Since January 2020, California has required solar panels on most new homes. In the 2022 code cycle, the mandate was formally extended to ADUs — and if you are submitting a permit in 2026, you are under the 2025 Title 24 standards that took effect January 1, 2026. The surprise for most homeowners is not the requirement itself. It is how narrow it is: most ADU configurations are exempt, and the ones that are not have five well-defined exceptions.
Which ADUs need solar: the three types
The Title 24 ADU fact sheet (the Energy Code Ace program’s Accessory Dwelling Units fact sheet for the 2022 Energy Code) sorts every ADU into one of three energy-code types, and the photovoltaic requirement applies to exactly one of them:
| ADU type | What it is | PV required? |
|---|---|---|
| New Construction ADU | Detached, not attached to any other structure, entirely new construction | Yes |
| Addition ADU | Converting unconditioned space (e.g., a garage) or adding new conditioned area to an existing building | No |
| Alteration ADU | Converting existing permitted conditioned space (e.g., a bedroom) | No |
So the garage conversion, the basement conversion, and the JADU carved out of existing living space are all classified as alterations or additions — not new construction — and carry no solar mandate. The attached ADU added to the house is likewise an addition. Only the detached unit built from scratch triggers the requirement.
Two edge cases to handle carefully. Manufactured ADUs are regulated under Title 25 (HCD’s factory-built housing program), not the California Building Code — so the Title 24 PV mandate does not apply to them, even though they are “new.” And detached conversions (an existing detached garage turned into an ADU) are treated by industry guides as additions rather than new construction, which would exempt them — but the classification boundary between “new construction” and “addition” for a detached conversion is exactly the kind of question to confirm with your local building department, because enforcement is local.
The five exceptions
Even a new detached ADU can escape the mandate five ways under Title 24, Part 6, §150.1(c)14:
- The 1.8 kW floor. Title 24 sizes the required system as the smaller of two numbers: the Equation 150.1-C result, using the ADU’s conditioned floor area and its California climate zone, and the SARA-based size — 18 watts per square foot of Solar Access Roof Area for a steep roof, 14 watts per square foot for a low-slope roof. If the smaller number is below 1.8 kW, no PV is required at all. Installer guides estimate this floor covers ADUs under roughly 600–700 square feet in most climate zones — treat that as a rule of thumb, not a code citation; the equation, the roof, and your climate zone decide.
- The solar-access exit. No PV is required if the roof offers fewer than 80 contiguous square feet of viable solar area — measured as Solar Access Roof Area (SARA) — because of shading from existing permanent natural or man-made barriers external to the dwelling: trees, hills, adjacent structures. This needs documentation with a CEC-approved solar assessment tool.
- Snow load. No PV is required if the roof cannot support a system under the snow-load provisions of ASCE 7-16, Chapter 7.
- Plans approved before 2020. No PV is required if the building permit application was submitted before January 1, 2020.
- Battery storage. Installing a battery storage system (JA12, at least 7.5 kWh) cuts the required PV size by 25% — but this cannot be combined with the 1.8 kW exception.
The panels themselves do not have to go on the ADU roof. The required kilowatts can be installed anywhere on the property — including as new modules added to the primary home’s existing array — or satisfied through a CEC-approved community solar program. But an existing array by itself does not satisfy the ADU’s requirement: the CEC’s 2025 ADU FAQs answer ‘Can an existing solar PV system be used to satisfy the requirement?’ with a flat ‘No.’ New modules must be added to the existing system, as part of the ADU permit, sized to §150.1(c)14, on the same parcel, and with the utility’s permission.
Battery storage is a separate question. No battery has to be installed — but a newly constructed detached ADU must be built battery-ready under Title 24, Part 6, §150.0(s), if its electrical service is over 125 amps. “Battery-ready” means the wiring for a future battery: interconnection equipment with at least 60 amps of backed-up capacity and at least four battery-supplied branch circuits (covering the refrigerator, lighting near the primary exit, and a sleeping-room outlet), a main panelboard with a 225-amp busbar rating, and space reserved within 3 feet of the main panel for a future transfer switch — or, alternatively, a dedicated 1-inch raceway from the main service to a subpanel for those circuits. Two practical outs: if the ADU’s service is 125 amps or less, the requirement does not apply, and installing a battery satisfies it outright. An ADU fed by a subpanel off the main house does not need its own 225-amp panel, as long as the main panel has the 225-amp busbar rating. Additions and conversions — attached ADUs, garage conversions — are not newly constructed buildings, so §150.0(s) does not reach them. (California Energy Commission, 2025 Energy Code ADU FAQs; 2025 Single-Family BESS Ready.) The solar-ready rule is separate: §110.10(a)1 applies only to newly constructed single-family homes in subdivisions of ten or more units, so it does not reach a new ADU built on an existing parcel.
What it costs: 2026 published figures
ADU-sized solar pricing is not published as its own category, so the honest approach is per-watt figures from 2026 California market data, applied to the 1.8–3.5 kW systems installer guides associate with 600–1,200 sq ft ADUs:
- EnergySage (2026 marketplace data): California averages $2.30/W — about $20,930 for a 9.1 kW system.
- ConsumerAffairs (2026): California averages $2.44/W, with a typical installation at $17,208.
- Qcells (August 2026): California sits at $3.00–$4.00/W, attributing the premium to labor and permitting costs — a 7 kW system at $21,000–$28,000.
Apply those per-watt figures to a 1.8–3.5 kW ADU system and the arithmetic gives roughly $4,100–$14,000 before incentives. Two honest warnings about that band: small systems consistently price higher per watt than the averages above (fixed costs like permitting, design, and the utility interconnection spread over fewer watts), and installer quotes vary more by company than by equipment. Treat the band as a planning number and get the quote.
One market change to factor in: the 30% federal tax credit for purchased residential systems is gone as of late 2025, per EnergySage’s marketplace reporting — installer pricing held roughly flat through the change (median quoted prices rose about 3% from late 2025 to early 2026), but the effective cost to the homeowner rose because the credit disappeared. Any solar payback math written before 2025 needs redoing.
The honest bottom line
For most ADU builders, the solar question resolves in one step: if the ADU is a conversion or an addition, there is no mandate, and the panels are a voluntary investment with a roughly 7-year payback in California at current rates. If it is a new detached unit, run the Title 24 equation — under ~600–700 sq ft you may fall below the 1.8 kW floor and owe nothing; above it, budget roughly $4,000–$14,000 for 4 to 8 panels, and remember they can go on the main house’s roof instead. Either way, the requirement is one line in your Title 24 report, not a reason to redesign the project.
Disclaimer
Energy-code summary, not legal or engineering advice. Title 24 is updated on a three-year cycle and local jurisdictions enforce it; confirm PV requirements, exemptions, and system sizing in your project’s Title 24 compliance report before budgeting.