Tag: california
All the articles with the tag "california".
Oxnard ADU Fees 2026: Ventura County's Coastal Fee Profile
An 800 sq ft detached ADU in Oxnard priced phase by phase — $308,000 floor. Ventura County's coastal HCD #19 city keeps the standard 750 sq ft cliff in ordinance Sec. 15-183, runs permits on a valuation schedule it won't price out per square foot, and splits its $4,136 school fee across two districts.
How to Read Your City's Fee Schedule (Without Calling the Permit Counter)
Every number on this site comes from a city fee schedule — a PDF most homeowners never open. A practical walkthrough of where fee schedules live, how valuation tables and flat fees work, which line items actually apply to ADUs, and why the declared valuation is the number that matters most.
Downey ADU Fees 2026: $0 Impact Fees Under 750 Sq Ft — $4,972 Permits Above It
An 800 sq ft detached ADU in Downey priced phase by phase — $311,000. The series study in split personality: Ordinance 23-1507 waives impact fees under 750 sq ft, but valuation-based permits reach ~$4,972 on an assumed $150,000 valuation. The pre-approved plan program exists in name only — zero plans registered as of July 2026.
ADU Financing Compared: HELOC vs Construction Loan vs Cash-Out Refi
Four ways to fund a $320,000 ADU — HELOC, construction-to-permanent, cash-out refinance, and home equity loan — plus the CalHFA grant that used to cover pre-development. Rate ranges, timelines, and the decision math, with no invented numbers.
Chico ADU Cost 2026: $308,000 Floor — A $5.38 School Fee and a Valuation-Based Seismic Surcharge
An 800 sq ft detached ADU in Chico priced phase by phase — $308,000 floor. The school fee is the $5.38 state maximum from Chico Unified, the ADU permit is a flat $1,460, and a seismic surcharge of 0.013% of valuation adds $41.60. The building permit fee and impact fees are not yet verified, so this total is a floor.
Grover Beach ADU Cost 2026: $305,000 Floor — A $2,984 Permit and a $0 Water Connection
An 800 sq ft detached ADU in Grover Beach priced phase by phase — $305,000 floor. The building permit and plan check come as one flat $2,984 R3 line, the water and sewer connection is $0 on a shared existing service, and the Quimby fee is $0 because it applies only at subdivision. The school fee is not yet verified, so this total is a floor.
San Mateo County ADU Cost 2026: $314,637 Floor, Unincorporated Permit Stack
800 sq ft detached ADU in unincorporated San Mateo County: $314,637 floor built from a full county permit stack, a fire review fee, and a $4,304 school fee. Percentage surcharges are quantified but not counted pending the county's combined-fee worksheet.
Vallejo ADU Cost 2026: $307,000 Floor — The Sewer District Sets the Price
An 800 sq ft detached ADU in Vallejo priced phase by phase — $307,000 floor. The Vallejo Flood & Wastewater District sets the price: a $2,865 sanitary sewer capacity charge for a detached ADU of 800–899 sq ft on the Mainland, plus $580 plan review, $400 inspection, and $61.94 processing. The school fee and the building permit fee are not yet verified, so this total is a floor.
Watsonville ADU Cost 2026: $308,000 Floor — Three $0 Impact Fees, Each with Its Own Threshold
An 800 sq ft detached ADU in Watsonville priced phase by phase — $308,000 floor. Three impact fees are $0, each for its own reason: Public Facilities (detached structures of 1,000 sq ft or less), Affordable Housing In-Lieu (ADUs), and Public Art (under 2,000 sq ft of new floor area or $500,000 valuation). The building permit is $3,655 and plan check $2,448.85. The school fee is not yet verified, so this total is a floor.
Burlingame ADU Cost 2026: $309,000–$310,000 Floor — Water and Sewer Capacity Priced per Square Foot, Basis Unclear
An 800 sq ft detached ADU in Burlingame priced phase by phase — $309,000–$310,000 floor. Water and sewer capacity charges are priced per square foot over 150 sq ft, but the assessable basis is ambiguous, so the total is a range. The school fee and the general building permit are not yet verified, so this total is a floor.
Concord ADU Cost 2026: $313,000–$316,000 Floor — Flat-Band Impact Fees and Six Free Pre-Approved Plans
An 800 sq ft detached ADU in Concord priced phase by phase — $313,000–$316,000 floor. Two impact fees are flat amounts in a 750–1,200 sq ft band, and the tier depends on whether the ADU exceeds 40% of the primary dwelling — so the total is a range. The building permit fee is not yet verified, so this total is a floor. Concord offers six free pre-approved plans with plan-check fees waived.
Corona ADU Cost 2026: $305,000 Floor — Every Impact Fee Is $0
An 800 sq ft detached ADU in Corona priced phase by phase — $305,000 floor, the lowest floor in this series so far. Every impact fee is $0: the DIF Update 2026 leaves the ADU column blank, the county TUMF exempts ADUs program-wide, and Quimby is collected at subdivision. The only fee line is a $3,096 sewer capacity charge. School and permit fees are not yet verified, so this total is a floor.
Moreno Valley ADU Cost 2026: $310,000 — Seven Free Pre-Approved Plans and a $0 TUMF
An 800 sq ft detached ADU in Moreno Valley priced phase by phase — $310,000. TUMF is $0 for an ADU (exempt), the permit package is $3,746 all-in (plan check, inspection, filing), the school fee is $4,304, and the city offers seven free pre-approved plans. The schedule's other impact-fee lines are proportional at 750+ sq ft and not in the total. Water and sewer connection charges are not yet verified.
