Redlands ADU Cost 2026: $309,000 Floor — Eight Per-Square-Foot Impact Fees From One Ordinance

Edit page

In this series

Every build below uses the same six-phase ledger, so you can compare any two directly.

New construction

Geography

Compare any two builds side by side →

Published: 7 Nov 2026 · Last verified: 7 Nov 2026 · Next review: Feb 2027 Cost figures are re-checked against permit records quarterly. Changes are logged in Corrections.

Redlands prices its ADU impact fees the way a grocer prices produce: by the pound, line by line, all from one document. Eight per-square-foot lines, one ordinance (Ord. 2968), $5.4405 per square foot in total — $4,352 on an 800 sq ft ADU. No flat fees, no pro-rata against the primary dwelling, no percentage of valuation. Every line carries a 751 sq ft minimum in the data, which means the 750 sq ft cliff is written into the fee schedule itself: build at 750 or under and all eight lines are $0. Our six-phase total lands at $309,000, or $386 per square foot — but it is a floor, not a finished figure. The school district fee and the building permit and plan-check fees are not yet verified, so they are not in the total at all.

The water lines are the surprise second act. Redlands charges $2.3657 per square foot for water capital improvements plus $0.6633 for water stocks and rights — $2,424 on our example — which is more than half the impact-fee total. Sewer adds $0.2696 per square foot ($216). Water and sewer together come to $2,640, the largest utility bill in this series so far for an 800 sq ft ADU. Construction phases 2–6 are carried from the Los Angeles County baseline; Redlands does not publish phase-level construction costs.

The short answer

800 sq ft detached ADU · Redlands · 2026Amount
Total build cost (floor — see gaps)$309,000
Cost per square foot$386
Largest single lineSystems + interior, $147,000
Building permit + plan checkNot verified (gap)
Impact fees (8 lines, Ord. 2968)$4,352
School district feeNot verified (gap)
Water / sewer$2,640
Pre-approved ADU plansNone found

The full line-item breakdown

Six phases. The same six used on every build in this series.

PhaseCostShare
Soft costs (design, permits, fees)$21,0007%
Site work + foundation$38,00012%
Framing + structure$48,00016%
Building envelope$42,00014%
Systems + interior$147,00048%
Landscaping & hardscape$13,0004%
Total$309,000$386 / sq ft

The fee autopsy

Every fee line we found, with exactly what it is and where it came from.

Fee lineAmountSource / status
Design & engineering$14,000Series baseline, carried — no pre-approved ADU plan program found in city materials (absence not officially confirmed)
Open Space and Parks Fee$943.52$1.1794/sq ft × 800 — Ord. 2968, min. 751 sq ft
Library Fee$479.76$0.5997/sq ft × 800 — Ord. 2968, min. 751 sq ft
Storm Drain Facilities Fee$409.04$0.5113/sq ft × 800 — Ord. 2968, min. 751 sq ft
Public Facilities Fee$571.60$0.7145/sq ft × 800 — Ord. 2968, min. 751 sq ft
Fire Protection Facilities Fee$360.24$0.4503/sq ft × 800 — Ord. 2968, min. 751 sq ft
Police Facilities Fee$415.76$0.5197/sq ft × 800 — Ord. 2968, min. 751 sq ft
Transportation System Improvements Fee$1,116.32$1.3954/sq ft × 800 — Ord. 2968, min. 751 sq ft
Solid Waste Capital Improvement Fee$56.16$0.0702/sq ft × 800 — Ord. 2968, min. 751 sq ft
Impact fees, subtotal$4,352.40$5.4405/sq ft × 800 — eight lines, all Ord. 2968
Sewer Capital Improvement Fee$215.68$0.2696/sq ft × 800 — Ord. 2968, min. 751 sq ft
Water Capital Improvement Fee$1,892.56$2.3657/sq ft × 800 — Ord. 2968, min. 751 sq ft
Acquisition of Water Stocks and Water Rights Fee$530.64$0.6633/sq ft × 800 — Ord. 2968, min. 751 sq ft
School district feenot verifiedNo verified school-fee row on file for Redlands — not in the total
Building permit + plan checknot verifiedNo verified permit row on file for Redlands — not in the total

Soft costs in the breakdown table are rounded to $21,000 (exact $20,992); the total is rounded to the nearest $1,000.

The city’s fee lines are also listed on the Redlands fee page, with verification status and source links.

Eight lines, one ordinance, one cliff

Every city in this series charges ADU impact fees, and most of them scatter the lines across several documents and several methods — flat, per-square-foot, pro-rata, percentage of valuation. Redlands puts all eight in Ordinance No. 2968, all per-square-foot, all with a 751 sq ft minimum. Open Space and Parks ($1.1794) and Transportation ($1.3954) together are $2.5748 per square foot — 47% of the $5.4405 total. The smallest line, Solid Waste at $0.0702, is $56.16 on our example: real money, but barely a rounding error against the whole.

