Skip to content
Every Line Item
Go back

48 Days Until California Kills the 750 Sq Ft Cliff

Edit page

Published: 14 Nov 2026 · Last verified: 9 Oct 2026 · Next review: Jan 2027 Cost figures are re-checked against permit records quarterly. Changes are logged in Corrections.

Forty-eight days. On January 1, 2027, California rewrites the most expensive sentence in ADU law — and if your plans are on a drafter’s desk today, the calendar is now a line item in your budget.

This is the kickoff of the SB 1117 countdown. Between now and January 1, we are tracking what cities publish, what stays unconfirmed, and what the timing means for anyone mid-project. Start here: the cliff, the savings, and the decision in front of you.

The cliff, in 60 seconds

The 750 sq ft cliff, explained: state law (Gov. Code §66311.5) bars cities from charging impact fees on ADUs under 750 square feet. At 750 and above, cities could charge fees “proportionate” to the primary dwelling — and many charged the full per-square-foot fee on the entire unit, including the 749 feet that would have been exempt.

That is the cliff: a 749 sq ft ADU pays $0 in impact fees; an 800 sq ft ADU can owe $2,243 (Torrance) to ~$18,090 (Palo Alto). The same 51 square feet, priced at $2,243–~$18,090 depending on your address. Since a 2025 cleanup bill, the 750 is measured in interior livable space.

SB 1117, signed September 29, 2026 (Chapter 809, Statutes of 2026), changes the rule effective January 1, 2027: for a homeowner’s first two ADUs on a lot, impact fees may be imposed only on the livable square footage above 750 — marginal, the way income tax brackets work. An 800 sq ft ADU would owe fees on 50 sq ft, not 800.

The savings table, in one glance

From our SB 1117 savings analysis, applying each city’s published impact-fee rates to 50 sq ft instead of 800. These are our arithmetic from 2026 fee schedules, not city-published 2027 figures — every city must publish its own marginal implementation.

City800 sq ft, 2026 rulesEst. 2027 (marginal)Est. savings
Palo Alto~$18,090~$1,130~$16,960
Anaheim~$10,411~$650~$9,750
Fullerton~$6,411~$400~$6,000
Sacramento~$5,347~$334~$5,013
Glendaleup to $4,700~$295~$4,400
Torrance$2,243.47 flatTBDTBD
Riverside~$1,484~$95~$1,390
Salinas$0$0$0
Oakland$0$0$0

The pattern: the taller the cliff, the bigger the rescue. And two rows that say TBD — because they cannot be estimated from published rates yet.

What 48 days means if you are mid-design today

Forty-eight days is long enough to finish a plan set and short enough to miss a permit window. Three practical questions:

1. Should your plans say 800 or 749? Under 2026 rules, 749 is the cheat code — $0 in impact fees in every city in the state, entirely legal. Under 2027 rules, the 749-vs-800 decision barely matters for impact fees (you would owe on 50 sq ft at most). If your permit issues in December, 749 saves you the cliff. If it issues in January, 800 costs you almost nothing extra. The right answer depends on which side of New Year’s your permit lands.

2. When does your permit actually issue? Permits pulled in 2026 use the old math — nothing in SB 1117 is retroactive. The uncomfortable truth: if your plans show 800 sq ft and your permit issues in December, you pay the full cliff; if it issues in January, you may pay a fraction. That makes permit timing the most expensive scheduling decision in ADU construction right now — worth anywhere from $0 (Salinas) to ~$17,000 (Palo Alto). But delay is not free: construction inflation reprices labor and materials every month, financing carries while you wait, and cities will republish 2027 fee schedules with no guarantee every other line stays flat. Model both paths.

3. What is still unconfirmed? Three items, labeled honestly and queued for our December 1 quarterly re-verification:

Until those resolve, every 2027 dollar figure on this site is a labeled estimate, not a city figure. That is the rule for the whole countdown.

What we are watching

Disclaimer

Legislative summary, not legal advice. Savings figures are our estimates from published 2026 fee schedules; city 2027 implementations are pending and will vary by jurisdiction. Permits pulled in 2026 use 2026 rules. Always verify current fees with your city before budgeting.

Frequently asked questions

When does SB 1117 take effect?

January 1, 2027. SB 1117 (Chapter 809, Statutes of 2026), signed September 29, 2026, has no urgency clause, so the standard January 1 effective date holds. This post was published 48 days out; we will check in on the countdown as implementation schedules publish.

What is the 750 sq ft cliff?

Under current law (Gov. Code §66311.5), ADUs under 750 square feet are exempt from impact fees, but at 750 and above many cities charged the full per-square-foot fee on the entire unit — including the first 750 feet that would have been free. A 749 sq ft ADU pays $0; an 800 sq ft ADU can owe $2,000–~$18,090. SB 1117 narrows the charge to only the square footage above 750 for a homeowner's first two ADUs.

How much will SB 1117 save on an 800 sq ft ADU?

It scales with the cliff's height. Our estimates: Palo Alto ~$16,960, Anaheim ~$9,750, Fullerton ~$6,000, Sacramento ~$5,013, Glendale ~$4,400, Riverside ~$1,390. In Salinas and Oakland, $0 — there was never a cliff. Torrance's flat $2,243.47 has no published per-foot rate, so its new number is unconfirmed. These are our arithmetic from 2026 fee schedules, not city-published 2027 figures.

Should I delay my ADU permit to January 2027?

It depends on your city's cliff height and your timeline. In Palo Alto, the difference could approach $17,000; in Riverside, about $1,390 may not survive two months of delay costs — construction inflation, financing carry, and 2027 fee-schedule changes all cut the other way. Permits pulled in 2026 use the old math. Model both paths with your city's actual numbers rather than assuming delay wins.

New line-item breakdowns and quote-check tips by email

Occasional emails when a new cost breakdown goes up. No contractor leads. Unsubscribe anytime.


Edit page
Share this post:

Previous Post
ADU Fire Sprinklers: When California Requires Them and What They Cost
Next Post
Lancaster ADU Fees 2026: The City That Doesn't Publish Its Permit Fees

Keep reading

Calculate your exact fees →