Napa ADU Cost 2026: $325,000 — A $10,033 Sewer Capacity Charge Tops the Ledger
An 800 sq ft detached ADU in Napa priced phase by phase — $325,000, the highest total in this series so far. The NapaSan sewer capacity charge is $10,032.80 — the largest single verified ADU fee we have published — plus a $2,125 flat building permit, a $4,304 school fee and $6,093 in impact fees. SB 1117 saves $3,562 on the per-square-foot line.
Beverly Hills ADU Cost 2026: $305,000 Floor — $0 Water, $0 Wastewater, and a $1,416 Covenant
An 800 sq ft detached ADU in Beverly Hills priced phase by phase — $305,000 floor. The most expensive city in this series charges $0 for water capacity, $0 for wastewater capacity and $0 for planning on a building-permit-only ADU — but a $1,416 covenant recordation fee. The school fee is not yet verified, so this total is a floor.
Los Altos Hills ADU Cost 2026: $308,000 — Three Impact Fees at $0
An 800 sq ft detached ADU in Los Altos Hills priced phase by phase — $308,000. The town's pathway, recreation in-lieu and storm drainage impact fees are all $0 for an ADU, the school fee is a combined $5.38 from two districts, and the permit column is $1,555.
Redlands ADU Cost 2026: $309,000 Floor — Eight Per-Square-Foot Impact Fees From One Ordinance
An 800 sq ft detached ADU in Redlands priced phase by phase — $309,000 floor. Every impact fee is a per-square-foot line from a single ordinance (Ord. 2968), so the 750 sq ft cliff is clean and the SB 1117 saving is exactly $4,080. School and permit fees are not yet verified, so this total is a floor.
Santa Clara ADU Cost 2026: $313,000 — A Fully Itemised Permit Schedule and $0 Water and Electric
An 800 sq ft detached ADU in Santa Clara priced phase by phase — $313,000. A fully itemised scaled permit schedule ($2,488.80 plan review, $2,309.70 inspection), water and electric connection and capacity at $0 for an ADU, and no impact-fee lines at all.
Upland ADU Cost 2026: $308,000 Floor — A Parks-Heavy DIF Schedule
An 800 sq ft detached ADU in Upland priced phase by phase — $308,000 floor. The Parks DIF at $4.80 per square foot is 61% of all per-square-foot lines, the cliff is published on the city's own ADU page, and the SB 1117 saving at 1,000 sq ft is $5,235. School and permit fees are not yet verified, so this total is a floor.
Which California Cities Waived ADU Fees in 2026
Salinas zeroed out development impact fees. Oakland exempts ADUs from impact fees entirely. Oceanside's waiver could not be confirmed on the city's current page. The waiver trend, city by city — and what it means for your 2027 build.
Do You Need Separate Insurance for Your ADU?
Homeowner endorsement, landlord policy, or builder's risk — which insurance your ADU actually needs, when, and what it costs. The coverage questions to ask before the first tenant moves in.
Riverside County ADU Permit Cost: $6,472 Deposit, $0 County Impact Fees
Unincorporated Riverside County ADU permits: a $6,472.45 deposit (not the final cost), $0 county impact fees by exemption, school fees up to $4,304, and four free pre-approved plans. Incorporated cities have their own schedules.
Palo Alto ADU Fees 2026: The $18,090 Question Mark at 750 Sq Ft
An 800 sq ft detached ADU in Palo Alto priced phase by phase — about $313,000, level with the lowest published total in the series. The steepest per-square-foot 750 cliff we've documented, the most dramatic SB 1117 effect, and an honest correction of our own earlier numbers.
The $12,000 Spread: Ranking 10 California Cities by Total ADU Cost
Same 800 sq ft ADU, ten California cities, $12,000 apart. The master ranking table for the series — Long Beach ($313,000) to San Francisco ($325,000) — and what the spread actually tells you about where fees bite.
Campbell ADU Fees 2026: Two Districts, One $5.38 School Fee
An 800 sq ft detached ADU in Campbell priced phase by phase — about $310,000 at schedule caps. The $5.38/sq ft school fee at the Level I cap (two districts, one parcel), valuation-based permits, and West Valley Sanitation's per-fixture-unit sewer math.
The ADU Permit Clocks: 15 Days, 60 Days, and the Fine Print
Two clocks govern California ADU permits: 15 business days for completeness, 60 days for a decision. The fine print on cure lists, tolling, and the JADU gap.
ADU Solar's Property-Tax Exclusion Ends January 1, 2027
California's solar property-tax exclusion ends January 1, 2027. What counts, what survives a sale, and the 2026 completion trap for ADU solar.
SB 1117: Should You Wait Until January to Permit Your ADU?
From January 1, 2027, impact fees on the first two ADUs on a lot apply only to the area above 750 sq ft. The 800 sq ft savings, city by city, and why flat fees are still unknown.
Sewer, Water, Power: ADU Utility Bills
Capacity charges, connection fees, panel upgrades — the $0 to $10,000 range nobody puts in the quote. Why sewer is the most volatile ADU line.
The 499 Sq Ft Line: One Foot Costs $2,690
School fees turn on one sentence: units under 500 sq ft of interior livable space are exempt. At the 2026 cap of $5.38/sq ft, the 500th foot triggers $2,690.