Published: 8 Nov 2026 · Last verified: 8 Nov 2026 · Next review: Feb 2027 Cost figures are re-checked against permit records quarterly. Changes are logged in Corrections.
In Vallejo, the sewer district sets the price. The Vallejo Flood & Wastewater District charges a $2,865 sanitary sewer capacity charge for a detached ADU of 800–899 sq ft on the Mainland — a size-banded charge, not a flat rate — and then adds $580 for plan review, $400 for inspection, and $61.94 for permit processing. The four district lines total $3,906.94, more than 80% of the verified fee stack. The city’s own planning fee is $968, itemized down to its surcharges. Our six-phase total lands at $307,000, or $383 per square foot — but it is a floor, not a finished figure. The school district fee and the building permit fee are not yet verified, so they are not in the total at all.
The $968 planning fee is the most itemized line in the post: an $866 base plus 5% General Plan Update ($43), 4% Technology ($34), and 3% Permit Streamlining ($25). The capacity charge is banded — the district’s schedule prices detached ADUs by size, 800–899 sq ft on the Mainland at $2,865, with bands starting at 501 sq ft and contained ADUs never charged. What is not in the total is the school fee and the building permit — no verified rows exist for either, so they are excluded rather than guessed at. Construction phases 2–6 are carried from the Los Angeles County baseline; Vallejo does not publish phase-level construction costs.
The short answer
| 800 sq ft detached ADU · Vallejo · 2026 | Amount |
|---|---|
| Total build cost (floor — see gaps) | $307,000 |
| Cost per square foot | $383 |
| Largest single line | Systems + interior, $147,000 |
| Building permit + plan check | Not verified (gap) |
| ADU planning fee (with surcharges) | $968 |
| Sanitary sewer capacity (VFWD) | $2,865 |
| VFWD plan review + inspection + processing | $1,041.94 |
| School district fee | Not verified (gap) |
| Impact fees | Not verified (gap) |
| Pre-approved ADU plans | None found |
The full line-item breakdown
Six phases. The same six used on every build in this series. Illustrations (not quotes).
| Phase | Cost | Share |
|---|---|---|
| Soft costs (design, permits, fees) | $19,000 | 6% |
| Site work + foundation | $38,000 | 12% |
| Framing + structure | $48,000 | 16% |
| Building envelope | $42,000 | 14% |
| Systems + interior | $147,000 | 48% |
| Landscaping & hardscape | $13,000 | 4% |
| Total | $307,000 | $383 / sq ft |
The fee autopsy
Every fee line we found, with exactly what it is and where it came from.
| Fee line | Amount | Source / status |
|---|---|---|
| Design & engineering | $14,000 | Series baseline, carried — no free pre-approved plans on file for Vallejo |
| ADU planning fee (Planning Division Line 18) | $968 | FY 2026-27 Master Fee Schedule: $866 base + 5% General Plan Update ($43) + 4% Technology ($34) + 3% Permit Streamlining ($25) |
| Sanitary sewer capacity charge — detached ADU, 800–899 sq ft, Mainland | $2,865 | VFWD Schedule of Rates eff. 7/1/2026, District Code 4.04.070: ADU capacity bands; bands start at 501 sq ft; contained ADUs are never charged |
| VFWD plan review — Minor Residential 1–2 units | $580 | VFWD Schedule of Rates eff. 7/1/2026: expressly includes ADU new construction, up to 3 submittals, per permit |
| VFWD sewer inspection | $400 | VFWD Schedule of Rates eff. 7/1/2026, Development Services Administrative Fees: inspection, per permit |
| VFWD permit processing | $61.94 | VFWD Schedule of Rates eff. 7/1/2026, Development Services Administrative Fees: permit processing, per permit/per unit |
| Building permit + plan check | not verified | No verified building-permit row on file for Vallejo — not in the total |
| School district fee | not verified | No verified school-fee row on file for Vallejo — not in the total |
| Impact fees | not verified | No verified impact-fee row on file for Vallejo — not in the total |
Soft costs in the breakdown table are rounded to $19,000 (exact $18,874.94); the total is rounded to the nearest $1,000.
The city’s fee lines are also listed on the Vallejo fee page, with verification status and source links.
A banded sewer charge
The $2,865 capacity charge is the quirk, and the band is the point. The Vallejo Flood & Wastewater District does not charge a flat sewer fee: it prices detached ADUs by size band, and 800–899 sq ft on the Mainland is $2,865. A smaller ADU would fall in a lower band; a contained ADU — one inside the existing structure — is never charged at all. The band is where the money is: the capacity charge alone is more than half the verified fee stack, and the district’s four lines together are over 80% of it.
