIP 0.013% residential, $0.50 minimum (PRC §2705(a); CA Geological Survey fee schedule); Building Standards fee $1 per $25,000, minimum $1 (HSC §18931.6(a); CBSC Bulletin 20-04). All read live November 11, 2026. Rates render on the fee page with amount “—”: LADBS determines project valuation and no confirmed $/sq ft ADU valuation basis exists, so no 800 sq ft total. Resolved in this batch: the General Plan surcharge is 7%, not 10% (the 10% figure is LAMC §19.16 Chapter I planning fees, not the §98.0418(b) building-permit surcharge); the LADBS full-cost fee proposal (CF 26-0163) is not yet adopted, so the codified Table 1-A amounts are current; the minimum permit fee is $180 (double the §98.0412(a) $90 minimum inspection fee), not $130 as secondary sources claim. leginfo was unreachable (bot check) for the two state statutes — rates corroborated by the CGS fee schedule, the CBSC bulletin, and CA Attorney General Opinion No. 09-903. LA-CITY now has 13 rows, all verified; verified rows sitewide 528 → 538.
City of Los Angeles
Published: 11 Nov 2026
Clovis: Neighborhood Park Deposit verified — $6,127 per unit for Street Area 4 (Loma Vista)
City of Clovis Neighborhood Park Deposit ($6,127 per unit, Street Area 4 — Loma Vista Specific Plan) verified in the Master Development Fee Schedule 2024-2025 (effective July 21, 2025, p.2; rates effective August 12, 2024), re-read live November 11, 2026 — no newer schedule published. The city ADU Informational Handout (8-16-23) states ADUs under 750 sq ft pay no impact fee and ADUs over 750 sq ft are charged proportionately to the primary dwelling, and Gov. Code §66311.5 governs the same rule, so the row is verified with dwelling-base proration (800 sq ft ADU at the 1,600 sq ft default primary: $3,063.50; $0 at 750 sq ft and under; SB 1117 2027 basis: $191.47). Area scope resolved from the city’s Street & Undergrounding Boundaries map (May 28, 2024; fee schedule p.7, in the June 10, 2024 City Council agenda packet, Item 15): Street Area 4 runs Locan Ave to McCall Ave, Bullard/Shaw Aves to the Gould Canal — the Loma Vista Specific Plan boundary — so the deposit and the Area 4 Major Street Fee apply to the same parcels and the row is tagged area “Area 4” (mutually exclusive with Areas 1–5). Clovis now has 22 rows (6 verified in this branch; the Major Street Area 1–5 verifications are a separate unmerged branch).
Clovis
Published: 11 Nov 2026
Clovis: Major Street Fees Areas 1-5 verified — $115-$11,908 per unit, prorated for ADUs over 750 sq ft
City of Clovis Major Street Fees, Areas 1-5 (SFR per unit: Area 1 $11,908, Area 2 $518, Area 3 $115, Area 4 $11,712, Area 5 $6,104) verified in the Master Development Fee Schedule 2024-2025 (effective July 21, 2025, pp.3-4), re-read live November 11, 2026 — no newer schedule published. Component sums (Outside Travel Lane + Center Travel Lane + Traffic Signals + Bridges) match the printed totals exactly in all five areas. The FY2023-24 AB 602 nexus sheets (Major Street fees, pp.16-19 + summary p.33) rate the fee per dwelling unit by trip generation, not dwelling size; the city ADU Informational Handout (8-16-23) proportional rule and Gov. Code §66311.5 govern the ADU charge, so the rows are verified with dwelling-base proration (800 sq ft ADU at the 1,600 sq ft default primary: Area 1 $5,954.00, Area 2 $259.00, Area 3 $57.50, Area 4 $5,856.00, Area 5 $3,052.00; $0 at 750 sq ft and under). The five areas are mutually exclusive area variants — a parcel pays one area’s fee only — so the fees page shows a range across areas. Clovis now has 22 rows (8 verified in this branch; the Library and Sanitation verifications are separate unmerged branches).
Clovis
Published: 11 Nov 2026
Clovis: Community Sanitation Fee verified — $552 per unit, prorated for ADUs over 750 sq ft
City of Clovis Community Sanitation Fee ($552 per unit, Single family lot) verified in the Master Development Fee Schedule 2024-2025 (effective July 21, 2025, p.2; rates effective August 12, 2024), re-read live November 11, 2026 — no newer schedule published. The FY2023-24 AB 602 nexus sheets (Community Sanitation Fee, p.28) rate the fee per dwelling unit (residential service is once a week per dwelling unit with no variation for dwelling size; a unit-based fee is a more direct connection to the service provided than a square-footage basis), and the city ADU Informational Handout (8-16-23) states ADUs under 750 sq ft pay no impact fee and ADUs over 750 sq ft are charged proportionately to the primary dwelling — so the row is verified with dwelling-base proration (800 sq ft ADU at the 1,600 sq ft default primary: $276.00; $0 at 750 sq ft and under). Clovis now has 22 rows (5 verified).
Clovis
Published: 11 Nov 2026
Clovis: Library Facilities Impact Fee verified — $766 per unit, prorated for ADUs over 750 sq ft
City of Clovis Library Facilities Impact Fee ($766 per unit, Single family lot) verified in the Master Development Fee Schedule 2024-2025 (effective July 21, 2025, p.2; rates effective August 12, 2024), re-read live November 11, 2026 — no newer schedule published. The FY2023-24 AB 602 nexus sheets (Library Fee, p.32) rate the fee per dwelling unit (a per-home basis is more appropriate than a square-footage basis; the fee captures Clovis's portion of the Fresno County Library fee for the sphere of influence), and the city ADU Informational Handout (8-16-23) states ADUs under 750 sq ft pay no impact fee and ADUs over 750 sq ft are charged proportionately to the primary dwelling — so the row is verified with dwelling-base proration (800 sq ft ADU at the 1,600 sq ft default primary: $383.00; $0 at 750 sq ft and under). The '***' marker on the Library line has no footnote definition in the schedule and does not affect the rate; revisit at the December 2026 DIF program review. Clovis now has 22 rows (4 verified).
Clovis
Published: 11 Nov 2026
Campbell $5.40 citation sweep: nine posts corrected to $5.38 / $4,304
Campbell $5.40 citation sweep (follow-on to the 10 November Campbell correction): the stale $5.40/sq ft combined rate, $4,320 on 800 sq ft, and $2,528 Pasadena-Campbell spread are corrected to $5.38, $4,304 and $2,512 in nine posts — five already published (school-fee explainer, 10-city ranking, JADU-vs-ADU-vs-garage comparison, LA County comparison, Pasadena post) and four future-dated before publication (California school-fee ranking, 20-city ranking, soft-costs ranking, SB 1117 checklist). In the school-fee ranking Campbell drops from a unique #28 into the $4,304 tier (now 17-28, twelve cities) and the 'only city to break the ceiling' claim is removed; the soft-costs ranking Campbell total moves $8,649 to $8,633. The San Diego County comparison published the same day gets a wording fix: the city-vs-Encinitas swing is $16,500 on the permit counter alone, not $17,400. No fee amounts changed; 691 items (520 verified) after the 26-branch verification merge in the same change.
Campbell · San Diego County
Published: 11 Nov 2026
Clovis: Park Acquisition and Development fee verified — $6,147 per unit, prorated for ADUs over 750 sq ft
City of Clovis Park Acquisition and Development Fee ($6,147 per unit, All Residential) verified in the Master Development Fee Schedule 2024-2025 (effective July 21, 2025, p.2; rates effective August 12, 2024), re-read live November 11, 2026 — no newer schedule published. The FY2023-24 AB 602 nexus sheets (p.28) rate the fee per dwelling unit for the entire sphere of influence, noting an average fee based on dwelling units is more empirical and accurate than a square-footage basis, and the city ADU Informational Handout (8-16-23) states ADUs under 750 sq ft pay no impact fee and ADUs over 750 sq ft are charged proportionately to the primary dwelling — so the row is verified with dwelling-base proration (800 sq ft ADU at the 1,600 sq ft default primary: $3,073.50; $0 at 750 sq ft and under). Clovis now has 22 rows (1 verified in this branch; Fire/Police verification is a separate unmerged branch).
Clovis
Published: 11 Nov 2026
Clovis: Fire and Police impact fees verified — $2,253 and $1,582 per unit, prorated for ADUs over 750 sq ft
City of Clovis Fire Department Fee ($2,253/unit) and Police Department Fee ($1,582/unit) verified in the Master Development Fee Schedule 2024-2025 (effective July 21, 2025, p.2; rates effective August 12, 2024), re-read live November 11, 2026 — no newer schedule published. Both are 'Growth Areas' per-unit rates; the FY2023-24 AB 602 nexus sheets rate them 'All Land Uses' per dwelling unit for facilities 'for the entire sphere of influence' ('All development induces a need for fire/police protection'), and the city ADU Informational Handout (8-16-23) states ADUs under 750 sq ft pay no impact fee and ADUs over 750 sq ft are charged proportionately to the primary dwelling — so the rows are verified with dwelling-base proration (800 sq ft ADU at the 1,600 sq ft default primary: Fire $1,126.50, Police $791.00; $0 at 750 sq ft and under). The 'Growth Areas' label has no map or definition in the schedule; applicability follows the nexus basis, with a revisit at the December 2026 DIF program review. Clovis now has 22 rows (2 verified).
Clovis
Published: 11 Nov 2026
Marin County: Miller Creek / San Rafael High school fee split $3.77 + $1.67 (to_verify - area-model blocker; combined total unresolved)
Marin County (unincorporated): Miller Creek / San Rafael High school fee split collected from the districts' own documents - Miller Creek School District share $3.77/sq ft residential (San Rafael City Schools Developer Fees page, 'Level One School Impact Fees Effective June 2026'; the live browser could not open that page, so the line was verified by independent text re-fetch) and San Rafael High School District share $1.67/sq ft (SRCS HSD 2026 Fee Justification Study, April 14, 2026, 30.95% of the $5.38 cap under an allocation agreement that expressly includes Miller Creek ESD; cross-confirmed on the SRCS page). New rows MARIN-COUNTY-NEW-24 (Miller Creek $3.77) and NEW-25 (SRHSD $1.67), both area 'Miller Creek SD / San Rafael HSD', are to_verify, not verified: FI-261 (San Rafael City Schools $5.38) has no area tag, so feeCalc would count all three school fees in the Miller Creek area; the verified flip needs an area-model decision (re-scope FI-261 or equivalent) by the daily routine. UNRESOLVED CAP TENSION, flagged not hidden: the two published shares sum to $3.77 + $1.67 = $5.44, above the $5.38 SAB Level I cap, and no source states a combined Miller Creek-area total - $5.44 is not a combined rate and no computed split or combined total is encoded (same no-inference rule as cycle337). Miller Creek SD's own page still shows the 2024 position (combined $5.17, Miller Creek $3.62, eff. May 11, 2024) and is not encoded; its 'March 12, 2024 study' link actually serves the April 12, 2022 study. The SRCS ESD 2026 study does not mention Miller Creek at all (it justifies only the $3.71 SRCS ESD share). Adoption resolution number/date not retrieved (both 2026 studies are future-tense; hearing April 28, 2026 to consider approving, SRCS districts only); effective_date null. 12/1 follow-up: Miller Creek's own 2026 study/resolution to resolve the combined total. Marin County now has 14 rows (12 verified) in this branch.
Marin County
Published: 11 Nov 2026
Marin County: Nicasio / Lagunitas / Bolinas-Stinson school fees $5.38/sq ft combined at cap (to_verify - area-model blocker)
Marin County (unincorporated): West Marin school developer fees confirmed at the $5.38/sq ft Level I cap, combined, from the districts' own documents - the TUHSD-issued RESIDENTIAL 2026-27 certification forms for Nicasio, Lagunitas, and Bolinas-Stinson, each stating a single combined line 'TOTAL SQ. FT. x $5.38' with no elementary/high-school split printed (800 sq ft = $4,304 in each area). Unlike the Sausalito and Ross Valley forms, which print a $2.436 + $1.614 = $4.05 split, these three forms charge the full cap as one line, so no split is encoded: the TUHSD 2026 study's 30% high school share ($1.614) would imply a $3.766 elementary share, but the Sausalito/Ross Valley forms prove the elementary share is not uniformly 70% - the split here is a 12/1 follow-up. New rows MARIN-COUNTY-NEW-21 (Nicasio), NEW-22 (Lagunitas), NEW-23 (Bolinas-Stinson), all area '<District> SD / Tamalpais Union HSD', are to_verify, not verified: FI-261 (San Rafael City Schools $5.38) has no area tag, so feeCalc would count both school fees in each new area; the verified flip needs an area-model decision (re-scope FI-261 or equivalent) by the daily routine. Adoption resolution number and date were not found (resolutions page lists only Resolution 25-01); the 2026-27 forms already show the new rate. Public hearing was May 5, 2026. Marin County now has 15 rows (12 verified) in this branch.
Marin County
Published: 11 Nov 2026
Marin County: Ross Valley / Tamalpais Union school fee split $4.05/sq ft confirmed (to_verify - area-model blocker)
Marin County (unincorporated): Ross Valley / Tamalpais Union school developer fee split confirmed at $4.05/sq ft combined from the district's own documents - the TUHSD-issued Ross Valley RESIDENTIAL 2026-27 certification form, which states $2.436 for Ross Valley School District and $1.614 for Tamalpais Union High School District, and TUHSD's 2026 Developer Fee Justification Study (March 2026; high school share is 30% of the statutory maximum, $1.61 of $5.38). The Sausalito Marin City 2026-27 form shows identical figures, confirming the TUHSD share is uniform across feeder districts. The combined $4.05 is below the $5.38 SAB Level I cap (the elementary share is below 70% of the cap; Ross Valley's own 2026 study is a 12/1 follow-up). New rows MARIN-COUNTY-NEW-19 (RVSD $2.436) and MARIN-COUNTY-NEW-20 (TUHSD $1.614), both area 'Ross Valley SD / Tamalpais Union HSD', are to_verify, not verified: FI-261 (San Rafael City Schools $5.38) has no area tag, so feeCalc would count both school fees in this area; the verified flip needs an area-model decision (re-scope FI-261 or equivalent) by the daily routine. Adoption resolution number and date were not found (resolutions page lists only Resolution 25-01); the 2026-27 forms already show the new rate. Public hearing was May 5, 2026. Marin County now has 14 rows (12 verified) in this branch.
