Published: 2 Nov 2026 · Last verified: 10 Nov 2026 · Next review: Jan 2027 Cost figures are re-checked against permit records quarterly. Changes are logged in Corrections. Corrected 4 Nov 2026: permit example, impact-fee cap, and soft-cost total revised to the FY 2027 schedule (see Corrections). Corrected 10 Nov 2026: school fee corrected to $5.38/sq ft combined ($4,304 on 800 sq ft) — the district’s Fee Justification Report governs over its webpage listing (see Corrections).
Two school districts tax the same 800 sq ft ADU in Campbell, and together they charge $5.38 per square foot — $4,304 total, exactly the Level I cap. Campbell Union (K-8) takes $3.77; Campbell Union High takes $1.61. One parcel, two resolutions, one combined bill. Pasadena, by contrast, charges $2.24. The same ADU, the same state, a $2,512 school-fee gap drawn entirely by district boundaries.
Campbell sits in the heart of Silicon Valley, and its fee structure reads like it: valuation-based permits (the city’s cut scales with what you build), per-fixture-unit sewer math from a separate sanitation district, and a county-level pre-approved plan gallery instead of a city-run program. Our six-phase total lands at about $310,000, or roughly $387 per square foot, when soft costs are taken at their schedule caps — with the sewer line carrying the widest uncertainty in the series.
The short answer
| 800 sq ft detached ADU · Campbell · 2026 | Amount |
|---|---|
| Total build cost (see assumptions) | ~$310,000* |
| Cost per square foot | ~$387* |
| Highest line in the series | School fee, $4,304 |
| Widest uncertainty | Sewer, $0–$7,751 [to verify] |
Phase 1 — Soft costs: the Campbell ledger
| Line item | Amount | Source / note |
|---|---|---|
| School fee — Campbell Union (K-8) | $3,016 | $3.77/sq ft × 800; campbellusd.org (Fee Justification Report, Mar 17, 2026) |
| School fee — Campbell Union High | $1,288 | $1.61/sq ft × 800; CUHSD 5/7/2026 approval |
| School fee combined | $4,304 | $5.38/sq ft — Level I cap |
| Building permit + plan check | $2,880 | 2.00% of $100K valuation + 33% plan check + General Plan 0.16% + technology 0.04% + training 0.02%; FY 2027 schedule |
| Permit add-ons (Title 24, seismic, SB 1473) | $254 | Title 24 plan check $237 + seismic $13 (Category 1, $100K valuation) + SB 1473 $4; FY 2027 schedule |
| Construction license tax | $400 | $0.50/sq ft × 800; Campbell Municipal Code 3.40 |
| Impact fee — Park In-Lieu (ADU ≥ 750 sq ft) | Up to $9,328* | Per-unit cap, calculated per state law; JADU $0; FY 2027 schedule (FY 2026 cap was $9,129) |
| Sewer — WVSD connection | Up to $6,727* [to verify] | $567.68/drainage fixture unit; FY 2024-25 rates — district’s current schedule not located |
| Sewer — WVSD capacity | Up to $1,024* [to verify] | $86.42/fixture unit treatment capacity; FY 2024-25 rates — district’s current schedule not located |
| Soft cost subtotal (verified core) | $7,838 | School + permit lines + construction tax |
| Soft cost subtotal (at schedule caps) | $24,917* | Core + impact cap + sewer caps |
Phases 2–6 (construction) are carried from the series baseline at approximately $285,000; Campbell does not publish phase-level construction costs. Baseline $285,000 + soft costs at caps $24,917 ≈ $310,000.
The city’s fee lines are also listed on the Campbell fee page, with verification status and source links.
* Assumptions: $100,000 construction valuation for permit example (illustrative, not official); 800 sq ft ADU with standard fixture count; FY 2027 fee schedule (effective July 1, 2026); Cambrian/Moreland district parcels excluded. Sewer actual depends on fixture count — a full bath + kitchen ADU lands mid-range, not at the cap — and the sewer rates are carried from FY 2024-25 figures pending verification against the district’s current schedule. The impact fee is proportional under state law, so the $9,328 cap is a ceiling, not the expected bill.
Why Campbell stands out
The $5.38 school fee. Two districts, two fee resolutions, one parcel. Campbell Union School District charges $3.77/sq ft for residential ADUs over 750 sq ft; Campbell Union High School District charges $1.61. Combined: $5.38 — the Level I cap, matching the $5.38 tier (Long Beach, Torrance, Anaheim, Fullerton). Campbell reaches the ceiling through two districts, not one. Verify your parcel’s district: parts of Campbell fall under Cambrian or Moreland, with different rates.
Valuation-based permits with a construction tax. Campbell’s FY 2027 schedule (effective July 1, 2026) prices building permits at 2.00% of the first $500,000 of valuation, plus 33% for plan check, plus small add-ons (General Plan maintenance 0.16%, technology 0.04%, training 0.02%). On a $100,000 valuation that core is $2,000 + $660 + $160 + $40 + $20 = $2,880; Title 24 plan check ($237), seismic ($13), and SB 1473 ($4) add $254, for $3,134 in permit lines. On top: a construction license tax of $0.50 per square foot — $400 on our ADU, a line item most cities bury or skip. Permit-related lines total $3,534. The earlier version of this post showed $3,529 for the permit example and $3,929 all-in; both figures are withdrawn — their $649 remainder did not reconcile with the schedule’s published add-ons. Note also that the FY 2026 schedule’s cover resolution was #13333, not #13279 as previously cited, and the city’s site now lists only the FY 2026-27 schedule; the FY 2026 document link is no longer live.
The sewer district problem. Campbell’s sewer isn’t the city’s — it’s West Valley Sanitation District, with its own board, its own rate schedule, and per-fixture-unit math. $567.68 per drainage fixture unit (capped at $6,727) plus $86.42 per unit of treatment capacity (capped at $1,024). A typical 800 sq ft ADU with one full bath and a kitchen won’t hit the caps, but the meter is running per fixture in a way no flat-fee city replicates. WVSD’s permit must be in hand before the city issues the building permit — a sequencing detail that has delayed projects. [To verify: the district’s current published schedule could not be located; these rates are carried from FY 2024-25 figures.]
The county gallery. Instead of a city-run pre-approved plan program, Campbell points to the Santa Clara County ADU Plans Gallery — a 16-jurisdiction collaborative with free and low-cost designs. It’s a different model from Pasadena’s city-designed free plans: broader catalog, less city-specific pre-review.
The 750 sq ft cliff
Standard §66311.5 application: under 750, all three city impact fees are $0; at 800, they’re proportional to the primary dwelling, with the published Park In-Lieu cap at $9,328 per unit (FY 2027 schedule). The school fee has its own threshold question — Campbell Union’s rate table says “over 500 sq. ft.” while its “Who Pays” section says “exceeding 750 square feet”; at 800 sq ft both wordings give the same $3.77 rate, but the district page’s mixed wording is worth flagging for smaller units.
The bottom line
Campbell is the series’ fee-maximalist: a school fee at the Level I cap reached through two districts, valuation-based permits with a per-square-foot construction tax, and the most granular sewer math in the data. At ~$310,000 at schedule caps, it sits near the top of the series — but built from entirely different parts. In Silicon Valley, even the school districts charge Silicon Valley prices.