Published: 7 Nov 2026 · Last verified: 7 Nov 2026 · Next review: Feb 2027 Cost figures are re-checked against permit records quarterly. Changes are logged in Corrections.
Upland’s impact fees are a parks budget with four other lines attached. Parks DIF: $4.80 per square foot — 61% of all per-square-foot lines combined, and more than six times the next-largest line (Storm Drain at $0.90). The five DIF lines total $6.98 per square foot, $5,584 on an 800 sq ft ADU. Water adds $0.87 and sewer $0.05 per square foot, $736 together. Our six-phase total lands at $308,000, or $385 per square foot — but it is a floor. The school district fee and the building permit and plan-check fees are not yet verified, so they are not in the total at all.
The cliff is published where a homeowner can actually find it: the city’s own ADU page, uplandadu.org/permit, lists every line with a 750 sq ft minimum. Build at 750 or under and all five DIF lines are $0. Construction phases 2–6 are carried from the Los Angeles County baseline; Upland does not publish phase-level construction costs.
The short answer
| 800 sq ft detached ADU · Upland · 2026 | Amount |
|---|---|
| Total build cost (floor — see gaps) | $308,000 |
| Cost per square foot | $385 |
| Largest single line | Systems + interior, $147,000 |
| Building permit + plan check | Not verified (gap) |
| Impact fees (5 DIF lines) | $5,584 |
| School district fee | Not verified (gap) |
| Water / sewer | $736 |
| Pre-approved ADU plans | None found |
The full line-item breakdown
Six phases. The same six used on every build in this series.
| Phase | Cost | Share |
|---|---|---|
| Soft costs (design, permits, fees) | $20,000 | 6% |
| Site work + foundation | $38,000 | 12% |
| Framing + structure | $48,000 | 16% |
| Building envelope | $42,000 | 14% |
| Systems + interior | $147,000 | 48% |
| Landscaping & hardscape | $13,000 | 4% |
| Total | $308,000 | $385 / sq ft |
The fee autopsy
Every fee line we found, with exactly what it is and where it came from.
| Fee line | Amount | Source / status |
|---|---|---|
| Design & engineering | $14,000 | Series baseline, carried — no pre-approved ADU plan program found in city materials (absence not officially confirmed) |
| DIF General Facilities | $624 | $0.78/sq ft × 800 — uplandadu.org/permit, min. 750 sq ft |
| DIF Police | $344 | $0.43/sq ft × 800 — uplandadu.org/permit, min. 750 sq ft |
| DIF Parks | $3,840 | $4.80/sq ft × 800 — uplandadu.org/permit, min. 750 sq ft |
| DIF Transportation | $56 | $0.07/sq ft × 800 — uplandadu.org/permit, min. 750 sq ft |
| DIF Storm Drain | $720 | $0.90/sq ft × 800 — uplandadu.org/permit, min. 750 sq ft |
| Impact fees, subtotal | $5,584 | $6.98/sq ft × 800 — five lines, all uplandadu.org/permit |
| DIF Water | $696 | $0.87/sq ft × 800 — uplandadu.org/permit, min. 750 sq ft |
| DIF Sewer | $40 | $0.05/sq ft × 800 — uplandadu.org/permit, min. 750 sq ft |
| School district fee | not verified | No verified school-fee row on file for Upland — not in the total |
| Building permit + plan check | not verified | No verified permit row on file for Upland — not in the total |
Soft costs in the breakdown table are rounded to $20,000 (exact $20,320); the total is rounded to the nearest $1,000.
The city’s fee lines are also listed on the Upland fee page, with verification status and source links.
Parks is 61% of the per-square-foot total
The Parks DIF is the story of this post. At $4.80 per square foot it is 61% of the $7.90 per square foot total of all per-square-foot lines — and 69% of the $6.98 impact-fee lines alone. On 800 sq ft it is $3,840, more than the other four DIF lines combined ($1,744) and more than five times the water and sewer lines together ($736). A homeowner building an ADU in Upland is, in fee terms, mostly buying parkland.
The comparison that makes the point is Redlands, published the same day: eight impact lines totalling $5.4405 per square foot, with the largest single line (Transportation at $1.3954) at 26% of the total. Upland has five lines totalling $6.98, with one line at 61%. The two cities charge similar totals — $4,352 in Redlands, $5,584 in Upland — but the shapes are opposites: Redlands spreads the cost, Upland concentrates it in parks. If the Parks DIF ever moves, Upland’s ADU total moves with it; nothing else in the schedule has that leverage.
The cliff is on the city’s own ADU page
Most cities in this series bury the 750 sq ft cliff in an ordinance or a fee schedule PDF. Upland publishes it on uplandadu.org/permit — the city’s own ADU page — with every line carrying a 750 sq ft minimum. The DIF lines are General Facilities, Police, Parks, Transportation and Storm Drain; water and sewer carry the same minimum. Build at 750 sq ft or under and all seven lines are $0 under Gov. Code §66311.5. Build at 800 and they total $6,320.
That transparency is worth noting because the cliff is the single most valuable number in the post for a homeowner deciding on size. At 750 sq ft the fee column is $0; at 800 it is $6,320; at 1,000 it is $7,900. The 50 sq ft between 750 and 800 costs $6,320 in fees — $126.40 per square foot of fee for 50 square feet of house. That is the cliff, stated plainly on the city’s own page.
Two gaps that matter
This total is a floor, and the two gaps are the reason. We have no verified school district fee for Upland: the Upland Unified School District rate is not in our data, and at the $5.38 state maximum it would add $4,304. We have no verified building permit or plan-check fee either — no rate table, no flat fee, nothing to price. Both are real costs a homeowner will pay; neither is in the $308,000. When they are verified, this post will be updated and the total will rise.
Upland vs. Los Angeles County
| Upland | LA County baseline | |
|---|---|---|
| Total | $308,000 (floor) | $320,000 |
| Per sq ft | $385 | $400 |
| Building permit + plan check | Not verified | carried |
| Impact fees | $5,584 (5 DIF lines) | carried |
| School fee | Not verified | $4,304 |
| Water / sewer | $736 | carried |
| Pre-approved ADU plans | None found | none |
The $12,000 gap to the baseline is the two missing fees, not a cheaper build. If the school fee lands at the $5.38 maximum and the permit fees land near the series norm, Upland will sit at or above the baseline. The real story is the composition: the most parks-heavy DIF schedule in the series, a cliff published on the city’s own ADU page, and a total that is honest about what it does not yet know.
A note on SB 1117
Signed September 2026, effective January 2027: for a homeowner’s first two ADUs, impact fees may apply only to square footage above 750, calculated marginally. Upland’s five DIF lines are all per-square-foot, so the saving is exactly 750 × $6.98 — $5,235 at 1,000 sq ft, and the same $5,235 at 800 sq ft, because the exempted first 750 sq ft is identical at any size above the cliff. See the full comparison at Upland: 2026 vs 2027, line by line. School fees, permit fees and water/sewer charges are outside SB 1117’s impact-fee definition and do not change.
Disclaimer
Model estimate, not a quote. Fees change; the assumptions above are the city’s to confirm — the school district fee and the building permit and plan-check fees are not yet verified and are marked where they appear. Always verify current fees with the City of Upland before budgeting.