Marin County
Published: 11 Nov 2026
Marin County: Sausalito-Marin City / Tamalpais Union school fee split $4.05/sq ft confirmed (to_verify - area-model blocker)
Marin County (unincorporated): Sausalito Marin City / Tamalpais Union school developer fee split confirmed at $4.05/sq ft combined from the district's own documents - TUHSD's 2026 Developer Fee Justification Study (March 2026; high school share is 30% of the statutory maximum, $1.61 of $5.38) and the district-issued 2026-27 residential certification forms, which state $2.436 for Sausalito Marin City School District and $1.614 for Tamalpais Union High School District. The Ross Valley 2026-27 form shows identical figures, confirming the TUHSD share is uniform across feeder districts. The combined $4.05 is below the $5.38 SAB Level I cap (the elementary share is below 70% of the cap; SMCSD's own 2026 study is a 12/1 follow-up). New rows MARIN-COUNTY-NEW-17 (SMCSD $2.436) and MARIN-COUNTY-NEW-18 (TUHSD $1.614), both area 'Sausalito Marin City SD / Tamalpais Union HSD', are to_verify, not verified: FI-261 (San Rafael City Schools $5.38) has no area tag, so feeCalc would count both school fees in this area; the verified flip needs an area-model decision (re-scope FI-261 or equivalent) by the daily routine. Adoption resolution number and date were not found (resolutions page lists only Resolution 25-01); the 2026-27 forms already show the new rate. Public hearing was May 5, 2026. Marin County now has 14 rows (12 verified) in this branch.
Marin County
Published: 11 Nov 2026
Marin County: Novato USD school fee $5.17/sq ft confirmed (to_verify - area-model blocker)
Marin County (unincorporated): Novato Unified School District residential developer fee confirmed at $5.17/sq ft from the district's own page (read live 2026-11-11; effective July 22, 2024) and its May 21, 2024 justification study, which justifies the full $5.17 and states ADUs are levied. The district has NOT adopted the 2026 $5.38 SAB maximum - $5.17 is the current rate (800 sq ft = $4,136), closing 12/1 target #3 (matrix-batch18). New row MARIN-COUNTY-NEW-16 (area 'Novato USD') is to_verify, not verified: FI-261 (San Rafael City Schools $5.38) has no area tag, so feeCalc would count both school fees in the Novato USD area; the verified flip needs an area-model decision (re-scope FI-261 or equivalent) by the daily routine. Resolution number and adoption date for the 2024 fee were not found on the district page or in the study. Marin County now has 13 rows (12 verified) in this branch.
Marin County
Published: 11 Nov 2026
Santa Clara County: Cupertino Union ESD $3.23/sq ft and Fremont Union HSD $2.15/sq ft verified for the Loyola side (combined $5.38 cap)
Santa Clara County (unincorporated): Cupertino Union ESD developer fee verified at $3.23/sq ft residential (district page: effective May 13, 2026; January 2026 executive summary: 60% share of the $5.38 SAB Level I maximum, $3.10 to $3.23) and Fremont Union HSD verified at $2.15/sq ft for the Cupertino attendance area (Resolution #2526-12, effective May 9, 2026; 40% share). New rows SANTA-CLARA-COUNTY-NEW-37 (CUSD $3.23) and NEW-38 (FUHSD $2.15) cover Loyola CDP's 4.41% Cupertino Union / Fremont Union side; combined $3.23 + $2.15 = $5.38, the full cap, so the Loyola area total at 800 sq ft is $4,304 - the same as the 95.59% Los Altos side's FI-386 combined figure. Adoption details not yet retrieved for either district (CUSD resolution number/date: board portal blocked by Imperva; FUHSD adoption date: archived portal unreachable) - follow-up is each district's FY2025-26 annual developer fee report (due Dec 27, 2026). Santa Clara County (unincorporated) now has 16 rows (7 verified) in this branch.
Santa Clara County
Published: 11 Nov 2026
Santa Clara County: Gilroy USD $5.38/sq ft verified for the San Martin / Sargent side (effective May 18, 2026)
Santa Clara County (unincorporated): Gilroy Unified School District developer fee verified at $5.38/sq ft residential for the San Martin (29%) / Sargent side (district's own Development Impact Fee Certification of Compliance form, Updated May 2026: 'Residential/Residential Addition - Square Footage x $5.38'; the form itself prints 'Board Approval: March 19, 2026' and 'Effective Date of Increase: May 18, 2026' - exactly 60 days after adoption, Gov. Code 66017. The February 2026 justification study (SchoolWorks) corroborates: prior rate $5.17, new $5.38, and a demonstrated need of $8.71/sq ft. Adoption was Resolution No. 2526-15, unanimous 7-0, per the district's official March 19, 2026 board-meeting video; the resolution text itself was not retrieved - the district's Simbli agenda host is blocked by Imperva Error 16. The March 2022 rate of $4.79 is superseded. New row SANTA-CLARA-COUNTY-NEW-36 (GUSD $5.38, verified, confidence A) covers the 'Gilroy USD' area; Gilroy USD is a unified district, so this single row is the full SAB Level I cap and the area total at 800 sq ft is $4,304. Sargent is Gilroy USD and San Martin is 28.66% Gilroy USD per the cycle324 boundary map; the other 71.34% of San Martin is Morgan Hill USD (inquiry-only). Santa Clara County (unincorporated) now has 15 rows (6 verified) in this branch.
Santa Clara County
Published: 11 Nov 2026
Santa Clara County: Mountain View Whisman $3.59/sq ft verified for the Moffett Field side (effective Nov 2, 2026); MVLA $1.79 re-scoped to the same area
Santa Clara County (unincorporated): Mountain View Whisman School District developer fee verified at $3.59/sq ft residential for the Moffett Field side (district's own 'Pay Developer Fees' page, read live 2026-11-11: board voted September 3, 2026 to approve the increase, effective November 2, 2026 - exactly 60 days after adoption; $3.59 is the 66.67% feeder share of the $5.38 SAB Level I maximum, rounded to the cent, matching the district's published 2024 convention of $3.45 = 2/3 of $5.17 rounded). New rows SANTA-CLARA-COUNTY-NEW-34 (MVWSD $3.59) and NEW-35 (MVLA $1.79, re-scoped from cycle330 NEW-33) cover Moffett Field (Mountain View Whisman + Mountain View-Los Altos Union HSD, per the cycle324 boundary map). Combined shares $5.38 - exactly the cap, so the area total at 800 sq ft is $4,304 ($2,872 + $1,432), identical to FI-386's combined figure for Los Altos Hills. Confidence B on NEW-34: the resolution number and the 2026 justification study text were not retrieved (only the 2022 study and a 2023 proposal surfaced); follow-up is the FY2025-26 annual developer fee report (due by December 27, 2026) - 12/1 re-check queue. Moffett Field is a federal installation (NASA Ames) with minimal residential development; the rows complete the county district map. Santa Clara County now has 649 rows (501 verified) in this branch.
Santa Clara County
Published: 10 Nov 2026
Santa Clara County: MVLA $1.79/sq ft verified for the Loyola side; Los Altos ESD $3.58 held unverified (June 1 adoption confirmed, exact figure not retrieved - truncation convention documented)
Santa Clara County (unincorporated): Mountain View-Los Altos Union HSD developer fee verified at $1.79/sq ft residential for the Loyola side (Level I study, July 31, 2026: $1.79 is 33.33% of the $5.38 SAB Level I maximum; Resolution No. 26/27-6 certified September 14, 2026, 5-0, effective November 13, 2026). New rows SANTA-CLARA-COUNTY-NEW-32 (Los Altos School District $3.58) and NEW-33 (MVLA $1.79) cover Loyola CDP's 95.59% Los Altos ESD / MVLA side. The elementary $3.58 stays UNVERIFIED: the district's board unanimously approved Resolution No. 25/26-17 on June 1, 2026, but the resolution text and the 2026 justification study stating the exact figure could not be retrieved - $3.58 is the district's own truncation convention (its FY2024-25 rate $3.44 is 2/3 of $5.17 truncated to the cent; the other feeder rounds to $3.45) applied to 2/3 of $5.38, and $3.59 remains the rounding alternative. The two published shares sum to $5.37, $0.01/sq ft under the cap, so the Loyola area total at 800 sq ft is $4,296 versus the $4,304 combined figure in FI-386 (Los Altos Hills). Follow-up is LASD's FY2025-26 annual developer fee report (due by December 27, 2026) or the 2026 study / resolution text. Santa Clara County now has 643 rows (494 verified) in this branch.
Santa Clara County
Published: 10 Nov 2026
Santa Clara County: LGSUHSD $1.66/sq ft verified for the Loma Prieta side of Lexington Hills; Loma Prieta $3.72 held unverified (April 22 hearing held, adoption unconfirmed - board portal blocked)
Santa Clara County (unincorporated): Los Gatos-Saratoga Union HSD developer fee verified at $1.66/sq ft residential for the Loma Prieta side of Lexington Hills (district fee page: $1.66 as of June 15, 2026; Resolution No. 25/26-13 adopted April 16, 2026, AYES 5 / NOES 0, effective June 15, 2026; February 2026 justification study: 30.77% share of the $5.38 SAB Level I maximum). New rows SANTA-CLARA-COUNTY-NEW-30 (Loma Prieta Joint Union ESD $3.72) and NEW-31 (LGSUHSD $1.66) close the cycle324 boundary gap: Lexington Hills CDP is now mapped on both sides (Los Gatos Union 81% in the previous cycle, Loma Prieta 19% here). The elementary $3.72 is agreement-implied only (9/13 of the $5.38 cap under the October 2000 fee-sharing agreement) and stays UNVERIFIED: the district held a public hearing on April 22, 2026 on adopting a justification study and increasing the fee, but the adoption outcome could not be confirmed - its Simbli board portal is bot-blocked (Imperva Error 16 on every load, including a fresh browser) and no minutes, study or resolution surfaced in search. The district's own FY2023-24 disclosure shows it has not increased its fee since 2012 (last confirmed $2.30/sq ft), so if it did not adopt, the area total is $3.96, not $5.38. Follow-up is the district's FY2025-26 annual developer fee report (due by December 27, 2026) or the April 22, 2026 minutes via an unblocked network. Santa Clara County now has 643 rows (494 verified) in this branch.
Santa Clara County
Published: 10 Nov 2026
Santa Clara County: Los Gatos-Saratoga HSD $1.66/sq ft verified for Lexington Hills / Redwood Estates; Los Gatos Union $3.72 held unverified (no 2026 adoption found)
Santa Clara County (unincorporated): Los Gatos-Saratoga Union HSD developer fee verified at $1.66/sq ft residential for the Lexington Hills / Redwood Estates area (district fee page: $1.66 as of June 15, 2026; Resolution No. 25/26-13 adopted April 16, 2026, AYES 5 / NOES 0, effective June 15, 2026; February 2026 justification study: 30.77% share of the $5.38 SAB Level I maximum). New rows SANTA-CLARA-COUNTY-NEW-28 (Los Gatos Union ESD $3.72) and NEW-29 (LGSUHSD $1.66) cover the Los Gatos Union side of Lexington Hills CDP (81% per the cycle324 CDE/Census boundary map; the other 19% is Loma Prieta, still unverified) and Redwood Estates. The elementary $3.72 is agreement-implied only (69.23% of the $5.38 cap) and stays UNVERIFIED: no Los Gatos Union adoption was found in any January-June 2026 board meeting (nine meetings checked, zero developer-fee items), the district posts no developer-fee page or 2026 study, and its Simbli agenda portal is bot-blocked - and the Loma Prieta record shows the split can drift when a feeder does not adopt, so the rate would be $3.58 if LGUSD stayed at the 2024 level. Follow-up is the district's FY2025-26 annual developer fee report (due by December 27, 2026) or later board minutes. Santa Clara County now has 643 rows (494 verified) in this branch.
Santa Clara County
Published: 10 Nov 2026
Santa Clara County: Luther Burbank ESD school fee verified at $3.77/sq ft - Burbank split now fully covered
Santa Clara County (unincorporated): Luther Burbank Elementary School District developer fee verified at $3.77/sq ft residential (Campbell Union HSD School Facilities Fee Justification Report, May 7, 2026, Table 8: LBSD feeder share $3.77 - 70% of the $5.38 SAB Level I maximum, shared with Campbell Union HSD at 30% / $1.61). New verified rows SANTA-CLARA-COUNTY-NEW-26 (Luther Burbank ESD $3.77) and NEW-27 (CUHSD $1.61, Luther Burbank-area pairing - same district, rate and adoption as NEW-11) cover the Luther Burbank-ESD minority of Burbank CDP (47.37% per the cycle324 CDE/Census boundary map); with cycle326's Campbell Union rows (NEW-24/25, 52.42%), the Burbank split is now fully covered. Discrepancy noted: LBSD's own Resolution No. 08-09-22-01 (adopted August 9, 2022) levied $3.832 - 80% of the then $4.79 maximum - so the sharing split evidently changed from 80/20 to 70/30; the 2022 resolution is the old rate under the old cap and does not contradict $3.77 for 2026 ($3.77 + $1.61 = $5.38 exactly). Limitation: LBSD's own 2026 adoption was not separately sighted - the district's Simbli agenda site is Imperva-blocked and lbsdk8.org posts no 2026 adoption document - so confidence is B and effective_date is the year-only '2026'. Numbering skips to NEW-26/27 because unmerged branches already claim NEW-12..25 for the county. Santa Clara County now has 643 rows (495 verified) in this branch.
Santa Clara County
Published: 10 Nov 2026
Santa Clara County: Union Elementary school fee verified at $3.77/sq ft - Cambrian Park majority split now covered
Santa Clara County (unincorporated): Union Elementary School District developer fee verified at $3.77/sq ft residential (district Developer Fees page, unionsd.org, effective May 8, 2026; Resolution No. 25-26-11; Level 1 Developer Fee Study). Union ESD collects 70% of the developer fee and Campbell Union HSD 30% ($3.77 + $1.61 = $5.38 SAB cap). New verified rows SANTA-CLARA-COUNTY-NEW-22 (Union ESD $3.77) and NEW-23 (CUHSD $1.61, Union-area pairing - same district, rate and adoption as NEW-11) cover the Union-ESD majority of Cambrian Park CDP (66.22% per the cycle324 CDE/Census boundary map); the Cambrian SD minority stays on NEW-10. Numbering skips to NEW-22/23 because unmerged branches already claim NEW-12..21 for the county. Limitation: the study and resolution PDFs are Google Drive embeds that returned 401 in the verification browser - rate, split and effective date verified from the district page text, not from inside the PDFs. Santa Clara County now has 643 rows (495 verified).