The planning fee is the other end of the same story. Where the district prices by band, the city prices by surcharge: $866 base, then 5% for the General Plan Update, 4% for Technology, and 3% for Permit Streamlining, each computed and shown. Nothing in this post is a single unexplained number — the two priced lines are both shown down to their components.
Two gaps that matter
This total is a floor, and the two gaps are the reason. We have no verified school district fee for Vallejo — at the $5.38 state maximum it would add $4,304. We have no verified building permit or plan-check fee either — the $968 ADU planning fee is a planning line, and the building permit itself is a separate, unpriced line. We have no verified impact fee at all, so this post claims nothing about Vallejo’s impact fees, $0 or otherwise. All three are real costs a homeowner will pay; none is in the $307,000. When they are verified, this post will be updated and the total will rise.
Vallejo vs. Los Angeles County
| Vallejo | LA County baseline | |
|---|---|---|
| Total | $307,000 (floor) | $320,000 |
| Per sq ft | $383 | $400 |
| Building permit + plan check | Not verified | carried |
| ADU planning fee | $968 | carried |
| Sewer (VFWD) | $3,906.94 | carried |
| School fee | Not verified | $4,304 |
| Impact fees | Not verified | carried |
| Pre-approved ADU plans | None found | none |
The $13,000 gap to the baseline is the missing fees, not a cheaper build. If the school fee lands at the $5.38 maximum it adds $4,304, and a building permit near the series norm would add several thousand more — Vallejo would sit at or above the baseline. The real story is the composition: a sewer district that prices by size band, and a ledger that is honest about what it does not yet know.
The ADU law box
Three state rules frame every number above. Under Government Code §65852.2(f)(3)(A), a local agency may not impose impact fees on an ADU under 750 square feet; at 750 or above, fees are charged proportionately to the primary dwelling’s size. Under §66311.5 (SB 1117, effective January 1, 2027), per-square-foot impact fees on two or fewer ADUs are charged only on the area above 750 square feet — 50 square feet on this 800 sq ft benchmark — and connection and capacity charges are excluded from that rule. School fees are a separate statute: under SB 543, ADUs under 500 square feet pay $0 in school fees, and at 800 square feet the full district rate applies. SB 1117 does not reduce school fees, and it does not change any line counted in this post: no impact fee is counted, the sewer capacity charge is a connection/capacity charge outside SB 1117, and the school fee is untouched by SB 1117.
A note on SB 1117
Signed September 2026, effective January 2027: for a homeowner’s first two ADUs, impact fees may apply only to square footage above 750, calculated marginally. No impact fee is counted in this ledger, and the sewer capacity charge is a connection/capacity charge outside SB 1117’s impact-fee definition, so SB 1117 changes nothing we can compute here. See the full comparison at Vallejo: 2026 vs 2027, line by line. School fees and permit fees are outside SB 1117’s impact-fee definition and do not change.
What this post does not claim
It does not claim the building permit is $0 — it is unverified and excluded; the $968 ADU planning fee is a planning line, not the building permit. It does not claim Vallejo’s impact fees are $0 — no impact-fee row is on file, so this post claims nothing about them. It does not claim the $2,865 sewer charge applies to every Vallejo ADU — it is the 800–899 sq ft Mainland band; other sizes and areas pay other bands, and contained ADUs are never charged. Construction phases 2–6 are the series baseline, not Vallejo bids.
Disclaimer
Model estimate, not a quote. Fees change; the assumptions above are the city’s to confirm — the school district fee, the building permit fee, and impact fees are not yet verified and are marked where they appear. Always verify current fees with the City of Vallejo before budgeting.
Sources
- City of Vallejo, FY 2026-27 Master Fee Schedule — Planning Division Line 18: ADU planning fee $866 base + surcharges = $968. https://www.vallejo.gov/common/pages/GetFile.ashx?key=5o1FAVxz
- Vallejo Flood & Wastewater District, Schedule of Rates (effective July 1, 2026) — sanitary sewer capacity $2,865 (detached ADU 800–899 sq ft, Mainland); plan review $580; inspection $400; permit processing $61.94. https://www.vallejowastewater.org/DocumentCenter/View/1986/FY-2026-27-Schedule-of-Fees-and-Charges_Master
Last updated: 8 Nov 2026