Three doors into the same outcome — a second housing unit on your lot. Three completely different cost structures.

This page synthesizes our three existing deep-dives — the 800 sq ft detached ADU ($320,000), the garage conversion ($190,000), and the JADU (no published total, by honest design) — into one decision table.

The comparison

Detached ADUGarage conversionJADU
Size800 sq ft (new)~450 sq ft (existing shell)≤500 sq ft (inside house)
Build cost$320,000 ($400/sq ft)$190,000 ($422/sq ft)Not published¹
Impact fees$0–$10,411 (city-dependent; $0 under 750 sq ft)$0 (under 750 sq ft)$0 (by law)
School fees$1,792–$4,320~$2,155 (450 sq ft × rate)$0 (by law)
Utility connections$0–$10,000+ (city-dependent)Usually $0 (existing service)$0 (by law)
ParkingNone required (state law)None requiredNone required
Timeline9–14 months (permit + build)6–10 months3–6 months
Rental income (LA)~$2,400/mo (2BR)~$1,600/mo (1BR)~$1,200/mo (studio)
Can sell separatelyOnly with AB 1033 ordinanceOnly with AB 1033 ordinanceNo

¹No public agency publishes JADU construction costs. We do not invent one — see our JADU post for the honest structure.

Why the per-square-foot lies

The garage conversion costs $422/sq ft — more per foot than the detached ADU’s $400. That number misleads. Conversions concentrate money in the expensive phases (systems, interior) while skipping the cheap ones (foundation, envelope). You pay more per foot for fewer feet. The total — $190,000 vs $320,000 — is what your bank account feels.

The JADU inverts this further: nearly every fee line is $0, three of six construction phases nearly vanish, and the remaining cost concentrates in kitchen, bath, and electrical inside walls that already exist.

The real tradeoffs

Choose detached ADU when: you want maximum rental income, a separate sellable asset (where AB 1033 applies), and full design freedom. It costs the most and returns the most.

Choose garage conversion when: you have an underused garage, want the lowest total outlay for a real one-bedroom unit, and can live without covered parking. Watch for: slab condition, ceiling height (7’6” minimum), and whether the garage shares a wall that complicates fire separation.

Choose JADU when: speed and minimal cost matter most, you can sacrifice a bedroom inside the house, and you accept the 500 sq ft cap and no-short-term-rental rule. It is the only option where the fee schedule reads $0 down the entire column.

The bottom line

$320,000, $190,000, or “no published total but nearly everything is $0” — the cheapest way to add a unit depends on what you are optimizing for. Total outlay: JADU. Rental income per dollar: detached ADU. Speed: JADU. Flexibility: detached. There is no universal winner, which is why the table exists.

New line-item breakdowns and quote-check tips by email

Occasional emails when a new cost breakdown goes up. No contractor leads. Unsubscribe anytime.


Edit page
Share this post:

Previous Post
400 sq ft ADU Cost in California: Why Smaller Is Not Cheaper (2026)
Next Post
San Bernardino ADU Fees 2026: The Clearest 750 Sq Ft Cliff in California Code