Santa Clara County
Published: 10 Nov 2026
Santa Clara County: school-district boundary map completed - Burbank is not San Jose USD territory (52% Campbell Union / 47% Luther Burbank); Cambrian Park is 66% Union Elementary
Santa Clara County (unincorporated): school-district boundary map completed from CDE California School District Areas 2025-26 polygons intersected with Census 2024 CDP polygons (11 unincorporated communities mapped). Two corrections recorded as row notes, no amounts changed: (1) Burbank CDP is 52% Campbell Union ESD + 47% Luther Burbank ESD with Campbell Union HSD as the high-school district, and only 0.21% San Jose USD - the FI-230 San Jose USD $5.38 row does not cover Burbank, correcting cycle289 and cycle321 assumptions; Burbank school-fee rows still need district-rate verification. (2) Cambrian Park CDP is 66% Union Elementary + 34% Cambrian SD (both feed Campbell Union HSD) - the verified Cambrian SD $3.77 + CUHSD $1.61 rows cover only the Cambrian third; the Union ESD majority has no row yet (rate unverified). Also mapped: Alum Rock (Alum Rock Union ESD + East Side Union HSD, cycle319 rows cover the dominant split), East Foothills (same), Lexington Hills (Los Gatos Union ESD 81% / Loma Prieta 19% + Los Gatos-Saratoga HSD), Loyola (Los Altos ESD + Mountain View-Los Altos HSD), San Martin (Morgan Hill USD 71% / Gilroy USD 29%), Coyote (Morgan Hill USD), Sargent (Gilroy USD), Moffett Field (Mountain View Whisman + MVLA HSD), Redwood Estates (Los Gatos Union ESD + LG-Saratoga HSD). New-district county rates are all unverified - daily-routine follow-up.
Santa Clara County
Published: 10 Nov 2026
City of Los Angeles: first verified rows — LAUSD school fee $5.38, park and linkage fees $0
City of Los Angeles: first verified fee rows encoded (3). LAUSD school developer fee $5.38/sq ft, effective August 11, 2026 (Board approved June 12, 2026) — ADUs under 500 sq ft are $0 per Gov. Code §66311.5(c)(3); 800 sq ft = $4,304. Park fee $0 and Affordable Housing Linkage Fee $0 for ADUs/JADUs at any size (ZA Memo No. 143, Dec 30, 2024; LAMC 12.33 and 19.18). Building permit fee (LAMC Table 1-A current dollar bands), One-Stop surcharge rate (2% vs 3%), and electrical/mechanical/plumbing sub-permit rates remain unverified and are not encoded; plan-check (90% of permit fee, LAMC §91.107.3.1.1) and Systems Development Surcharge (6%, LAMC §98.0418(a)) are verified as rates but need a fee-calculator model for percent-of-permit-fee before encoding.
Los Angeles
Published: 10 Nov 2026
Santa Clara County: no county development impact fee on ADUs — confirmed in certified Housing Element (Ch. 2 §2.06o)
Santa Clara County (unincorporated) levies no development impact fee of its own on private residential development: the certified 2023-2031 Housing Element, Chapter 2 §2.06o (pp. 149-150; adopted by Board Resolution BOS-2025-7 on January 28, 2025, HCD-certified February 5, 2025), states "The County does not impose development impact fees of its own upon private residential development… No other impact fees are levied upon private single-family residential development in the unincorporated area." School district fees are collected separately when a building permit is processed, and certain ADUs are exempt from that fee under state law. Recorded as a verified $0 impact row (SANTA-CLARA-COUNTY-NEW-21, following the FI-149 San Bernardino County precedent). Corroborated by the County Building Fee Schedule FY2026-27 (effective July 18, 2026), which contains no impact-fee line items. Zoning Ordinance §4.10.015 was also restated from the current code (Municode, version October 26, 2026): it contains no fee or 750 sq ft provision — subsection A defers to Government Code §§65852.2/65852.22 with a void-if-conflict clause (Ord. NS-1200.383, January 24, 2023) — so the 750 sq ft impact-fee exemption rests on state law (§66311.5), not on a county restatement. Correction: the earlier queue label "Housing Element Ch. 4" was wrong — the fee analysis is Chapter 2; Chapter 4 is programs. Santa Clara County now has 13 rows (4 verified).
Santa Clara County
Published: 10 Nov 2026
Santa Clara County: Burbank sewer connection fees + DEH septic clearance recorded — $3,200 per dwelling unit + $845 OWTS review (to verify)
Santa Clara County (unincorporated): the Burbank Sanitary District Operations Code (adopted by Ordinance No. 65, July 2, 2019, Section 7101) sets sewer connection permit fees for the unincorporated Burbank pocket — a $3,200 connection charge per dwelling unit, a $440 sewer clean-out permit fee (inspection included), a $300 plan check fee, and a $200 lateral inspection fee. Recorded as to_verify with no area tag: the district serves only the Burbank pocket, and the area model cannot express school-district-by-sewer-provider combinations (Burbank parcels are in San Jose Unified), so a verified flip awaits an area-model decision. The district's annual sewer service charge is recurring, not a one-time project cost, and is not encoded. Also investigated this cycle and not encoded: San Martin County Water District has no published connection-fee schedule (no website; regulations by request only); the South County Regional Wastewater Authority levies no residential connection charge (treatment JPA of Gilroy and Morgan Hill — connection charges are member-city level, per the City of Gilroy fee schedule effective July 1, 2026); the County DEH OWTS clearance fee was then read from the adopted schedule via text fetch (the live-browser read was blocked by a Cloudflare check): LU17 LUPC Review for a residential accessory structure is $845 — the clearance review for a detached ADU on an existing septic/OWTS (Land Use fees effective January 15, 2026, BOS-2025-131; March 1, 2026 consolidated schedule). Attached-addition alternatives (LU16 $986 at 500 sq ft or less; LU15 $1,126 over 500 sq ft) and conditional OWTS items (LU12 upgrade design review $1,126; LU14 new-construction design review $2,253; LU22 new OWTS construction permit $3,014; WP03 individual well-water clearance $1,690) were verified in the same schedule but are not encoded — one clearance path applies per ADU.
Santa Clara County
Published: 10 Nov 2026
Santa Clara County: Fire Marshal review fee recorded — $2,567.21 + $35.35 per $10,000 over $99,000 (to verify)
Santa Clara County (unincorporated): the County Fire Marshal's Office fee schedule FY 2026-2027 (effective July 18, 2026) adds a Fire, Life, and Safety Review charged on project valuation — the $99,001–$490,000 band is $2,567.21 for the first $99,000 plus $35.35 per additional $10,000 ($3,489.85 at a $360,000 valuation). Recorded as to_verify: the county's construction-valuation basis is still unconfirmed, so the calculator skips it like the other valuation-based county rows. The South County Fire Protection Mitigation Fee (former South Santa Clara County Fire District, Service Zone 4, established 2005) was investigated but its residential rate could not be verified — the county's fee-review page is bot-blocked and the agenda system timed out — so it is not encoded; the 2015 modification (Resolution BOS-2015-137, effective December 7, 2015) and FY 2024 collections of $138,223 are on file for the December re-check.
Santa Clara County
Published: 10 Nov 2026
Santa Clara County: East Foothills school fees verified — Alum Rock $3.23 + East Side Union $1.36 ($4.59 combined)
Santa Clara County (unincorporated): the East Foothills school-fee split is now verified — Alum Rock Union ESD adopted Resolution No. 88-25/26 on May 28, 2026 (4-1 vote), raising its residential share to $3.23 per square foot (60% of the $5.38 SAB maximum, effective July 27, 2026), and East Side Union High School District still posts $1.36 per square foot (2020 adoption; its June 2026 agendas contain no fee increase). Combined, an East Foothills parcel pays $4.59 per square foot ($3,672 on 800 sq ft) — below the $5.38 cap that the Cambrian and San José USD areas both hit, so the county fee page now shows a range across areas. The 2026 Alum Rock study states a 60%/40% split, replacing the 33.33%/66.66% split in the 2020 East Side Union study; if East Side Union adopts, its share would be $2.15 — not encoded until it does.
Santa Clara County
Published: 10 Nov 2026
Monterey County: Monterey One Water sewer capacity charge $6,093.55 per dwelling (FY 2024-25, latest published)
Monterey County (unincorporated): Monterey One Water's residential sewer capacity charge is $6,093.55 per dwelling for Fiscal Year 2024-25 — the latest figure the agency has published, confirmed in both its Residential Capacity Charges page and its ordinance fee listing (FY 2023-24 was $6,056.15, +$37.40). The charge is incurred when a property connects to the regional sewer system or adds a dwelling, so it applies to ADUs on the Monterey One Water system at any size; a Sewer Connection Permit is also required. The Fiscal Year 2025-26 figure has not been published by the agency (the charge adjusts each July 1 by the December Construction Cost Index for San Francisco), so the row encodes the last published figure and stays to_verify. It carries no area tag because the agency serves only part of unincorporated Monterey County — other parcels are on septic or another sewer provider — and the site's area model cannot yet show a sub-area sewer charge without a false standalone schedule.
Monterey County
Published: 10 Nov 2026
Monterey County: Carmel Valley traffic impact fee (CVTIP) 2nd-unit bases $18,640 / $9,320 by area (2025-2026 schedule)
Monterey County (unincorporated): the Carmel Valley Traffic Impact Program (CVTIP) fee schedule for 2025-2026 (effective July 1, 2025-June 30, 2026, Board Resolution 95-410, adopted September 12, 1995; August 2025 ENR index 15285.78) lists the 2nd Unit/Apartment fee on existing lots of record at $18,640 per unit in the CVMP area and $9,320 in the Expanded area. The fee applies only in the Carmel Valley Planning Area. The program charges a flat per-unit fee; state law supplies the ADU rule (ADUs of 750 sq ft or less exempt; larger ADUs charged in proportion to the primary dwelling). The rows stay to_verify because Carmel Valley sits inside the Carmel USD school area and the site's area model cannot yet show a sub-area fee without rendering a false standalone schedule. New-lot amounts ($37,280 / $18,640) are recorded in the source note, not encoded, so the two lot classes are never double-counted. This closes the CVTIP item left open in the countywide traffic-fee pass; Monterey One Water's capacity charge is the next Monterey residual.
Monterey County
Published: 10 Nov 2026
Monterey County: county traffic impact fee confirmed as collected — secondary-unit bases $1,206 / $407 / $828 / $853 by zone (2014 schedule)
Monterey County (unincorporated): the county's own local traffic impact fee is confirmed as a collected program — the Board's adopted CIP (Resolution RES 19-078, June 18, 2019) states the countywide traffic impact fee is one of two traffic impact fees collected by the County, and TAMC audits confirm it continues to be collected. The published schedule is the 2014 Kimley-Horn nexus study Table 7, still posted by the County: the secondary-unit (ADU) line is $1,206 per unit in North County, $407 in Peninsula-South Coast, $828 in Greater Salinas, and $853 in Salinas Valley-South County (ITE 251, 3.68 trips). The 2014 study has no ADU exemption or proportionality rule — state law supplies it (ADUs of 750 sq ft or less exempt; larger ADUs charged in proportion to the primary dwelling). Two gaps keep the rows as to_verify: the 2014 figures are the published base but the annually-adjusted current amounts are not posted anywhere, and the resolution that adopted the program was not located (the study calls it 'proposed for adoption'; collection is documented from 2019). This closes the matrix-batch23 12/1 target #5 for the countywide fee; the separate Carmel Valley (CVTIP) 2nd-unit fee, current for 2025-2026, remains a later item.
Monterey County
Published: 11 Nov 2026
City of Irvine: first verified rows — school fees $5.38 in three districts, slurry seal $0.04
City of Irvine: first verified fee rows encoded (4). School developer fees $5.38/sq ft in all three verified districts — Irvine USD (Board Res. No. 25-26-36, effective June 22, 2026), Tustin USD (district current-rates page; adoption paperwork not found), Saddleback Valley USD (via City of Laguna Woods FY 2026-27 fee sheet; SVUSD Res. No. 15:25-26 adopted March 5, 2026, effective date not found) — 800 sq ft = $4,304 in each area. Santa Ana USD (Irvine Business Complex / Airport Area) remains unverified (2026 study link 404s) and is not encoded. Slurry seal $0.04/sq ft, max $65/unit (Schedule IV item 2, IMC §6-3-320). Verified but NOT encoded: citywide development impact fee $5.34/sq ft residential (Res. 25-78, Focus Area 1 only, ADUs of 750+ sq ft pro-rated) — the single-dimension area model cannot combine a Focus-Area-1 fee with the school-district areas; building permit/plan-check/inspection per-sq-ft rates (Schedule II §3 $0.68/$0.56, §7 $0.86/$1.33, issuance $73.08) — the schedule never names ADU, so the ADU category mapping is unconfirmed; Systems Development Charge 1% of valuation (needs ICC valuation, no model); planning ADU case $217.64/hr with $1,500 deposit (a deposit, not a fixed fee); TCA fees (ADU applicability unknown); park fee (subdivision-only, no per-ADU rate). City Form 42-97 (rev. 02/25) lists ADUs of 749 sq ft or less as school-fee-exempt, conflicting with the 500 sq ft state threshold encoded here — flagged for re-verification.
Irvine
Published: 10 Nov 2026
Santa Clara County: Campbell Union ESD school fee verified at $3.77/sq ft - Burbank majority split now covered
Santa Clara County (unincorporated): Campbell Union Elementary School District developer fee verified at $3.77/sq ft residential (district School Facilities Fee Justification Report, Mar 17, 2026, read in full; 70% of the $5.38 SAB Level I maximum shared with Campbell Union HSD). New verified rows SANTA-CLARA-COUNTY-NEW-24 (Campbell Union ESD $3.77) and NEW-25 (CUHSD $1.61, Campbell Union-area pairing - same district, rate and adoption as NEW-11) cover the Campbell Union-ESD majority of Burbank CDP (52.42% per the cycle324 CDE/Census boundary map); the Luther Burbank ESD minority (47.37%) is a separate follow-up. Numbering skips to NEW-24/25 because unmerged branches already claim NEW-12..23 for the county. Discrepancy noted: the district webpage lists residential at $3.79/sq ft, $0.02 above the study; the study governs (its other rates match the page exactly, and $3.79 + $1.61 would exceed the $5.38 cap). Limitation: the board adoption resolution for the 2026 study was not separately sighted, so confidence is B and effective_date is the year-only '2026'; the 10-15-2026 annual Developer Fee Report is the follow-up corroboration. The same verification also corrects the City of Campbell's FI-294 (Campbell Union SD K-8) from $3.79 to $3.77 and FI-295's note ($5.40 → $5.38 combined cap total) — CUHSD's May 7, 2026 report Table 8 independently lists the feeder-district share as $3.77. The Campbell posts are corrected in the same change ($5.40 → $5.38 combined, $4,320 → $4,304; the gap post $2,528 → $2,512) and logged in /corrections/. Santa Clara County now has 14 rows (5 verified).