The practical effect is a clean cliff. State law (Gov. Code §66311.5) already zeroes impact fees at 750 sq ft or less, but in most cities the cliff has to be assembled from a mix of flat and per-square-foot lines, some of which need converting. In Redlands the ordinance does the work: every line starts at 751 sq ft. Build at 750 and the impact-fee total is $0; build at 800 and it is $4,352.40. There is no ambiguity to argue with the counter about.

Water is the second-biggest fee

The water lines deserve their own paragraph because they are easy to miss and hard to ignore. Water Capital Improvement ($2.3657/sq ft) is the single largest per-square-foot rate in Redlands after Transportation — and the Acquisition of Water Stocks and Water Rights fee ($0.6633/sq ft) is a line no other city in this series charges. Together they are $2,423.20 on 800 sq ft. Add the Sewer Capital Improvement fee ($215.68) and water and sewer come to $2,638.88 — the largest utility bill we have published for an 800 sq ft ADU.

Unlike impact fees, water and sewer charges are not covered by SB 1117. Connection and capacity charges stay as the city sets them, and the 750 sq ft cliff does not apply to them. The 2027 rule changes the impact-fee column only.

Two gaps that matter

This total is a floor, and the two gaps are the reason. We have no verified school district fee for Redlands: the Redlands Unified School District rate is not in our data, and at the $5.38 state maximum it would add $4,304. We have no verified building permit or plan-check fee either — no rate table, no flat fee, nothing to price. Both are real costs a homeowner will pay; neither is in the $309,000. When they are verified, this post will be updated and the total will rise.

Redlands vs. Los Angeles County

RedlandsLA County baseline
Total$309,000 (floor)$320,000
Per sq ft$386$400
Building permit + plan checkNot verifiedcarried
Impact fees$4,352 (8 lines, Ord. 2968)carried
School feeNot verified$4,304
Water / sewer$2,640carried
Pre-approved ADU plansNone foundnone

The $11,000 gap to the baseline is the two missing fees, not a cheaper build. If the school fee lands at the $5.38 maximum and the permit fees land near the series norm, Redlands will sit at or above the baseline. The real story is the composition: the cleanest impact-fee schedule in the series, the heaviest water bill, and a total that is honest about what it does not yet know.

A note on SB 1117

Signed September 2026, effective January 2027: for a homeowner’s first two ADUs, impact fees may apply only to square footage above 750, calculated marginally. Redlands is the cleanest case in the series for this rule — every impact line is per-square-foot, so the 2027 saving is exactly 750 × $5.4405, about $4,080 on an 800 sq ft ADU. See the full comparison at Redlands: 2026 vs 2027, line by line. School fees, permit fees and water/sewer charges are outside SB 1117’s impact-fee definition and do not change.

Disclaimer

Model estimate, not a quote. Fees change; the assumptions above are the city’s to confirm — the school district fee and the building permit and plan-check fees are not yet verified and are marked where they appear. Always verify current fees with the City of Redlands before budgeting.

Frequently asked questions

How much does an ADU cost in Redlands in 2026?

About $309,000 for an 800 sq ft detached, single-story, new-construction unit with mid-grade finishes in Redlands — roughly $386 per square foot. That total is a floor: the school district fee and the building permit and plan-check fees are not yet verified, so they are not in the total. Construction phases 2–6 are carried from the Los Angeles County baseline; Redlands does not publish phase-level construction costs.

What impact fees does Redlands charge on an ADU?

Eight per-square-foot lines from a single ordinance (Ord. 2968), totalling $5.4405 per square foot — $4,352 on 800 sq ft. Open Space and Parks is the largest at $1.1794 per square foot, followed by Transportation at $1.3954. Every line carries a 751 sq ft minimum, so an ADU of 750 sq ft or less pays $0 on all eight under Gov. Code §66311.5.

How much does SB 1117 save on an ADU in Redlands?

From January 1, 2027, impact fees apply only to the square footage above 750. On an 800 sq ft ADU the saving is 750 × $5.4405 — about $4,080. Because every impact line is per-square-foot, the saving is exact: no flat fee needs converting. School fees, permit fees and water/sewer charges are outside SB 1117 and do not change.

New line-item breakdowns and quote-check tips by email

Occasional emails when a new cost breakdown goes up. No contractor leads. Unsubscribe anytime.


Edit page
Share this post:

Previous Post
Santa Clara ADU Cost 2026: $313,000 — A Fully Itemised Permit Schedule and $0 Water and Electric
Next Post
Los Altos Hills ADU Cost 2026: $308,000 — Three Impact Fees at $0

Keep reading

Calculate your exact fees →