Los Angeles County · California
La Puente ADU Fees in 2026
Every government fee we could verify for an ADU in La Puente, from official sources. Figures below are for an 800 sq ft ADU unless noted.
Every figure links to its official source document. Last verified 9 Nov 2026. Fees are re-verified on a rolling schedule (next full pass Dec 2026). Official fee schedule ↗ How we price →
Verified fees, 800 sq ft ADU
$40
range across areas — Rowland USD $40; your parcel pays one area's schedule, not both
The 750 sq ft cliff
$0*
no verified impact fees on file yet
Fee table
Amounts computed for an 800 sq ft ADU from each item's published rate. "Exempt" lines are $0 by state law at this size. This jurisdiction has two area schedules — a parcel pays one, not both — so both schedules are listed below and the total above is the range across areas, not the sum of all rows. Dwelling-base impact fees are prorated at an assumed 1,600 sq ft primary dwelling; use the calculator to enter your actual primary size.
| Fee | Category | Rate | 800 sq ft | Source |
|---|---|---|---|---|
| Building permit issuance fee (LA County schedule) | Plan check & permits | flat fee | $40 | official doc ↗verified 9 Nov 2026 |
These are the line items we have verified so far — not a complete bill. Site-specific charges (utility laterals, soil work) vary by lot. How we price →
Verified rates — amounts need your project's valuation
These rates are verified from official sources, but the dollar amount depends on your project's valuation, which we don't have on file for La Puente. The table lists the verified rate, the source, and the verification date — no total is computed for these lines, and they are excluded from the total above.
| Fee | Category | Rate | 800 sq ft | Source |
|---|---|---|---|---|
| Plan maintenance fee (2% of building permit fee, LA County schedule) | Plan check & permits | 2% of building permit fee | — | official doc ↗verified 9 Nov 2026 |
| Building permit fee, $100,001+ valuation band (LA County Table 1-A) | Plan check & permits | $1,867.20 + $9.66 per $1,000 over $100,000 valuation | — | official doc ↗verified 9 Nov 2026 |
| Building plan check fee (85% of permit fee, LA County) | Plan check & permits | 85% of permit fee | — | official doc ↗verified 9 Nov 2026 |
| Strong Motion Instrumentation Program fee, residential (LA County) | Plan check & permits | 0.013% of valuation | — | official doc ↗verified 9 Nov 2026 |
| Energy compliance surcharge (10% of permit fee, LA County) | Plan check & permits | 10% of permit fee | — | official doc ↗verified 9 Nov 2026 |
Still verifying
Found in official documents, amounts not yet confirmed — listed without figures until verification completes.
- Site Plan and Design Review (SPDR) - Residential: Single Family Dwelling Project — Planning fees
- Site Plan and Design Review (SPDR) - Admin/Minor Review — Planning fees
- Planning Final Inspection — Planning fees
- Zoning Verification — Planning fees
- Landscape Plan Check/Inspection Deposit — Planning fees
- Certificate of Occupancy (LA County schedule) — Plan check & permits
- Minimum plan check fee for standardized plans (LA County schedule) — Plan check & permits
- School developer fee - Rowland USD (small portion of city) — School fees
- Water capacity charge - 5/8-inch meter (La Puente Valley CWD) — Utility & capacity
- Water capacity charge - 3/4-inch meter (La Puente Valley CWD) — Utility & capacity
- Water capacity charge - 1-inch meter (La Puente Valley CWD) — Utility & capacity
- Water service application fee (La Puente Valley CWD) — water_sewer
What changes on January 1, 2027
Two state laws rewrite parts of this table. SB 1117 (Chapter 809) re-bases covered impact fees for up to two ADUs on only the square footage above 750 — at 800 sq ft, most impact-fee lines shrink to a 50 sq ft basis. School developer fees and water/sewer connection or capacity charges are not covered and do not change. AB 956 (Chapter 791) makes two detached ADUs per single-family lot a ministerial approval. La Puente: 2026 vs 2027, line by line → Details: SB 1117 and the 750 sq ft cliff · AB 956: two ADUs on one lot
Common questions
Are impact fees waived for ADUs under 750 sq ft in La Puente?
Yes. California law (Gov. Code §66311.5) bars local agencies from charging impact fees on ADUs of 750 square feet or less. That applies in La Puente the same as everywhere else in California.
Where do these La Puente ADU fee numbers come from?
Every line item links to the official source document — the city or county fee schedule, the school district's developer-fee resolution, or the utility district's charges — with the date we last verified it. We publish no fee modeled, no fee guessed.
Embed this fee card
Bloggers, realtors, journalists: drop this city's live fee card into your page. Numbers stay current; every figure links back to its source.
<iframe src="https://everylineitem.com/embed/fee-card/?j=LA-PUENTE" width="100%" height="240" style="border:0" loading="lazy" title="La Puente ADU fees"></iframe>