Santa Clara County
Published: 10 Nov 2026
Hayward FY2027: park impact fee $3,812 → $3,379; ADU sewer connection $5,295 → $5,825
Hayward ADU fees re-verified in the Adopted Master Fee Schedule FY2026-27 (effective July 1, 2026, read live November 10): the park impact fee for ADUs of 750+ sq ft falls from $3,812 to $3,379 (Park Impact Fee – Residential, item 43a; the whole table moved down — studio $3,789, 1-bedroom $5,931, 2-bedroom $10,699, 3-bedroom $18,685, 4+ bedroom $25,991), and the ADU sewer connection charge rises from $5,295 to $5,825 per unit (September 1, 2026 column). The same schedule lists an ADU housing review fee of $158 (1–4 units $474, 5+ units $790) — confirmed in the document, not yet encoded as a fee row. The homepage 750 sq ft cliff example is corrected to $3,379. Hayward now has 3 rows (3 verified).
Hayward
Published: 10 Nov 2026
Source URLs http→https for Laguna Beach and Paramount school fees; Chula Vista leaves the homepage chart
Source-URL correction, no fee amounts changed: FI-308 (Laguna Beach USD school fee) and FI-433 (Paramount USD school fee) source URLs move from http:// to https:// — the plain-http documents time out while the https versions load (Paramount via a 301 redirect). The homepage school-fee chart now excludes Chula Vista: its only verified school row is FI-269, the Sweetwater Union HSD share ($3.01/sq ft, grades 7-12), with the Chula Vista Elementary share unverified, so the $2,408 shown was a high-school portion only. The cheapest five are now Laguna Beach $1,640, Pasadena $1,792, Sierra Madre $1,792, Paramount $2,376 and Simi Valley $2,560; the headline spread ($1,640 → $9,968, 6.1×) is unchanged. The Fee Index 'Districts at the ceiling' note drops the stale 'Six joined the ceiling club in the last three batches alone' line and now states 38 districts charge the $5.38 Level I cap, up from 21 at the Q3 launch. No fee items added or changed.
Laguna Beach · Paramount · Chula Vista
Published: 10 Nov 2026
Nipomo CSD verification-of-service letter $389 verified (Nipomo area)
San Luis Obispo County (unincorporated): the Nipomo Community Services District verification-of-service letter ($389, 2025-26 Miscellaneous Fee Schedule Res. 2023-1681, Code Sec. 2.04.070(A)) is verified — the district's own form lists 'New Accessory Dwelling Unit (ADU)' as a service type, and the schedule was re-fetched live November 10 (same 77,285-byte PDF, $389 unchanged; water lateral inspection $430 and sewer lateral inspection $281 also unchanged). The letter is area-tagged 'Nipomo' so it enters only the Nipomo area schedule, never the county-wide total; the same tag is added to the district's other four rows (capacity $0 verified, water lateral $430, sewer lateral $281 and 1-inch meter $1,013, all still unverified as conditional). 'Nipomo' (Nipomo CSD) is a different service area from the county's 'Nipomo (CSA 1)' wastewater row — a parcel pays one provider's rows, never both. This also corrects the row's code citation from 2.04.050(A) to 2.04.070(A). The county now has 43 rows (24 verified).
San Luis Obispo County
Published: 10 Nov 2026
Lakewood school fees split into exclusive areas: Long Beach USD $5.38, Paramount USD $2.97 (a parcel pays one, never both)
Lakewood's two verified school-fee rows were summed into a single $6,680 figure ($8.35/sq ft) on the homepage chart, the /fees/lakewood/ page and the calculator — but Long Beach USD and Paramount USD are both unified (K-12) districts, so a parcel pays one district's fee, never both. The rows now carry area tags (Long Beach USD, Paramount USD), following the Carlsbad pattern (FI-534–537) and the Vacaville precedent. Verified school fee for an 800 sq ft ADU is now $4,304 in the Long Beach USD area and $2,376 in the Paramount USD area; the /fees/lakewood/ verified total is now $2,680–$4,608 across areas (the summed stack was $6,985). Bellflower USD and ABC Unified also serve parts of Lakewood (Bellflower USD via 211LA and the district's own profile; ABC USD east of the San Gabriel River per the district's 2019 bond disclosure and 2025-26 district profile), but no current developer-fee rate was found for either — Bellflower's official fee page publishes no rate and its application PDF could not be retrieved; the last documented Bellflower rate is $3.79/sq ft (FY2020-21 annual report, adopted July 2018). No rows added for them; the Lakewood post already states the four-district split in prose.
Lakewood
Published: 10 Nov 2026
Cypress Fire Protection District fire fee rate $0.53/sq ft confirmed; row held for area-model decision (Monterey County)
Monterey County (unincorporated): the Cypress Fire Protection District fire capital facilities fee rate ($0.53/sq ft) and its adoption are now confirmed — Resolution No. 2026-01, adopted March 26, 2026 (Motion 03-2026-08, 4 ayes / 1 absent, per the district's own minutes in the May 28, 2026 packet); both the agenda packet and the minutes were fetched live November 10. The resolution asks the County to continue collecting the fee under Monterey County Ordinance No. 3602. The resolution literally says ".53 cents per square foot"; it is read as $0.53/sq ft, consistent with the fee history and the neighbouring Monterey County Regional district's $0.55/sq ft residential rate under the same ordinance. The under-750 sq ft exemption comes from state law (Gov. Code Sec. 66311.5), so an 800 sq ft ADU in the district is $424. The row itself stays unverified for now, on purpose: a trial verified flip was built and reverted in the same session because the single-dimension area model would render the fire fee as a standalone $424 schedule and a $424-$4,136 county range, which is false for any real parcel (a Cypress parcel also pays its school-district fee). The merge needs to decide how the overlapping fire-district and school-district areas combine before this row is promoted. Monterey County now has 4 rows (3 verified).
Monterey County
Published: 10 Nov 2026
TAMC regional fee confirmed for all four Monterey County zones; rows held for area-model decision
Monterey County (unincorporated): the Transportation Agency for Monterey County (TAMC) Regional Development Impact Fee is now confirmed for all four benefit zones — North County $4,925, Greater Salinas $4,128, Peninsula-South Coast $5,029 and South County $2,415 per single-family home (countywide average $4,135), from TAMC's August 26, 2026 update presentation, fetched live November 10. The ADU rule is confirmed as part of the ADOPTED program, not just the proposed update: TAMC's own staff report to the August 26 board meeting states that in the 2018 update TAMC implemented an ADU discount under which ADUs over 750 sq ft are charged only to the proportionate size of the primary home while ADUs under 750 sq ft are waived from the regional fee — the same rule the presentation shows with a worked example (850 sq ft ADU on a 2,500 sq ft primary = 34% of the home's fee). The 2026 update maximums (up to $31,199 per single-family home) are still proposed, not adopted: the board gave direction only on August 26, the September 23 meeting had no RDIF items, and no RDIF item is on the December 2 draft agenda. At the 1,600 sq ft default primary, an 800 sq ft ADU pays half the zone base ($2,463 / $2,064 / $2,515 / $1,208). The four rows are recorded as unverified for now, on purpose: the four benefit zones overlap the county's three verified school-district areas, and the single-dimension area model would render each zone as a standalone schedule missing the school fee, so the merge needs to decide how the overlapping areas combine before these rows are promoted. The zone area tags are deliberately withheld from the rows for the same reason — the area list is built from unverified rows too, so setting them would print four $0 phantom schedules on the fee page; the zone is recorded in each row's name and notes and the tag is added at flip time. Monterey County now has 7 rows (3 verified).
Monterey County
Published: 10 Nov 2026
Marin County: NMWD $8,675 label resolved - Grand Jury estimate, not a district charge
Marin County (unincorporated): the $8,675 North Marin Water District figure quoted in the June 2023 Civil Grand Jury report ('Build More ADUs', Table 3) is resolved as the Jury's own March 17, 2023 estimate for a detached ADU's total NMWD charge — the table's row reads '$7,640/ADU plus' with $8,675.00 for both the 700 and 800 sq ft cases, i.e. the $7,640 Facility Reserve Charge plus $1,035 of additional initial charges. It appears in no NMWD document (Regulation 1 and the November 15, 2022 Facility Reserve Charge Study contain no $8,675) and in no surviving City of Novato Housing Element draft — the September 2023 draft's fee table lists the NMWD ADU charge as $10,000 (the pre-amendment schedule) and the April 2024 revision dropped the fee table. The $1,035 add-on matches no current Regulation 1 component combination, so it is recorded as unconfirmed rather than guessed. $8,675 is therefore not an NMWD charge and is not added as a fee row; the verified Novato ADU Facility Reserve Charge remains $7,640. No fee amounts changed.
Marin County
Published: 10 Nov 2026
SLO County: Los Osos ADU prohibition re-checked live - five Los Osos rows flagged, no amounts changed
San Luis Obispo County (unincorporated): the county's ADU exclusion was re-checked live on November 10, 2026, and is still current in both county documents - the county ADU page (last updated June 19, 2025) states ADUs 'shall not be allowed' within the Los Osos Groundwater Basin boundary and/or the Los Osos Groundwater Basin Plan Area, and the ADU Pre-Screening Checklist (updated November 19, 2025) states 'Accessory Dwellings (ADUs) are not permitted in Los Osos and Cambria URLs'. All five Los Osos fee rows now carry that cross-check in their notes: the three unverified rows (Los Osos wastewater capacity charge $23,852 per Benefit Unit, Los Osos CSD new water service connection $2,584, and the $195 Will-Serve application) must not be promoted to verified until the premise - that an ADU in Los Osos can be charged at all - is resolved, because the earlier evidence proves the charges exist, not that they apply to an ADU; and the two verified rows (the Los Osos-area Road Improvement Fee, $1,596.95 for a 750 sq ft and over ADU, and Golden State Water's $0 Los Osos connection charge) apply only to parcels where an ADU is permitted, with the overlap between the fee areas and the prohibition boundary still to be confirmed. The checklist's 'Los Osos URLs' wording and the page's 'Groundwater Basin boundary / Plan Area' wording are different boundaries and are not merged. No fee amounts, statuses or totals changed.
San Luis Obispo County
Published: 10 Nov 2026
Monterey County: Monterey Peninsula USD school fee verified at $5.38/sq ft — fourth school-fee area
Monterey County (unincorporated) gains a fourth verified school-fee area: Monterey Peninsula Unified School District at $5.38 per sq ft residential (800 sq ft ADU = $4,304). The district's own Developer Fees page, read live November 10, states it 'levies the current SAB Level I fees updated September 26, 2026' — $5.38 per sq ft of assessable space, including 'construction of ADU's of 500 square feet or more'. Resolution No. 26/27-01 (adopted July 28, 2026; justification by Total School Solutions) levies $5.38 residential / $0.87 commercial, effective September 26, 2026 (60 days after adoption, Education Code Sec. 17621(a)), superseding the $5.17 rate from Resolution #23/24-38 (June 25, 2024). The district is a unified K-12 district, so the full Level I rate applies with no feeder split; its unincorporated-county territory includes a portion of the Del Monte Forest census-designated place. One caveat from the resolution: Level 1 is levied only where the district cannot or elects not to collect Level 2 fees or negotiated 'Mira fees', so some projects may pay a different fee instead — $5.38 is the standard Level 1 rate. The county's verified school-fee range at 800 sq ft is now $3,024 (Carmel USD) to $4,304 (Monterey Peninsula USD); Salinas-area pockets $3,856 and North Monterey County USD $4,136 are unchanged. This closes the cycle292 12/1 target for Monterey Peninsula USD.
Monterey County
Published: 10 Nov 2026
Monterey County: North County Fire impact fee confirmed at $0.86/sq ft — ADUs under 750 sq ft exempt
Monterey County (unincorporated): the North County Fire Protection District fire impact fee schedule is confirmed at $0.86 per living-area sq ft for single-family housing (800 sq ft ADU = $688), from the district's adopted Resolution No. 25-6-3 (June 17, 2025) as ratified by County Resolution No. 26-019 (January 13, 2026, Monterey County Code Sec. 10.80.100F); the SCI Consulting Group nexus study confirms the identical rates. The district's own table exempts ADUs under 750 sq ft and charges $0.86/sq ft at 750 sq ft or more, replacing the 2018-program rate of $0.65 (+32%). The earlier district Resolution 25-3-1 (March 18, 2025) carried incorrect amounts and was rescinded — its figures must not be cited. The row is recorded as to_verify, not because the rate is uncertain, but because the district overlaps the county's three school-fee areas and the single-dimension area model cannot yet express a fire-district area on top of a school area; flipping it to verified would render a false standalone $688 area schedule. This closes the matrix-batch23 12/1 target #6 for North County Fire.
Monterey County
Published: 9 Nov 2026
SLO County water/sewer providers: Golden State Water Los Osos ADU $0 verified; county CSA connection fees recorded
San Luis Obispo County (unincorporated) gains 10 water/sewer provider rows. One verified: Golden State Water's Los Osos service area charges $0 in water connection/capacity fees for an ADU sharing the existing service — current Rule No. 16 (Advice Letter 1996-W, effective May 21, 2026) provides one standard connection up to 2 inches at no charge per single-family parcel, its connection-fee table lists Bay Point only so Los Osos has no fixed connection fee, and a qualified ADU is not new residential use for connection fees or capacity charges unless built with a new single-family dwelling (Gov. Code Sec. 65852.2(f)(3)(A); Advice Letter 1946-W background). A separate ADU service, if requested, is billed at actual installation cost on a quoted estimate — no published fixed fee. Nine rows stay unverified, all from the county Public Works 'Sewer and Water Connections (Will Serve)' page read live November 9: county service-area connection fees for a single-family residence — Cayucos (CSA 10A) water $8,100, Shandon (CSA 16) water $2,800, Santa Margarita (CSA 23) water $2,725, Nipomo (CSA 1) wastewater $2,000, Oak Shores (CSA 7A) wastewater $2,075, San Luis Obispo Country Club (CSA 18) wastewater $2,500 — plus 1-inch meter fees for Cayucos $350, Shandon $575 and Santa Margarita $260. Each carries an area tag so a parcel pays one service area's rows, never the sum. ADU application is unconfirmed for all nine: the county page lists single-family residence fees only. The county's Los Osos capacity fee of $23,852 is NOT duplicated here — it is already CSD-01 in the pending cycle296 branch, and the county's live Will Serve page now lists it as the current fee (with a September 2022 Board of Supervisors hearing on the establishing resolution), which the daily routine can use to flip CSD-01 to verified. S&T Mutual Water Company (Sunset Terrace, Los Osos) publishes no connection-fee amount online — not found, not encoded. In this branch the county has 12 rows (2 verified).
