Chico’s ledger is built on the school fee. Chico Unified’s Level I rate is the $5.38 state maximum, effective July 19, 2026 — $4,304 on 800 sq ft, the largest single verified fee line in the post. The rest of the stack is small and specific: a flat $1,460 ADU permit for a new detached structure, a $282 energy plan-check minimum, and a seismic surcharge of 0.013% of valuation — $41.60 on the $320,000 series-model valuation. The city water connection is $0 because Cal Water serves Chico and no new meter is required. Our six-phase total lands at $308,000, or $385 per square foot — but it is a floor, not a finished figure. The building permit fee and impact fees are not yet verified, so they are not in the total at all.
The $1,460 ADU permit is a planning fee, not the building permit — the building permit itself has no verified row on file, and neither does any impact fee. Those are real costs a homeowner will pay; this ledger names them rather than guessing at them. Construction phases 2–6 are carried from the Los Angeles County baseline; Chico does not publish phase-level construction costs.
The short answer
| 800 sq ft detached ADU · Chico · 2026 | Amount |
|---|---|
| Total build cost (floor — see gaps) | $308,000 |
| Cost per square foot | $385 |
| Largest single line | Systems + interior, $147,000 |
| Building permit + plan check | Not verified (gap) |
| ADU permit (planning, new detached) | $1,460 |
| Energy plan check (minimum) | $282 |
| Seismic surcharge | $41.60 |
| School district fee (Chico USD) | $4,304 |
| Impact fees | Not verified (gap) |
| City water connection | $0 |
| Pre-approved ADU plans | None found |
The full line-item breakdown
Six phases. The same six used on every build in this series. Illustrations (not quotes).
| Phase | Cost | Share |
|---|---|---|
| Soft costs (design, permits, fees) | $20,000 | 6% |
| Site work + foundation | $38,000 | 12% |
| Framing + structure | $48,000 | 16% |
| Building envelope | $42,000 | 14% |
| Systems + interior | $147,000 | 48% |
| Landscaping & hardscape | $13,000 | 4% |
| Total | $308,000 | $385 / sq ft |
The fee autopsy
Every fee line we found, with exactly what it is and where it came from.
| Fee line | Amount | Source / status |
|---|---|---|
| Design & engineering | $14,000 | Series baseline, carried — no free pre-approved plans on file for Chico |
| School developer fee, Chico Unified (Level I) | $4,304 | $5.38/sq ft × 800 — Chico USD official School Impact Fees page, effective 7/19/2026; assessable space over 500 sq ft |
| ADU permit, new detached structure | $1,460 | FY2026/2027 Master Fee Schedule: planning fee for a new detached ADU (up from $1,207 in FY2025/2026) |
| Energy plan check fee (minimum) | $282 | FY2026/2027 Master Fee Schedule: minimum for up to 2 residential units |
| Seismic safety surcharge | $41.60 | 0.013% of established construction valuation (Public Resources Code §2705), residential occupancies 3 stories or fewer — computed on the $320,000 series-model valuation |
| City water connection fee | $0 | No city water utility — Cal Water Chico District serves the city; city ADU standards state no additional water meter is required unless the applicant requests one |
| Building permit + plan check | not verified | No verified building-permit row on file for Chico — not in the total |
| Impact fees | not verified | No verified impact-fee row on file for Chico — not in the total |
Soft costs in the breakdown table are rounded to $20,000 (exact $20,087.60); the total is rounded to the nearest $1,000.
The city’s fee lines are also listed on the Chico fee page, with verification status and source links.
The school fee carries the ledger
The school fee is 70% of the verified fee stack — $4,304 of $6,087.60 — which makes Chico the rare post where the district, not the city, sets the price. The rate is the $5.38 state maximum, adopted by Chico Unified and effective July 19, 2026, and it applies in full at 800 sq ft because the assessable space is over 500 sq ft. There is nothing proportional or banded about it: $5.38 times 800, verified from the district’s own page.
The small lines are worth naming because two of them are unusual. The seismic surcharge is computed on valuation, not on square footage — 0.013% of established construction valuation under Public Resources Code §2705 — so it moves with the project’s valuation rather than its size. The $41.60 here uses the $320,000 series-model valuation; the city’s own established valuation for a specific project could move this line by a few dollars either way. And the $282 energy plan check is a minimum, not a computed figure: the schedule prices it for up to two residential units, and this ADU is one.