San Luis Obispo County
Published: 9 Nov 2026
Marin County state taxes verified: SMIP 0.01% + green tax 0.004% of improvement value
Marin County (unincorporated) gains 2 verified state-tax rows (port of the November 5 draft, re-verified live November 9 from the county Community Development Agency's 'Understanding Your Permit Fees & Charges' page): the Seismic Motion Instrument Program (SMIP) tax at 0.01% of the value of the proposed improvements for residential occupancies ($0.50 minimum, CA Public Resources Code Sec. 2705(a)) and the Building Standards Commission 'green' tax at 0.004% of the same value ($1.00 per $25,000 of improvements, $1.00 minimum, CA Health and Safety Code Sec. 18931.6(a)). Unlike the county's 10%/6% surcharges verified in the previous cycle, these two are percentages of improvement value, so the encoding is dimensionally correct — but feeCalc still skips them while the county has no valuation basis on file, so they carry no dollar total yet (the same treatment as Diamond Bar's verified percentage rows). The county now has 4 rows (4 verified).
Marin County
Published: 9 Nov 2026
Marin County permit surcharges verified: Planning 10% + Technology 6% of permit fee
Marin County (unincorporated) gains 2 verified surcharge rows (port of the November 5 draft, re-verified live November 9 from the county Community Development Agency's 'Understanding Your Permit Fees & Charges' page): the Planning Surcharge Fee at 10% of the building permit application + issuance fees (Ord. 3372) and the Technology Enhancement Fee at 6% of the same sum (Marin County Code Sec. 19.04.032(d)(6)). Both are percentages of the permit fee, not of valuation, and are encoded as such; feeCalc skips them while the county has no valuation basis on file, so they carry no dollar total yet (the same treatment as Diamond Bar's verified percentage rows). The building permit base fee itself stays unverified: the county's Permit Base Fees page still publishes ranges only (Single Family Dwellings $3.87-$13.32 per sq ft; Attached/Detached Accessory Uses $3.09-$12.49), placement inside the range is unpublished, and no county page states which row a detached ADU falls under — so no fixed 800 sq ft permit fee can be stated. The county now has 4 rows (4 verified).
Marin County
Published: 9 Nov 2026
Marin County: MMWD water capacity charge verified at $0 for a qualifying ADU (Code §11.56.050(h)(3))
Marin County gains one verified row: the Marin Municipal Water District water capacity charge for an ADU is $0 when the Code §11.56.050(h)(3) conditions are met, verified live today on the district's Code of Ordinances (Ord. 469, 3/18/2025): no new or separate water service and no capacity charge for one ADU per lot if the newly constructed ADU is at most 1,200 sq ft detached (50% of the primary dwelling if attached) on a lot with an existing single-family home and existing water service, the ADU or the home is owner-occupied, both meet the water-efficiency standards, and the applicant has been a continuous district customer for at least one year. It applies only to parcels in the MMWD service area (central/southern Marin), so it is area-tagged and never summed with the North Marin Water District Facilities Reserve Charge lines. An ADU that fails the conditions pays a charge proportionate to its drainage fixture units — no published schedule, so that amount is not encoded. Marin County now has 3 fee rows, all verified.
Marin County
Published: 9 Nov 2026
Marin County: Oceana Marin ADU sewer connection verified at $15,000 (NMWD Regulation 109)
Marin County gains one verified row: the North Marin Water District Oceana Marin sewer connection charge for an ADU is $15,000, verified live today on NMWD Regulation 109 (June 2023 revision, still current on nmwd.com): the regulation charges $30,000 per single-family dwelling and 50% of that charge for an accessory dwelling unit. It applies only to parcels in Improvement Districts OM-1/OM-3 (Oceana Marin, Dillon Beach area), so it is area-tagged and never summed with the Novato Sanitary or Las Gallinas sewer lines. The FY2023-24 annual sewer service rate ($1,374 per equivalent unit, ADUs at 50%) is recurring and is not encoded. Marin County now has 3 fee rows, all verified.
Marin County
Published: 9 Nov 2026
Marin County: North Marin Water District ADU capacity charges verified (Novato $7,640; West Marin $5,580)
North Marin Water District Regulation 1 (effective December 6, 2022, still the current revision on nmwd.com — re-verified live November 9, 2026) sets the Facilities Reserve Charge for a second dwelling unit / ADU up to 1,200 sq ft and up to 50% of the primary dwelling at $7,640 in the Novato service area and $5,580 in the West Marin service area, corroborated by the district's 2022 Facility Reserve Charge Study (Tables 3 and 6) and its July 19, 2023 response to the Marin County Civil Grand Jury. Both rows are area-tagged (a parcel is in one service area only) and capped at 1,200 sq ft; above that the full single-family charge applies ($28,310 Novato / $20,660 West Marin, not encoded). This resolves the three-way figure conflict: the October matrix's $5,580 for Novato was the West Marin figure misapplied, and the Grand Jury report's $8,675 appears in no district document (the pre-amendment Novato ADU charge was $10,000 per the district's March 7, 2023 board agenda) and is treated as a stale secondary figure. The FRC is a connection/capacity charge, so SB 1117 does not change it; meter, service-line and reimbursement-fund charges are additional and not encoded. Marin County now has 4 fee rows (all verified).
Marin County
Published: 9 Nov 2026
San Luis Obispo County: Los Osos + Nipomo CSD connection rows added (8); Nipomo ADU capacity $0 verified
Eight Los Osos / Nipomo community services district (CSD) connection rows ported from the November 6 draft onto current main and re-verified live November 9, all staying unverified. Los Osos wastewater capacity charge: NBS study (February 2022) $23,852 per Benefit Unit with the ADU proportional formula ($11,181 at 750 sq ft; $14,908 at 1,000 sq ft; $17,889 at 1,200 sq ft; $0 under 750 sq ft and for JADUs) — the study PDF is still served live by the county, but Board adoption of the $23,852 charge was not found, so it stays unverified. Los Osos CSD: new water service connection $2,584 (SFR) and Will-Serve application $195 per unit from the 5/2021 schedule, still the live schedule — ADU application unconfirmed (schedule lists SFR / multi-family / mobile-home rates only). Nipomo CSD: verification of service letter $389, water lateral inspection $430, sewer lateral inspection $281, and 1-inch meter fee $1,013, all unchanged in the 2025-26 schedule (Res. 2023-1681); the lateral/meter amounts are conditional (new lateral or meter only) so they stay unverified. Nipomo ADU capacity is $0 and verified: District Code 2.04.100(B)-(C) (Ord. No. 2023-136) says an ADU is not a new residential use for capacity charges, except a detached ADU built with a new dwelling — re-read verbatim live November 9 from the district's online code book (Municode, version Apr. 3, 2024). The $14,821 new-meter exception figure (1 inch or less $4,127 + supplemental water $10,694, effective 7/1/25) was re-confirmed live. The Nipomo verification-of-service letter ($389) is also confirmed as the ADU intake instrument (the district's form lists 'New Accessory Dwelling Unit (ADU)'), but it stays unverified because it is a Nipomo-only fee that must not enter the county-wide total without an area tag. The Intent-to-Serve $1,497 application is not encoded: ADU intake is the Verification of Service letter, not Intent-to-Serve. San Luis Obispo County now has 10 fee rows (2 verified).
San Luis Obispo County
Published: 9 Nov 2026
San Luis Obispo County school fees split into exclusive district areas (no more double-counting)
San Luis Obispo County's two school-fee rows are now tagged as mutually exclusive areas, so the calculator no longer sums both districts for one parcel: San Luis Coastal USD $5.17/sq ft (verified) and Templeton USD $5.17/sq ft (unverified) each apply only to parcels in that district's boundary. No rates changed. Two further school rows in the unmerged SLO County PFF branch (Lucia Mar USD, Paso Robles JUSD) still need the same area tag when that branch merges.
San Luis Obispo County
Published: 9 Nov 2026
San Luis Obispo County Road Improvement Fee verified: 11 area rates ($143–$6,085 per ADU)
San Luis Obispo County (unincorporated) gains 11 Road Improvement Fee rows, all verified (port of the November 6 draft, re-verified live November 9 from the county's published Road Improvement Fee Schedule, effective March 1, 2026 — the live PDF is byte-identical to the November 6 copy). Each RIF area's ADU fee is the schedule's own arithmetic: cost per peak-hour trip x the ADU trip generation rate 0.41 pht/unit, per Note 5 ('Residential Secondary Unit (or ADU) 750 square feet and greater will be calculated using a flat rate based on proportion of the median ADU and median SFD (per Gov. Code 65852.2)'). Avila Valley $12,732 x 0.41 = $5,220.12; North Coast A $720 x 0.41 = $295.20, B $1,225 x 0.41 = $502.25, C $1,566 x 0.41 = $642.06, D $723 x 0.41 = $296.43, E $348 x 0.41 = $142.68; Los Osos $3,895 x 0.41 = $1,596.95; San Miguel $7,471 x 0.41 = $3,063.11; South County Areas 1 and 2 $14,842 x 0.41 = $6,085.22 each; Templeton $10,456 x 0.41 = $4,286.96. The 11 areas are mutually exclusive area schedules — a parcel pays one area's fee, never the sum — so each row carries its own area tag and the fee page shows the verified total as a range across areas ($4,279 in North Coast Area E to $10,221 in South County at 800 sq ft, including the $4,136 SLCUSD school fee). At 750 sq ft or less the RIF is $0 under Gov. Code 66311.5(c) (the schedule's '750 and greater' wording is overruled by state law at exactly 750 sq ft). The flat RIF lines are SB 1117-uncertain in 2027 — the county has published no rule for how flat fees map to the excess-area rule, so no 2027 figure is computed. Subdivision-agreement fees and the State Route 227 corridor program (case-by-case) are not encoded. The county now has 13 rows (12 verified).
San Luis Obispo County
Published: 9 Nov 2026
San Luis Obispo County PFF verified: $3,834 ADU impact total + R3 building rates ($2,224 at 800 sq ft)
San Luis Obispo County (unincorporated) gains 12 fee rows (port of the November 6 draft, re-verified live November 9 from the county's published FY 2026-2027 Fee Schedule). Nine rows are verified: the seven Public Facilities Fee components for a Single Family ADU of 750-1,200 sq ft — Fire $1,130, General Government $580, Library $388, Park Development $832, Park Land $443, Sheriff $386, Admin Fee (2%) $75 — summing to the schedule's published ADU total of $3,834 (SFR row $8,657 for context; PFF table effective January 1, 2026; fire fees are paid directly to Templeton CSD for Templeton and Cambria CSD for Cambria, and Quimby-paid lots are exempt from the Park Land portion); plus Residential Single Family (R3) plan check $1.19/sq ft and inspection $1.59/sq ft including the 9.74% Technology Surcharge Fee ($952 + $1,272 = $2,224 at 800 sq ft; no ADU-specific building line exists, ADUs use the R3 rates). Three rows stay unverified: Fire-Rated New Construction - Small $1,957.76 (figure re-confirmed live today, but conditional — only when fire-rated construction is required, and the calculator has no conditional-fee mechanism); Lucia Mar USD school fee $5.17/sq ft (2024 vintage, FY 2023-24 annual report — no 2026 adoption of the $5.38 maximum found); Paso Robles JUSD school fee $5.17/sq ft (Resolution 25-19, adopted March 25, 2025 — the feeder-district split with Pleasant Valley / San Miguel JUSD is unconfirmed). The county now has 14 rows (10 verified), including the pre-existing SLCUSD school fee $5.17/sq ft (FI-191, verified) and Templeton USD $5.17/sq ft (FI-527, unverified). Verified total for an 800 sq ft ADU is $10,194 ($3,834 PFF + $2,224 building + $4,136 school). The seven flat PFF lines are SB 1117-uncertain in 2027 — the county has published no prorate formula for flat per-unit fees, so no 2027 figure is computed. Before the Lucia Mar / Paso Robles / Templeton school rows can be verified, all county school rows need mutually exclusive area tags (otherwise the calculator would sum $5.17/sq ft once per district).
San Luis Obispo County
Published: 9 Nov 2026
Monterey County school fees split by district: NMCUSD $5.17 and Carmel USD $3.78 verified (three exclusive areas)
Monterey County (unincorporated) school fees are now split by district into three exclusive areas (a parcel pays one area's fee, never the sum). North Monterey County USD $5.17/sq ft verified (Resolution No. 2023-2237, adopted April 11, 2024 — the district's own resolution, re-verified live today; no 2026 adoption of the SAB $5.38 maximum was found, so the FY 2025-26 annual report due 2026-12-27 is the re-check target; 800 sq ft = $4,136). Carmel USD $3.78/sq ft verified (district's own Developer Fees page, live today, stating the current rate; Resolution No. 25-09, adopted May 14, 2025, effective July 13, 2025; 800 sq ft = $3,024). The existing Salinas-area SUHSD Level II $4.82/sq ft row (FI-504, 800 sq ft = $3,856) is area-tagged 'Salinas-area pockets' so it is no longer added to the other areas' totals. Verified school total for an 800 sq ft ADU is $3,024 (Carmel), $4,136 (North County), or $3,856 (Salinas-area). Ten draft rows stay unverified: the Article XIX building-fee band and its percentage items (plan check 32.5%, General Plan 15%, Technology 13% — text re-confirmed today, but dollar values depend on the unverified valuation band / permit fee, and the calculator's percentage method means percent of valuation, not percent of another fee; the $646 standardized-plan review applies only to the county's pre-designed plans, so it cannot be a flat row for every ADU); the four TAMC Regional Development Impact Fee zone bases (adopted-program ADU rule unverified; 2026 update maximums are proposed, not adopted); and the Cypress Fire Protection District $0.53/sq ft fire fee (ADU treatment unverified). Monterey Peninsula USD and other districts' pockets still have no verified rate.
Monterey County
Published: 9 Nov 2026
Stanislaus County PFF impact fee verified: $3,061 at the 800 sq ft spec (prorated single-family base, capped)
Stanislaus County (unincorporated) gains its headline impact fee, verified from two official county sources. The PFF Annual Report FY 2025 (Board agenda 2/3/2026) lists the unincorporated ADU total at $3,061 against the $10,171 single-family total, and Resolution 2021-0195 (Board agenda 5/11/2021) gives the formula: ADU fee = (ADU sq ft / primary sq ft) x single-family fee, lesser of the proportional amount or the ADU flat rate, with ADUs up to 750 sq ft exempt. Encoded as a dwelling-base line ($10,171 base, $3,061 cap, same Westminster pattern): at the 1,600 sq ft default primary, an 800 sq ft ADU prorates to $5,086, so the cap binds and the fee is $3,061; for a larger primary the fee is lower (3,600 sq ft primary: $2,260). SB 1117 converts exactly to $318 on the 50-sq-ft-above-750 basis at the default primary. The county ADU handout independently lists the same $3,061 ADU line and the 750 sq ft exemption. Four rows stay unverified: the Modesto City Schools combined school rate $5.17/sq ft (elementary $3.10 confirmed in the FY2025 report, high-school share inferred from the 60/40 split only, 2026 $5.38 adoption unconfirmed — the FY2025-26 annual report, due 2026-12-27, is the re-check target); septic upgrade $600 and demolition $450 (rates re-confirmed live in the handout, but mutually exclusive alternatives to the verified $900 new-septic fee — a parcel pays one of the three, and feeCalc has no alternative-group mechanism); planning review $102 first hour (rate re-confirmed, but conditional on departmental review being required). Stanislaus County now has 7 fee rows (3 verified).
Stanislaus County
Published: 9 Nov 2026
Marin County sewer fees verified by district: Novato Sanitary $9,760 (800 sq ft) vs Las Gallinas Valley $0
Marin County (unincorporated) gains two verified sewer rows, split by service area (a parcel pays one district's schedule, never both). Novato Sanitary District area: sewer connection fee $12.20/sq ft verified — District Connection & Permit Fees and Charges effective 7/1/2026 set the full connection fee at $14,640 per family unit, and the District ADU page charges ADUs under 1,200 sq ft the proportion of ADU size to 1,200 sq ft, so an 800 sq ft ADU pays 800/1200 x $14,640 = $9,760. Las Gallinas Valley Sanitary District area (Santa Venetia, Marinwood, Lucas Valley): $0 connection/capacity fee for ADUs verified — FY2025-26 Final Budget (adopted June 18, 2025): 'ADUs are normally not subject to capacity or connection fees'. Both districts may still bill an annual sewer service charge (amount not in these rows). The November 5 draft's other 11 rows stay unverified: building-permit range $3.87-$13.32/sq ft (exact placement TBD), 10%/6% surcharges, C&D $50-$250, SMIP/green taxes, Roads Impact Fee 1% (ADU application unverified), NMWD Oceana Marin $15,000, NMWD Facilities Reserve Charge $7,640 Novato / $5,580 West Marin (2022 regulation; current rate unverified), and MMWD $0 conditional on owner-occupancy, 1-year customer status, and water-efficiency standards.
Marin County
Published: 9 Nov 2026
Santa Clara County school fees split by district: Cambrian SD $3.77 + Campbell Union HSD $1.61 verified (Cambrian Park area)
Santa Clara County (unincorporated) school fees are now split by district into two exclusive areas (a parcel pays one area's fee, never both). Cambrian Park area: Cambrian School District share $3.77/sq ft verified (2026 Developer Fee Justification Study, SchoolWorks, Feb 2026 — 70% of the $5.38 SAB Level I maximum; board approved Apr 21, 2026, eff. June 21, 2026) plus Campbell Union HSD share $1.61/sq ft verified (district fee page; approved May 7, 2026, eff. July 7, 2026, Res. #28-05-07-26) — combined $5.38/sq ft, the same cap as the San José USD area. The existing SJUSD $5.38/sq ft row (FI-230) is area-tagged 'San José USD' so it is no longer added to the Cambrian area total. Verified school total for an 800 sq ft ADU is $4,304 in both areas. This also corrects the batch14 matrix mapping: Cambrian Park is Cambrian SD + Campbell Union HSD territory, not SJUSD. Morgan Hill USD's 2026 rate is still not found (district inquiry only) and the county Pre-Approved ADU vendor list is still empty.
Santa Clara County (unincorporated)
Published: 9 Nov 2026
Kern County school fee verified: Greenfield USD $3.50/sq ft (800 sq ft = $2,800); KHSD share still to verify
Kern County (unincorporated): Greenfield USD school share $3.50/sq ft verified (2026 Fee Justification Study + Board Res. No. 26-15 adopted May 13, 2026, eff. July 12, 2026); 800 sq ft ADU = $2,800 (Greenfield share only). KHSD share $1.88/sq ft added as to_verify (35% arithmetic; KHSD 2026 adoption not located). Traffic impact fee $12,870, General Plan Review $0.13/sq ft, and base sewer fee $14 added as to_verify (2022 Housing Element figures; current rates still unconfirmed). Kern County goes from 0 to 5 fee rows (1 verified).
Kern County (unincorporated)
Published: 9 Nov 2026
El Centro school fee verified: CUHSD $1.66/sq ft (800 sq ft = $1,328); elementary share still not found
El Centro: CUHSD school fee $1.66/sq ft re-verified live (rates eff. 8/24/2026); 800 sq ft ADU = $1,328 (CUHSD share only). Elementary-district share still not found — LAFCO SAP confirms four districts serve the city, so the share is parcel-dependent. Building permit schedule and current DIF/water/sewer rates still not located.
El Centro
Published: 9 Nov 2026
La Puente fee rows added (18): 6 county permit lines verified from the FY 2025-26 schedule; 12 rows stay unverified
La Puente gains 18 fee rows (port of the November 5 draft, re-verified November 9 against the original sources, plus four LA County permit-fee lines). Key correction: the draft's LA County amounts were from the FY 2024-25 schedule and are superseded by the FY 2025-26 schedule (effective July 1, 2025, 3.0% CPI increase) - issuance $38.83 to $39.99, Certificate of Occupancy $142.25 to $146.52, standardized plan-check minimum $211.81 to $218.17, plan-maintenance min/max $13.91/$592.52 to $14.33/$610.29. Six rows are verified from LA County Code Title 26 (Municode, fees effective July 1, 2025) and the DPW FY 2025-26 schedule: issuance $39.99, plan maintenance 2% of permit fee, Table 1-A permit-fee tiers ($100,001+ band $1,867.20 + $9.66/$1,000), plan check 85% of permit fee, SMIP 0.013% residential, energy compliance +10%. Twelve rows stay unverified: the five city planning lines (SPDR $892/$368 is discretionary review a ministerial ADU does not go through; planning final inspection $95 and zoning verification $200 are conditional/optional; landscape $850 is a deposit plus actual costs); Certificate of Occupancy (general schedule line only, cf. FI-463); standardized plan-check minimum (conditional on standardized plans); Rowland USD school fee $5.17/sq ft (FY 2024/25 confirmed in the district's Gov. Code 66006 disclosure; whether Rowland adopted the 2026 SAB maximum $5.38 is unconfirmed - area-tagged Rowland USD, Hacienda La Puente USD covers most of the city and its rate was not found); La Puente Valley County Water District capacity charges $2,196/$3,295/$5,491 and application fee $25 (November 2018 rules - capacity charge applies only to new service or a meter upsizing, and the 2018 amounts may have been adjusted). La Puente now has 18 fee rows (6 verified). The verified total for an 800 sq ft ADU is $39.99 - valuation-based lines carry no total because no La Puente valuation basis is on file. No city multiplier on county fees was found in public sources (Lawndale doubles county fees - do not assume 1x, but no La Puente multiplier was located).
La Puente
Published: 9 Nov 2026
Diamond Bar fee rows added (15): 8 permit lines verified from the FY 2026-27 schedule; 7 rows stay unverified
Diamond Bar gains 15 fee rows (port of the November 5 draft, re-verified November 9). Eight plan-check/permit lines are verified from the City of Diamond Bar FY 2026-27 Fee Schedule - Building Construction Fees (effective July 1, 2026): permit-fee tiers ($100,001+ band $2,738.66 + $20.45/$1,000), plan check 85% of permit fee, Energy Enforcement 10%, Permit System Replacement 15.3%, General Plan Update 6%, Records Archiving 1%, SMIP 0.013% residential, BSASRF $1 per $25,000. They carry no total yet: Diamond Bar has no valuation basis on file, so feeCalc skips valuation-based lines. Seven rows stay unverified: Certificate of Occupancy $306 (general schedule line only, no ADU-specific line - cf. FI-463); Traffic $900, Park $2,175 and Sewer Connection $2,410 (March 2021 draft Housing Element Table IV-6 amounts only - current amounts unconfirmed, annual CPI adjustment applies); Walnut Valley USD school fee $5.17/sq ft (FY 2024/25 confirmed; April 2026 Level I study justifies $5.38 but board adoption unconfirmed; area-tagged Walnut Valley USD, Pomona USD share unconfirmed); Walnut Valley Water District capacity charges $5,630 (5/8- or 3/4-inch) and $9,384 (1-inch) (September 2025 Rules & Regulations App. C, new or larger connections only - ADU applicability unconfirmed).
Diamond Bar
Published: 9 Nov 2026
Vacaville ADU planning fee found: $2,794 flat (FY 2026-27 schedule)
The City of Vacaville's FY 2026-27 Service and Facility Rental Fees workbook (Planning Applications table) lists 'Accessory Dwelling Units' at $2,794 flat — the first row of the Planning Division fee table, found via the Planning Division Forms and Fees page. This closes matrix target #6, which was 'Not found' because the master fee schedule had not been located; ADUs are ministerial under VMC §14.09.270.040, but the city still charges the planning application fee (the ADU submittal checklist requires City Planner approval before the checklist is completed). The fee is verified, applies to the 800 sq ft spec scenario in full, and is not an impact fee, so SB 1117 (effective January 1, 2027) does not change it. Vacaville now has 14 fee rows (9 verified).
Vacaville
Published: 9 Nov 2026
San Miguel CSD ADU connection fees verified: water $11.77 + wastewater $11.57 per sq ft
San Luis Obispo County (unincorporated) gains 2 verified water/sewer rows for the San Miguel area: San Miguel CSD ADU connection fees from the district's FY 26-27 schedule read live November 9 (effective July 1, 2026) — water $11.77/sq ft and wastewater $11.57/sq ft. At 800 sq ft that is $9,416 + $9,256 = $18,672. Both carry the 'San Miguel' area tag, matching the existing San Miguel RIF row, so a San Miguel parcel's verified total becomes $27,793 at 800 sq ft ($3,834 county PFF + $2,224 R3 building + $3,063.11 RIF + $18,672 CSD connections; no school fee is area-tagged to San Miguel yet — the San Miguel JUSD feeder split with Paso Robles JUSD is still unconfirmed). Connection/capacity charges are not impact fees, so the 750 sq ft exemption (Gov. Code 66311.5) does not apply to these two lines and SB 1117 leaves them unchanged. Not encoded: the district's 2024 Utilities Fee Schedule meter/installation figures — Resolution 2026-39 (adopted August 27, 2026) revised the utility fee schedule for water meter fees and other services, so the 2024 meter fee ($483 for a new 1-inch meter) is superseded and the revised amounts were not found in the published minutes; the Will Serve fee has no fixed amount in any published document. The county now has 45 rows (25 verified).
San Luis Obispo County
Published: 9 Nov 2026
SLO County: Oceano CSD Will Serve fee $30 verified; water connection and capacity rows recorded
San Luis Obispo County (unincorporated) gains 5 Oceano Community Services District water/sewer rows, all area-tagged 'Oceano' so a parcel pays one service area's rows, never the sum. One verified: the district's Intent-to-Serve (Will Serve) application processing fee is $30 per structure or separate residential unit (application form revised 4/2025, which lists ADU as a project type). Four rows stay unverified, all from Ordinance No. 2006-1 read verbatim live November 9 (copy attached to the Feb. 14, 2024 board agenda): a new 5/8-inch water service connection fee of $675 installation plus $81.60 per front foot (minimum $4,755; larger meters higher, actual fee rises with frontage, and only when a new or separate service is installed); an additional connection fee of $1,000 per equivalent single-family dwelling; a water capacity charge set by formula only ($1,572 per ESFD in 1993, plus the SFR minimum bi-monthly charge times six each January 1) whose current dollar amount is not published and cannot be derived from public sources, so no amount is stated; and a water facilities inspection fee of $25 per unit for multiple units ($50 for a single-family dwelling — which row an ADU falls under is unconfirmed). The $1,000 fee and the capacity charge stay unverified for a substantive reason, not just missing paperwork: the ordinance defines an ADU-type unit as one ESFD, but Gov. Code Sec. 65852.2(f)(3)(A) says an ADU is not a new residential use for connection fees or capacity charges, and unlike Nipomo CSD or Golden State Water the district has no ADU provision stating which reading governs — the ordinance contains no 'accessory' at all. Not found, not encoded: the district's fixed sewer connection fee (connections are installed at the applicant's actual cost), meter costs under Ord. 2006-2 (cited in the Will Serve form, text not in the public index), and any South SLO County Sanitation District one-time connection fee (it levies recurring annual treatment charges only). The $1,500 Will Serve deposit is a deposit, not a fee. Oceano is in Lucia Mar USD, whose $5.17 school fee stays unverified pending its 2026 adoption check. In this branch the county has 48 rows (24 verified); the Oceano area's 800 sq ft verified total is $6,088 (county PFF $3,834 + R3 building $2,224 + Will Serve $30, school $0).
San Luis Obispo County
Published: 9 Nov 2026
Lucia Mar USD school fee verified at $5.38/sq ft (effective May 2, 2026)
Lucia Mar Unified School District residential school developer fee verified at $5.38 per square foot, effective May 2, 2026 (800 sq ft: $4,304, up from $4,136 at the prior $5.17 rate). Source: the district's official FAQ (luciamarschools.org/faq), read live November 9: 'As of May 2, 2026, Developer Fees are $5.38 per square foot for residential development and $0.87 for commercial/industrial development.' Applies to Lucia Mar USD boundary parcels only (Arroyo Grande / Nipomo / Oceano / Grover Beach pockets); ADUs of 500 sq ft or more. The 2026 adoption resolution number was not found in indexed board records — the FAQ states the effective date only — and the FY 2024-25 annual report was not publicly accessible, so the citation stays at the FAQ until the FY 2025-26 report hearing on November 17, 2026.
San Luis Obispo County
Published: 9 Nov 2026
SLO County: Paso Robles JUSD school fee $5.17 verified; feeder-area split confirmed
San Luis Obispo County (unincorporated): the Paso Robles Joint Unified school fee is verified at $5.17 per square foot (800 sq ft = $4,136) for K-12 Portion parcels, re-checked live November 9 against the district's own Certification of Compliance form (Residential $5.17, Commercial $0.84, fees updated June 1, 2025, per Resolution 25-19 adopted March 25, 2025) and corroborated by the district's May 2, 2024 Fee Justification Study (Woolpert), Conclusion Table 23. The feeder split is now confirmed, correcting the earlier $1.29 shorthand: within the Pleasant Valley and San Miguel feeder areas PRJUSD's share is $0.46 per square foot for single-family detached and $1.40 for multi-family construction, and parcels there do not pay PRJUSD directly — San Miguel-listed parcels pay at San Miguel JUSD and Pleasant Valley-listed parcels pay at the San Luis Obispo County Office of Education. The feeder districts' own shares are unconfirmed and are not listed (no complement arithmetic is used). No 2026 adoption of the $5.38 SAB maximum was found — the district form still shows $5.17 as of November 9; re-check December 1.