Two gaps that matter
This total is a floor, and the two gaps are the reason. We have no verified building permit or plan-check fee for Chico — the $1,460 ADU permit is a planning fee, and the building permit itself is a separate, unpriced line. We have no verified impact fee either — no row on file at all, so this post claims nothing about Chico’s impact fees, $0 or otherwise. Both are real costs a homeowner will pay; neither is in the $308,000. When they are verified, this post will be updated and the total will rise.
The $308,000 also carries one soft footnote. The seismic surcharge is computed on the series-model valuation of $320,000. If the city’s established valuation for a real project differs, the $41.60 moves with it — by dollars, not by thousands — and the total barely notices.
Chico vs. Los Angeles County
| Chico | LA County baseline | |
|---|---|---|
| Total | $308,000 (floor) | $320,000 |
| Per sq ft | $385 | $400 |
| Building permit + plan check | Not verified | carried |
| ADU permit (planning) | $1,460 | carried |
| Impact fees | Not verified | carried |
| School fee | $4,304 | $4,304 |
| Water connection | $0 | carried |
| Pre-approved ADU plans | None found | none |
The $12,000 gap to the baseline is the missing lines, not a cheaper build. The school fee already matches the baseline exactly, and the water connection is $0 in both. When the building permit and impact fees are verified, this total will rise — likely past the baseline if the permit lands near the series norm. The real story is the composition: a district-set school fee carrying 70% of the verified stack, and a ledger that is honest about what it does not yet know.
The ADU law box
Three state rules frame every number above. Under Government Code §65852.2(f)(3)(A), a local agency may not impose impact fees on an ADU under 750 square feet; at 750 or above, fees are charged proportionately to the primary dwelling’s size. Under §66311.5 (SB 1117, effective January 1, 2027), per-square-foot impact fees on two or fewer ADUs are charged only on the area above 750 square feet — 50 square feet on this 800 sq ft benchmark — and connection and capacity charges are excluded from that rule. School fees are a separate statute: under SB 543, ADUs under 500 square feet pay $0 in school fees, and at 800 square feet the full district rate applies. SB 1117 does not reduce school fees, and it does not change any line counted in this post: no impact fee is counted, and the school fee is untouched by SB 1117.
A note on SB 1117
Signed September 2026, effective January 2027: for a homeowner’s first two ADUs, impact fees may apply only to square footage above 750, calculated marginally. No impact fee is counted in this ledger, so SB 1117 changes nothing we can compute here — there is nothing to reduce. See the full comparison at Chico: 2026 vs 2027, line by line. School fees, permit fees and the water connection are outside SB 1117’s impact-fee definition and do not change.
What this post does not claim
It does not claim the building permit is $0 — it is unverified and excluded; the $1,460 ADU permit is a planning fee, not the building permit. It does not claim Chico’s impact fees are $0 — no impact-fee row is on file, so this post claims nothing about them. It does not claim the seismic surcharge is exactly $41.60 for every project — it is computed on the series-model valuation, and the city’s established valuation could move it by a few dollars. Construction phases 2–6 are the series baseline, not Chico bids.
Disclaimer
Model estimate, not a quote. Fees change; the assumptions above are the city’s to confirm — the building permit fee and impact fees are not yet verified and are marked where they appear. Always verify current fees with the City of Chico before budgeting.
Sources
- Chico Unified School District, School Impact Fees — $5.38/sq ft residential, effective 7/19/2026. https://www.chicousd.org/Departments/Business-Services/Quick-Reference/School-Impact-Fees/index.html
- City of Chico, FY2026/2027 Master Fee Schedule (updated 7/6/2026) — ADU permit $1,460 (new detached); energy plan check minimum $282; seismic surcharge 0.013% of valuation. https://catapultfilemanager-prod.s3.us-west-2.amazonaws.com/e12a7475-6d0d-4986-a8bb-538a9e5496e0/FY%202026-2027%20MASTER%20FEE%20SCHEDULE%20-%20Updated%2007-06-2026.pdf
- California Water Service, Chico District — Cal Water serves the city; city ADU standards state no additional water meter is required unless the applicant requests one. https://www.calwater.com/district/chico/
Last updated: 8 Nov 2026