San Luis Obispo County
Published: 8 Nov 2026
Vacaville school fees verified: Vacaville USD $5.38, Travis USD $5.17 (exclusive areas)
Vacaville's school fees are verified and split into two exclusive areas (a parcel pays one district's fee, never both). Vacaville USD: $5.38/sq ft residential, verified on the district's own Developer Fee Information page (ADUs of 500+ sq ft charged on the entire new square footage; under 500 sq ft exempt), corroborated by the district's 2026 Addendum to Fee Justification Study (Public Economics, July 8, 2026) justifying the $5.38 maximum; the adopting resolution and effective date were not found, so no effective date is stated. Travis USD: $5.17/sq ft Level I residential from May 5, 2025, verified on the district's 2024-25 Developer Fee Annual and Five-Year Report (Oct 14, 2025). That report also resolves the old $6.78 figure: it was Travis USD's Level II rate from May 5, 2024 to May 4, 2025, and Level II collection ended May 5, 2025. Vacaville's verified total for an 800 sq ft ADU is now $10,490 (Travis USD area) to $10,658 (Vacaville USD area) across 7 line items.
Vacaville
Published: 8 Nov 2026
Clovis: seven development-scale fee lines recorded (unverified); Fire/Police nexus basis added
Seven development-scale lines from the Master Development Fee Schedule 2024-2025 (eff. July 21, 2025) recorded as unverified rows CLOVIS-NEW-16..22: Water Supply $13,880/gross acre, Utility Undergrounding Area 1 $9,119/gross acre, Sewer Oversize $1,123/gross acre, Sewer Front Footage $32.30/linear foot, Water Oversize $1,826/gross acre, Water Front Footage $29.75/linear foot, Fire Transition $1,209/gross acre. They are charged per gross acre (or per linear foot) of a development, and the city has published no rule for how they apply to a single ADU on an already-developed lot, so no ADU figure is shown for them and they are excluded from all calculator totals. The Fire Transition Fee's purpose and definition were not found in any retrieved city document. Fire/Police 'Growth Areas' rows (CLOVIS-NEW-03/04) now cite the nexus basis (all land uses, entire sphere of influence); the $6,127 Loma Vista line is confirmed as the Neighborhood Park Deposit for Street Area 4, not part of the Area 4 street total. Clovis now has 22 fee rows, all unverified.
Clovis
Published: 8 Nov 2026
Clovis school fee line added (unverified): Clovis USD Level II $6.38/sq ft for ADUs over 500 sq ft
Clovis Unified School District's official Developer Fees page (retrieved November 8, 2026) posts Residential New Construction (Level 2) at $6.38/sq ft and states ADUs over 500 sq ft are 'generally assessed in a manner consistent with new residential construction, and fees are applied to the entire square footage of the unit' (Ed. Code §17620); ADUs of 500 sq ft or less are exempt under Gov. Code §66311.5(c)(3). The item stays unverified: the district page never states 'an ADU is charged $6.38' in so many words, the adopting resolution and effective date for the Level II rate were not found, and district boundaries do not match city boundaries (verify per parcel). The $5,104 figure for an 800 sq ft ADU is not published as an official figure. Clovis now has 15 fee rows, all unverified.
Clovis
Published: 8 Nov 2026
Vacaville development impact fees verified from the 2026 city schedule (6 items)
Vacaville's 2026 Connection & Development Impact Fees schedule (effective January 1, 2026, ENR 1.1%) adds 12 line items. Six development impact fees are verified and prorated to the primary dwelling under VMC Ch. 11.01 (Ord. 2005): traffic $6,965, park and recreation $4,176, fire $520, police $371, general facilities $497, greenbelt $176 (all single-family, less than 1,000 sq ft band); at the 1,600 sq ft default primary, an 800 sq ft ADU pays $6,354 of city DIF, and ADUs under 750 sq ft pay $0. Water and sewer connection fees ($13,023/$11,465 water, $6,408/$5,184 sewer, $3,526 meter install) stay unverified: whether a detached ADU on a served lot triggers a new connection is unconfirmed. School fees stay unverified at $5.17/sq ft: the city sheet defers to the districts and predates the SAB's January 2026 increase to $5.38, and neither Vacaville USD nor Travis USD has a published 2026 adoption.
Vacaville
Published: 8 Nov 2026
Carlsbad: boundary school districts modelled as exclusive areas; FY 2026-27 schedule rows added
Carlsbad gains 17 fee rows in one consolidated branch (replacing four October boundary branches and the November 5 schedule branch, which could not merge together). The four boundary school rows now carry area tags so a parcel pays one district's fee, never the sum: Carlsbad USD $5.38/sq ft verified (FI-534), San Dieguito Union HSD $2.83 + Encinitas Union SD $2.55 verified as one paired area totalling the $5.38 cap (FI-535/FI-536), San Marcos USD $5.17 to_verify (FI-537; $5.17 basis corroborated by the district's FY 2024-25 annual report, 2026 $5.38 adoption still unconfirmed). Without the tags the three verified rows summed to $10.76/sq ft ($8,608 at 800 sq ft); each area now totals $4,304. Thirteen FY 2026-27 Master Fee Schedule rows added as to_verify (sewer General Capacity $1,294/EDU, Affordable Housing Impact $2,925/unit, Public Facilities Fee 1.82%/3.5% of valuation, water connection/capacity endpoints, Certificate of Occupancy $89, SWPPP $221, Waste Management $45). The duplicate CUSD to_verify row CARLSBAD-NEW-01 was dropped (verified FI-534 covers it). FI-006 $3,000 permit placeholder stays to_verify. Jurisdiction fee_schedule_url now points to the FY 2026-27 Master Fee Schedule.
Carlsbad
Published: 8 Nov 2026
Five more city cost posts published; ADU financing guide goes live
Five new city cost posts published (San Mateo County $314,637 floor, Grover Beach $305,000 floor, Chico $308,000 floor, Watsonville $308,000 floor, Vallejo $307,000 floor; published city posts 48 to 53). ADU financing guide published: HELOC vs construction loan vs cash-out refinance for a $320,000 build, with the CalHFA grant corrected to past tense (fully allocated December 28, 2023). Moreno Valley impact-fee framing corrected ($0 City DIF only; proportional lines apply at 750+ sq ft).
San Mateo County · Grover Beach · Chico · Watsonville · Vallejo · Moreno Valley
Published: 7 Nov 2026
Ten new city cost posts; /compare/ now totals verified fees only
Ten new city cost posts published (Redlands, Beverly Hills, Santa Clara, Los Altos Hills, Upland, Moreno Valley, Burlingame, Concord, Napa, Corona; published city posts 38 to 48) plus the Inland Empire comparison. /compare/ calculator, side-by-side comparison and PDF now total verified fees only: Clovis 800 sq ft $76,895 becomes 'No verified fees yet', San Jose $17,016 becomes $10,676, Oakland $16,936 becomes $4,136. The November 8 financing post was corrected before publication (CalHFA grant now past tense — fully allocated December 28, 2023; loan rates updated). Fee-page post links fixed for Carlsbad, Encinitas and Palo Alto.
Redlands · Beverly Hills · Santa Clara · Los Altos Hills · Upland · Moreno Valley · Burlingame · Concord · Napa · Corona
Published: 6 Nov 2026
Bid Scanner tool and SB 1117 landing pages for all 161 jurisdictions
New Bid Scanner tool: paste a bid and it sorts every line into the six build phases, flags four red-flag patterns and drafts contractor questions; pasted text never leaves the browser. SB 1117 landing pages for all 161 jurisdictions (800/1,000/1,200 sq ft, 2026 vs 2027 impact fees, verified rows only). Fee-waiver cities post published and corrected after Oceanside's waiver wording was removed from the city's ADU page ('two confirmed $0s, one unconfirmed').
Oceanside
Published: 5 Nov 2026
Clovis fee schedule read; 14 lines found, verification in progress
Clovis's Master Development Fee Schedule 2024-2025 (effective July 21, 2025) was read; 14 line items were found and are listed on the Clovis fee page by name only, without figures, until verification completes. No verified figures were added. The 750 sq ft cliff figure on fee pages now totals verified items only, so a page with no verified rows no longer shows a dollar total from unconfirmed lines. School fees not added: Clovis Unified posts two residential tiers ($5.38 vs $6.38/sq ft) and the ADU assignment is unresolved.
Clovis
Published: 5 Nov 2026
Santa Clara County building fees split into FY 2026-27 schedule lines; FI-015 flat replaced
Santa Clara County (unincorporated) gains nine building-fee schedule lines from the county Building Fee Schedule FY 2026-2027 (effective July 18, 2026), replacing the FI-015 $15,076 flat, which was post-arithmetic and not reproducible from the schedule: at the flat stated $360,000 valuation basis the schedule lines sum to $14,457.68 without the $2,808 planning review and $17,265.68 with it, neither equal to $15,076. The nine lines — building permit ($3,698.51 for the first $100,000 plus $11.30 per additional $1,000 in the $100,001-$500,000 band), plan check at 70% of the permit fee, mechanical/plumbing/electrical at 11% each ($410 minimum), planning review $2,808 at 500+ sq ft, information technology 3%, training and certification 0.73%, and comprehensive planning 0.205% of valuation — are all to_verify: the valuation basis for an 800 sq ft ADU is not in any county document retrieved, so feeCalc skips the valuation-based lines until a basis is confirmed, and whether the $2,808 planning review applies to a ministerial ADU is still open. The county water/sewer providers vary by parcel and are not encoded here.
Santa Clara County
Published: 4 Nov 2026
Campbell post corrected to FY 2027 schedule; CalHFA grant post added for December 18 slot
Campbell post total moved ~$318,000 to ~$310,000: permit example corrected to $2,880 core + $254 add-ons (prior $3,529/$3,929 withdrawn, $649 remainder did not reconcile); impact fee now published at $9,328/unit cap (FY 2026 cap $9,129); schedule resolution corrected (#13333, not #13279); WVSD sewer figures marked [to verify] (current district schedule not located); CUSD mixed 500/750 sq ft wording flagged. New post on the CalHFA ADU Grant (closed since December 28, 2023, no new round posted as of November 4, 2026) added for the December 18 slot; December 19 remains open for the unpermitted-ADU legalization post (not written this session).
Campbell
Published: 4 Nov 2026
Palo Alto DIF unified to the FY27 sheet ($18,090); JADU occupancy post added
Palo Alto's DIF for an 800 sq ft ADU is now a single FY27 figure, $18,090: the FY27 sheet total of $45,226 for a 2,000 sq ft primary, prorated 800/2,000, replacing the ~$8,000-$20,000 range; the post total moved to ~$313,000. Prior figures are kept in the post as prior-year-sheet context only. A new post on ADU/JADU occupancy and the 30-day rental rule was added (now in the December 14 slot).
Palo Alto
Published: 3 Nov 2026
FI-017 scenario fix ($18,090); insurance post sources; AB 1033 post added
FI-017 (Palo Alto FY27 impact fees) corrected to the 800 sq ft ADU proportional scenario at $18,090. Sources added to the ADU insurance post (III, CA DOI). AB 1033 post (separate sale of ADUs) added for the December 13 slot.
Palo Alto
Published: 3 Nov 2026
Fee-schedule URLs filled for San Bernardino and Westminster; 11-04/05/06 posts source-checked
San Bernardino (city Building & Safety fee schedule PDF, footer dated 07/2020) and Westminster (Res. 5307, adopted 2025-06-25) fee-schedule URLs added; Lakewood stays empty (no current city fee schedule found). Palo Alto, insurance, and fee-waiver-city posts checked against original sources: Palo Alto parks rate corrected to $18.75/sq ft, Oceanside parks-rate claim replaced with the adopted rate.
San Bernardino · Westminster
Published: 28 Oct 2026
Batch 29: 5 new jurisdictions, 11 verified fee items
Atherton, Daly City, Eureka, La Puente, National City. Atherton enters with a $0 town impact-fee program and a $0/$1,860 setback-forked planning fee; Daly City with its $851 ADU planning fee + $281 address assignment; Eureka with $215 + $94 planning lines and $85.30 issuance; National City with $66 issuance and the $700 Sweetwater availability review. La Puente enters with no verified items yet - Rowland USD's $5.17 rate is FY2024-25 only and Hacienda La Puente USD (most of the city) has no published rate - 12/1 re-verification. Held for 12/1 across the batch: all school fees (Atherton PARTIAL feeder adoptions; Daly City rate not found; Eureka not found; National City 2021 rates only), all proportioned impact fees (Daly City $16.10/sq ft AB 1600; Eureka $701/unit DIF; National City TDIF rate not found), and all fixture/meter/EDU-dependent utility dollars.
Atherton · Daly City · Eureka · La Puente · National City
Published: 24 Oct 2026
Correction: impact fees prorated to primary-dwelling size; Ontario areas no longer summed
Methodology correction, not a fee-schedule change. (1) Ontario: General City and Ontario Ranch are mutually exclusive area schedules (Res. 2025-010; Ontario Ranch DIF schedule eff. 7/1/2026) — a parcel pays one, not both. The old $96,171 cliff and $97,507 stack summed both areas at their full per-dwelling bases; both figures are withdrawn. At the 1,600 sq ft default primary, an 800 sq ft ADU now shows General City $18,798 + school $1,336 = $20,134, or Ontario Ranch $29,288 + school $1,336 = $30,624. The calculator has an area selector; jurisdiction and Fee Index pages show the range across areas. (2) Proration: cities that publish a per-dwelling base (not an ADU fee) now prorate as (ADU sq ft / primary sq ft) x base under Gov. Code §66311.5(c)(1)(B), with a new primary-dwelling input in the calculator (1,600 sq ft default, labeled as an assumption). El Monte's encoded $4,087 becomes base $10,217.26 (the $4,087 was the 800/2,000 example; at the default primary an 800 sq ft ADU pays $5,109; the SB 1117 note is recomputed to ~$319 at the same primary, and the Quimby exclusion is flagged unverified for 12/1 review). Lynwood's $2,756 becomes base $4,822.63 (the $2,756 was the 800/1,400 example; at the default primary an 800 sq ft ADU pays $2,411; two further schedule rows totaling $336.70 are under review for ADU applicability). Westminster is now min(prorated $17,179 base, $4,000 cap) instead of a flat $4,000. SB 1117 2027 conversions now cover dwelling-base lines too: ((sqft - 750) / primary) x base. Flat lines whose derivation is genuinely unpublished (including Hayward, a city-published ADU flat fee) stay marked 'conversion not published yet' and are never guessed. (3) Hayward park fee corrected $3,823 to $3,812 per the Adopted FY2025-26 Master Fee Schedule (eff. 7/1/2025); no FY2026-27 schedule was found as of 24 Oct 2026. Note: Fee Index figures previously shared with journalists used the old summed Ontario figures; they are corrected here and on the Fee Index page. Lines whose sources do not state a per-dwelling base are unchanged pending a second-phase source review.
Ontario · El Monte · Lynwood · Westminster · Hayward
Published: 23 Oct 2026
New: SB 1117 permit-now-vs-January comparison in the calculator
The calculator now shows a 2027 preview alongside current impact fees: per-square-foot impact lines scale to the square footage above 750, and flat impact lines are marked where the city has not published a conversion. Only impact fees change; school fees, permit fees, and utility/capacity charges are unchanged, and the rule covers a homeowner's first two ADUs. A companion post draft covers the eight jurisdictions where January savings can be computed at 800 sq ft.
Published: 23 Oct 2026
Correction: 750 sq ft boundary updated to current law (SB 543)
The homepage Hayward example and the 750 sq ft cliff post stated the pre-2026 rule (exempt under 750, charged at 750 and above). Current Gov. Code §66311.5(c)(1), as amended by SB 543 effective January 1, 2026, exempts ADUs of 750 square feet or less; the charge starts above 750. The calculator already applied the current rule, so no fee amounts changed: Hayward is $0 at 750 and $3,823 at 751, and the homepage now carries the through-December-31-2026 qualifier with the SB 1117 change noted. The homepage change log now shows headlines only, with detail on the full log page.
Hayward · Ontario
Published: 23 Oct 2026
Correction: 6 Batch 19-28 items fixed on re-verification
Re-verification of the Batch 19-28 intake against source documents corrected 6 items: Burlingame MEP permits $738 to $729 (FY2024-25 issuance fee is $99, not $102); San Mateo County school fee effective date 2026-04-16 to 2026-06-15 (Resolution 25.26.15 takes effect sixty days after adoption); Buena Park and Newport Beach OC San capacity charges $1,368 to $1,710 (Table A bills per 1,000 sq ft or portion thereof, so an 800 sq ft ADU is one full block); Folsom building permit and processing fee effective dates 2026-01-01 to 2025-07-01 (Resolution 11481 Section A header). Amounts for the Folsom and San Mateo County items are unchanged.
Buena Park · Burlingame · Folsom · Newport Beach · San Mateo County
Published: 21 Oct 2026
Correction: Batch 20/22 changelog wording
Two changelog entries overstated what is in the calculator: Batch 20 named Stanislaus County's $3,061 PFF figure as a headline figure, but $3,061 is the published cap only - the 800 sq ft amount is proportional to the primary dwelling and stays in the research file (the calculator carries the $2,625 permit and the $900 septic fee). Batch 22 credited Corona with a $5.38 school fee; Corona has no verified school item on file. No fee data changed in this correction.
Published: 21 Oct 2026
Fix: calculator scope flags + Milpitas conditional removal + homepage school-count caption
All Batch 19-28 items had descriptive applies_to values (e.g. 'detached ADU') that the fee calculator treats as unsupported, so every new fee page rendered 'Verification in progress' despite verified items on file. All 164 items now carry applies_to 'all' (the calculator's ADU scenario), with the original scope text preserved in notes where it added information. Milpitas's conditional $703 sprinkler review removed (total 165 -> 164 items). Homepage caption 'of 38 jurisdictions' replaced with the computed school-fee jurisdiction count (84).
Published: 21 Oct 2026
Batch 28: 5 new jurisdictions, 11 verified fee items
Claremont, Glendora, Moorpark, San Rafael, Vallejo. Vallejo contributes 5 items; Claremont, Glendora and Moorpark enter with a single planning-side line each (zoning clearance / no-ADU-planning-fee confirmations); San Rafael adds 3.
Claremont · Glendora · Moorpark · San Rafael · Vallejo
Published: 21 Oct 2026
Batch 27: 5 new jurisdictions, 10 verified fee items
Clovis, Covina, Diamond Bar, Folsom, Redondo Beach (HCD ADU-permit ranks #150-154). Folsom's FCUSD Level II school fee, $10.26/sq ft ($8,208 on 800 sq ft), is the matrix's second-highest school rate; Redondo Beach's named ADR-Minor ADU/JADU planning line is $1,970. Clovis (Level II inference) and Diamond Bar (vintage/partial lines) enter with no verified items yet - 12/1 re-verification.
Clovis · Covina · Diamond Bar · Folsom · Redondo Beach
Published: 21 Oct 2026
Batch 26: 5 new jurisdictions, 29 verified fee items
Beverly Hills, Burlingame, Chico, Pacific Grove, Watsonville. Beverly Hills enters with 11 items: valuation-based surcharges only (General Plan maintenance, CBSC, contractor business tax) - its permit-fee-percentage surcharges (plan check 80% of permit fee, etc.) are verified in the research file but held back because the calculator has no percent-of-permit-fee method. Burlingame 6, Chico 5, Watsonville 5, Pacific Grove 2.
Beverly Hills · Burlingame · Chico · Pacific Grove · Watsonville
Published: 21 Oct 2026
Batch 25: 5 new jurisdictions, 17 verified fee items
Bellflower, Newport Beach, Redlands, San Leandro, Walnut. Redlands is the batch's deepest row with 11 items; Bellflower's permit-fee-percentage surcharges (12% + 4% of permit fee) are verified but held back as unrepresentable in the calculator.
Bellflower · Newport Beach · Redlands · San Leandro · Walnut
Published: 21 Oct 2026
Batch 24: 5 new jurisdictions, 6 verified fee items
Buena Park, Paramount, South Pasadena, Vacaville, Yucaipa. The thinnest batch so far: South Pasadena and Vacaville enter with no verified items yet (all lines PARTIAL or vintage - 12/1 re-verification); Buena Park's single item is the OC San ADU capacity charge.
Buena Park · Paramount · South Pasadena · Vacaville · Yucaipa
Published: 21 Oct 2026
Batch 23: 5 new jurisdictions, 12 verified fee items
Fresno, Grover Beach, Inglewood, Milpitas, Monterey County (unincorporated). Monterey County's school line is the Salinas-area SUHSD Level II shared rate, $4.82/sq ft - Salinas pockets only, not countywide; North County differs. Correction (2026-10-21): Milpitas's $703 fire-sprinkler review fee was removed from the count - it is conditional on sprinklers being required, not part of the standard spec.
Fresno · Grover Beach · Inglewood · Milpitas · Monterey County (unincorporated)
Published: 21 Oct 2026
Batch 22: 5 new jurisdictions, 19 verified fee items
Chino, Corona, Monrovia, Sierra Madre, Upland. Upland contributes 7 items, the batch's deepest row; Chino's school fee is at the $5.38 SAB maximum, and Corona's $3,096 sewer capacity fee is its only nonzero line (its school fee remains unverified).
Chino · Corona · Monrovia · Sierra Madre · Upland
Published: 21 Oct 2026
Batch 21: 5 new jurisdictions, 16 verified fee items
Calexico, Los Altos Hills, Montebello, South San Francisco, Stockton. Calexico's Level II school fee, $12.46/sq ft ($9,968 on 800 sq ft), is the matrix's highest school rate; Montebello enters with its single confirmed line, the $330 ADU Review fee.
Calexico · Los Altos Hills · Montebello · South San Francisco · Stockton
Published: 21 Oct 2026
Batch 20: 5 new jurisdictions, 17 verified fee items
Concord, Hillsborough, Napa, South Gate, Stanislaus County (unincorporated) (HCD ADU-permit ranks #115-119). Stanislaus County's $2,625 flat ADU permit is the batch's headline figure; its $3,061 PFF figure is the published cap only - the actual 800 sq ft amount is proportional to the primary dwelling, so it stays in the research file for 12/1 and is not in the calculator. South Gate's $0 ADU connection exemption is codified.
Concord · Hillsborough · Napa · South Gate · Stanislaus County (unincorporated)
Published: 21 Oct 2026
Batch 19: 5 new jurisdictions, 26 verified fee items
Gardena, Moreno Valley, Orange County (unincorporated), San Mateo County (unincorporated), Santa Clara (city) (HCD ADU-permit ranks #110-114). Santa Clara contributes 9 items; unincorporated Orange County pairs a confirmed $0 county DIF with the $1,695 OC San detached-ADU capacity charge.
Gardena · Moreno Valley · Orange County (unincorporated) · San Mateo County (unincorporated) · Santa Clara
Published: 21 Oct 2026
Batch 5 late addition: Rosemead, 1 verified fee item
Rosemead's Batch 5 research was not in the 2026-10-19 deep-dive backfill, so its single confirmed dollar item - the $111 ADU covenant fee (FY 2025-26 fee schedule) - lands now. School, DIF, permit and connection lines remain PARTIAL or not found - 12/1 re-verification.
Rosemead
Published: 19 Oct 2026
Deep-dive backfill: 21 jurisdictions, 75 verified fee items
Backfilled the 21 deep-dive cities whose posts were published but missing from the /compare/ calculator: Alhambra, Campbell, Chula Vista, Downey, Fontana, Fremont, Laguna Beach, Lakewood, Lancaster, Oceanside, Ontario, Oxnard, Pasadena, Salinas, San Bernardino, Santa Ana, Santa Barbara, Santa Monica, Santa Rosa, West Covina, Westminster. CONFIRMED-only: computed examples, ranges, proportional-to-primary figures, and unverifiable items excluded (notably the Oceanside blanket ADU impact exemption, which conflicts with the city's Aug 2025 park DIF nexus draft and needs post-level review). Every item carries a verified official source URL.
Alhambra · Campbell · Chula Vista · Downey · Fontana · Fremont · Laguna Beach · Lakewood · Lancaster · Oceanside · Ontario · Oxnard · Pasadena · Salinas · San Bernardino · Santa Ana · Santa Barbara · Santa Monica · Santa Rosa · West Covina · Westminster
Published: 18 Oct 2026
Batch 18: 5 new jurisdictions, 12 verified fee items
Hemet, Sunnyvale, Marin County, Jurupa Valley, San Fernando (HCD ADU-permit ranks #105–109). Hemet's $8.647/SF DIF ($6,918 on 800 sq ft) is the matrix's steepest 750-sq-ft cliff; Jurupa Valley runs its own DIF program (Ch. 3.75); Marin County shows special-district fragmentation. Proportional-to-primary fees (Jurupa DIF/MSHCP) and track-ambiguous permit tiers held back as PARTIAL.
Hemet · Sunnyvale · Marin County · Jurupa Valley · San Fernando
Published: 18 Oct 2026
Batch 17: 5 new jurisdictions, 9 verified fee items
Pico Rivera, Saratoga, Mountain View, El Cajon, El Dorado County (HCD ADU-permit ranks #100–104). First East County San Diego and El Dorado County coverage; Mountain View's two-district school split ($5.24/sq ft) is the matrix's first; El Dorado County's $1,320 fire fee drops ~94% under SB 1117. Derived/proportional figures (Saratoga elementary $3.72, per-DFU sewer) held back as PARTIAL.
Pico Rivera · Saratoga · Mountain View · El Cajon · El Dorado County
Published: 17 Oct 2026
Batch 16: 5 new jurisdictions, 5 verified fee items
Davis, Temple City, Palmdale, Redwood City, Bakersfield (HCD ADU-permit ranks #95–99). First Yolo County coverage; Redwood City's $1.78/sq ft ADU sewer line is explicit in ordinance; Bakersfield's stacked 2016-dated DIFs held back as PARTIAL. Also merged the duplicate Santa Clara County entry.
Davis · Temple City · Palmdale · Redwood City · Bakersfield
Published: 16 Oct 2026
Batch 15: 5 new jurisdictions, 9 verified fee items
Tracy, Hayward, Coachella, Rancho Cucamonga, Richmond (HCD ADU-permit ranks #89–94). Hayward's $5,295 sewer line is the matrix's first explicit 'all ADUs pay utilities' case.
Tracy · Hayward · Coachella · Rancho Cucamonga · Richmond
Published: 16 Oct 2026
Batch 14: 5 new jurisdictions, 6 verified fee items
San Gabriel, Menlo Park, San Luis Obispo, Santa Clara County, Arcadia (HCD ranks #84–88). Three more districts at the $5.38 school-fee ceiling.
San Gabriel · Menlo Park · San Luis Obispo · Santa Clara County (unincorporated) · Arcadia
Published: 16 Oct 2026
Batch 13: 5 new jurisdictions, 5 verified fee items
Culver City, El Centro, Fountain Valley, Kern County, Los Altos (HCD ranks #78–82). Culver City's $3,818/ADU charge is the matrix's only ADU-specific impact fee.
Culver City · El Centro · Fountain Valley · Kern County (unincorporated) · Los Altos
Published: 15 Oct 2026
Batch 12: 5 new jurisdictions, 10 verified fee items
Alameda (city), Palm Springs, Riverside County, Santa Cruz County, Thousand Oaks.
Alameda (city) · Palm Springs · Riverside County (unincorporated) · Santa Cruz County (unincorporated) · Thousand Oaks
Published: 15 Oct 2026
Batch 11: 5 new jurisdictions, 13 verified fee items
Costa Mesa, La Habra, Orange (city), Piedmont, Simi Valley.
Costa Mesa · La Habra · Orange (city) · Piedmont · Simi Valley
Published: 15 Oct 2026
Batch 10: 5 new jurisdictions, 12 verified fee items
Escondido, La Mesa, Monterey, San Luis Obispo County, San Mateo.
Escondido · La Mesa · Monterey · San Luis Obispo County · San Mateo
Published: 14 Oct 2026
Batch 9: 5 new jurisdictions, 9 verified fee items
Huntington Beach, Los Gatos, Pacifica, Santa Cruz, Whittier.
Huntington Beach · Los Gatos · Pacifica · Santa Cruz · Whittier
Published: 14 Oct 2026
Batch 8: 5 new jurisdictions, 12 verified fee items
Berkeley, Modesto, Monterey Park, Ventura County, Vista.
Berkeley · Modesto · Monterey Park · Ventura County (unincorporated) · Vista
Published: 14 Oct 2026
Batch 7: 5 new jurisdictions, 12 verified fee items
Baldwin Park, El Monte, Livermore, Lynwood, Placer County.
Baldwin Park · El Monte · Livermore · Lynwood · Placer County (unincorporated)
Published: 13 Oct 2026
Batch 6: 7 new jurisdictions, 18 verified fee items
Alameda County, Contra Costa County, Riverside, Sacramento County, San Bernardino County, Santa Barbara County, Sonoma County. Riverside's $1,006 permit is the series low.
Alameda County (unincorporated) · Contra Costa County (unincorporated) · Riverside · Sacramento County (unincorporated) · San Bernardino County (unincorporated) · Santa Barbara County (unincorporated) · Sonoma County (unincorporated)
Published: 8 Oct 2026
Calculator launch: 9 jurisdictions, 24 verified fee items
Anaheim, Burbank, Fullerton, Garden Grove, Glendale, Long Beach, Sacramento, Santa Maria, Torrance. Internal memos stripped; every figure now carries its source.
Anaheim · Burbank · Fullerton · Garden Grove · Glendale · Long Beach · Sacramento · Santa Maria · Torrance